  1. Slide 1: CCC Presentation Hera-Federation Complex Project Update

    CCC Presentation Hera-Federation Complex Project Update 11 November 2025 ASX Code: AMI

  2. Slide 2: Acknowledgement of Country

    Acknowledgement of Country • Aurelia Metals Ltd respectfully acknowledges the Ngiyampaa Nation as the Traditional Custodians of this land – both past and present. • We know this land has history, custodians and stories, spanning tens of thousands of years, that endure to this day. • We pay our respe

  3. Slide 3: Federation-Hera Complex: Progress Update

    3 Federation-Hera Complex: Progress Update Tracking Key Dates • Kidman Way upgrade: originally scheduled to start at Priory Tank Road on 15 Feb 2025 and then move to the Peak intersection. Due to TfNSW design-approval delays, works are now likely to commence in Sep/Oct 2025. • Independent Environmen

  4. Slide 4: Federation – Mine Ramp Up ahead of plan with costs in line

    4 Federation – Mine Ramp Up ahead of plan with costs in line

  5. Slide 5: Federation Mine Development

    5 Federation Mine Development Federation development 10/11/2025

  6. Slide 6: Federation Mine Development

    6 Federation Mine Development Federation development Nov 2025

  7. Slide 7: Federation Ramping Up

    Federation Ramping Up FEDERATION RAMPING UP nd production 2 f {GB_FY25 dovolopment and stoping FY26 development and sto pm ping aurelia

  8. Slide 8: Environment and Community

    Environment and Community 11 November 2025 ASX Code: AMI

  9. Slide 9: Environment and Community: Project Approval Modification MOD 2

    9 Environment and Community Project Approval Modification — MOD 2 • The IEA (Independent Environmental Audit) with the findings and timing for completion was submitted to the DPHI, DCCEEW, NSW Resource Regulator, EPA, CSC, BSC and uploaded to the company’s public website • Several actions have alrea

  10. Slide 10: Environmental Priorities, Improvement Initiatives and Complaints

    10 Environment and Community Environmental Priorities, Improvement Initiatives and Complaints Priorities and improvement initiatives • Follow-up actions arising from questions at the last CCC meeting regarding public roads: 1. Allocation of Federation VPA funding to roads a. Email sent to Cobar Shir

  11. Slide 11: Environmental Priorities, Improvement Initiatives and Complaints

    11 Environment and Community Environmental Priorities, Improvement Initiatives and Complaints Priorities and improvement initiatives • Dewatering remains a priority. Preliminary investigations have commenced into the various options available: transferring underground water from Federation to underg

  12. Slide 12: Groundwater Monitoring

    12 Groundwater Monitoring Groundwater monitoring completed in September. Quarterly SWL for Hera Bores.

  13. Slide 13: Groundwater Monitoring

    13 Groundwater Monitoring Groundwater monitoring completed in September. Quarterly SWL and water quality for Federation bores

  14. Slide 14: Air Quality Monitoring network

    14 Air Quality Monitoring network

  15. Slide 15: Air Quality – HVAS PM10

    15 Air Quality - HVAS PM,, | oos0 PM 10 (ug/m*) yh @o@ B a Oo Oo o oO soe aS aurelig".

  16. Slide 16: Air Quality – HVAS TSP

    16 Air Quality - HVAS TSP 250 200 = & 150 D = % 100 50 il, ull | ll ull Ar tll oe Rae om os 9 os Sos ee KS OO ow aig as) ») a> wo Ses BP APs wv Ky oS nt He aurelig".

  17. Slide 17: Air quality - EBAM

    17 Air quality - EBAM EBAM average daily concentrations of PM10. Comparison to NEPM criteria

  18. Slide 18: Air Quality – E-Sampler

    18 Air Quality – E-Sampler 1 E- sampler 1 was serviced on 6 August 2025

  19. Slide 19: Air Quality – E-Sampler

    19 Air Quality – E-Sampler 2 E- sampler 2 had an intermittent fault throughout August which resulted in limited data capture. The issue was rectified and data capture improved for September 2025.

  20. Slide 20: Trucking to Peak

    20 Trucking to Peak Note – Return trip from Federation to The Peak is counted as two movements. Average Total Quantity Month No. movements movements (tonnes) July 574 18.52 21606.3 August 354 21.1 24500.7 September 516 17.2 19150.8

  21. Slide 21: Blasting

    21 Blasting Number of blasts each month were: July – 82 blasts August - 76 blasts September – 77 blasts One exceedance was recorded in on 9th September when the overpressue (dB linear peak) criteria of 120dB was exceeded. The blast monitoring result was 121dB linear peak. Comparison to weather data

  22. Slide 22: Exploration

    Exploration 11 November 2025 ASX Code: AMI

  23. Slide 23: Exploration Update

    23 Exploration Update Nymagee District • Surface drilling was completed at Federation West (totaling 663m) early in the quarter before mobilising to the Nymagee project for the remainder of the quarter. Exploration drilling was designed to extend mineralisation along strike at Nymagee North and asse

  24. Slide 24: Exploration Update - continued

    24 Exploration Update - continued