Nexus Minerals Ltd. · ASX:NXM

Nexus Minerals — Diggers and Dealers Conference 2025

22 slides from Nexus Minerals's conference presentation, Aug 4, 2025

  1. Slide 1: Company Presentation - Diggers and Dealers Conference

    COMPANY PRESENTATION DIGGERS AND DEALERS CONFERENCE 4 AUGUST 2025 nexus-minerals.com 1

  2. Slide 2: Disclaimer

    DISCLAIMER • This document contains forward looking statements. Forward looking statements are not based on historical facts, but are based on Nexus’s current expectations of future results or events. These forward looking statements are subject to risks, uncertainties and assumptions which could ca

  3. Slide 3: Cautionary Statement - Scoping Study

    CAUTIONARY STATEMENT - SCOPING STUDY The Scoping Study referred to in this presentation (slide 9) is based on the material assumptions outlined in the announcement released to ASX on 4 June 2024. The Scoping Study has been undertaken to determine the viability of open pit mining and third-party toll

  4. Slide 4: About Nexus Minerals

    ABOUT NEXUS MINERALS CORPORATE OVERVIEW NXM OVERVIEW NEXUS MINERALS LIMITED ASX: NXM SHARES 603.7M SHARE PRICE A$0.061 MARKET CAP A$36.7M CASH (30/06/2025) A$11.2M ENTERPRISE VALUE A$24M TOP 20 45% *ASX: NXM (6months) BOARD & MANAGEMENT CHAIRMAN MR PAUL BOYATZIS 42 years equity markets and corporate

  5. Slide 5: Company Projects

    COMPANY PROJECTS WESTERN AUSTRALIA GOLD Wallbrook Project - Large scale gold deposits Pinnacles Project – High grade U/G deposit GOLD GOLD GOLD 5

  6. Slide 6: Wallbrook Gold Project

    COMPANY PROJECT WALLBROOK GOLD PROJECT WESTERN AUSTRALIA / EASTERN GOLDFIELDS • 140km northeast of Kalgoorlie in-between Northern Star’s Carosue Dam Operations and Porphyry Mining Centre Operations • Northern Star mining Porphyry Mining Centre sending ore to their Carosue Dam Operations 3.2Mtpa Mill

  7. Slide 7: Crusader-Templar Prospect - MRE

    COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS CRUSADER-TEMPLAR PROSPECT - MRE 1.6km strike mineralised corridor / 100% Nexus’ owned Combined Mineral Resource Estimate (MRE) 5.67Mt @ 1.7g/t Au for 304,000 ounces including: • Indicated: 2.46Mt @ 1.8g/t Au for 140,000 o

  8. Slide 8: Crusader-Templar Prospect - MRE

    COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS CRUSADER-TEMPLAR PROSPECT - MRE 8

  9. Slide 9: Crusader-Templar Scoping Study

    COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS CRUSADER-TEMPLAR SCOPING STUDY Utilising third-party processing plants toll treatment agreement $3,000 gold price used for study pit shell optimisations Using a gold price of $3,500 the Production Target mining inventory

  10. Slide 10: Crusader-Templar Scoping Study

    COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS CRUSADER-TEMPLAR SCOPING STUDY 1.6km Strong grade and mineralisation continuity over the 1.6km from Crusader South to Templar North  Next Steps – Mining Proposal and Closure Plan + Operational Permits submitted for approva

  11. Slide 11: Emerging Gold Camp

    COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS EMERGING GOLD CAMP • Regional “Gold Camp” prospectivity • 5 Mineralised Corridors identified to date – MC1 to MC5 • ~90% of 192km2 tenement package yet to be explored • Heritage ground survey completed – full clearance • 18

  12. Slide 12: Branches Prospect

    COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS BRANCHES PROSPECT Mineralised corridor now 1.1km x 300m (remains open) RC drill results have included: • 5m @ 17.91g/t Au (within 8m @ 11.37g/t Au from 118m) • 5m @ 5.45g/t Au (within 36m @ 2.04g/t Au from 43m) • 12m @ 5.

  13. Slide 13: Payns Prospect – Regional RC and Aircore Drill Success

    COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS PAYNS PROSPECT – REGIONAL RC AND AIRCORE DRILL SUCCESS NEW DISCOVERY - 900 x 750m Mineralised Zone Assay results received from Nexus RC drill program incl: • 8m @ 7.99 g/t Au (within 24m @ 2.80 g/t Au) from 40m • 8m @ 2.85

  14. Slide 14: New Discovery – Payns Prospect

    COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS NEW DISCOVERY – PAYNS Prospect - 900 x 750m Mineralised Zone  High-grade near surface gold discovery  Gold associated with quartz + goethite veining; and = The Regional Gold Signature  Sericite-rutile-tourmaline-albite a

  15. Slide 15: Wallbrook Regional Results – Godfrey Prospect

    COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS WALLBROOK REGIONAL RESULTS – REGIONAL AIRCORE DRILL SUCCESS NEW DISCOVERY – GODFREY Prospect Mineralised corridor 1200m x 100m gold anomaly Mineralisation within sheared & hematite altered quartz porphyries Similar to Ne

  16. Slide 16: Wallbrook Regional Results – Clement Prospect

    COMPANY PROJECTS WALLBROOK GOLD PROJECT WESTERN AUSTRALIA/EASTERN GOLDFIELDS WALLBROOK REGIONAL RESULTS – REGIONAL AIRCORE DRILL SUCCESS CLEMENT Prospect (Incorporating Target MC2.1) Mineralised corridor 650m x 250m gold anomaly Mineralisation within sheared & hematite altered quartz porphyries P

  17. Slide 17: Pinnacles JV (with NST)

    COMPANY PROJECTS PINNACLES JV WESTERN AUSTRALIA/EASTERN GOLDFIELDS PINNACLES JV (WITH NST) NXM 90% : NST 10% contributing JV JORC 2012 Combined MRE 609,000t @ 4.0g/t Au for 78,000oz (O/P+U/G) JORC 2012 U/G MRE 450,000t @ 4.6g/t Au for 66,000oz Au (U/G only) U/G Mine development options study und

  18. Slide 18: Underground Study 80m – 280m

    COMPANY PROJECTS PINNACLES JV WESTERN AUSTRALIA/EASTERN GOLDFIELDS PINNACLES JV WITH NST Underground Study 80m – 280m Conceptual Design Only  Next Steps – Prepare Mining Proposal and Closure Plan + Operational Permits (See ASX release 13/10/2016) 18

  19. Slide 19: NSW Mineral Project – First Mover Advantage – Mega Peg

    COMPANY PROJECTS CRITICAL MINERAL TARGETS NEW SOUTH WALES NSW MINERAL PROJECT – First Mover Advantage – “Mega Peg” • Nexus Minerals has been granted over 7,500km2 of prospective tenure • First mover advantage allows for regional scale exploration targeting with one of the largest pegging exercises i

  20. Slide 20: NSW Mineral Project – 7,500km2 Mega Peg

    COMPANY PROJECTS CRITICAL MINERAL TARGETS NEW SOUTH WALES NSW MINERAL PROJECT – 7,500km2 “Mega Peg” • A review of open file geology and whole-rock geochemistry confirmed that much of the exploration ground granted in southern NSW is underlain by reduced, fractionated, peraluminous S-type granites •

  21. Slide 21: Summary

    SUMMARY WESTERN AUSTRALIA GOLD NSW MINERAL PROJECT Wallbrook Gold Project - highly prospective and strategic landholding NSW Mineral Project – ~7,500km2 granted tenure • Crusader-Templar Prospect - 300k+ resource  First mover advantage regional scale exploration • Branches Prospect – Resource drill

  22. Slide 22: Appendix 1 JORC Tables

    SUMMARY APPENDIX 1 JORC TABLES Crusader-Templar Prospect Combined JORC 2012 Mineral Resource Estimate (0.4g/t Au cut-off) Pinnacles Project Combined JORC 2012 Mineral Resource Estimate 22

Nexus Minerals — Diggers and Dealers Conference 2025 on 6ix