Cullen Resources Limited · ASX:CUL

Cullen Resources — Investor Presentation (February 2014)

17 slides from Cullen Resources's investor presentation, February 2014

  1. Slide 1: Investor Update - February 2014

    Slide 1: Investor Update - February 2014

    INVESTOR UPDATE - FEBRUARY 2014 EXCITING EM CONDUCTORS IN PRIME GEOLOGICAL SETTING TARGETING MASSIVE Ni SULPHIDES MT EUREKA PROJECT, NE GOLDFIELDS, GOLDFIELDS WA “AK47” NICKEL PROSPECT CORE

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER IMPORTANT NOTICE This presentation has been prepared by Cullen Resources Limited ACN 006 045 790 (Cullen) for general information purposes only. The presentation is not and should not be considered as an offer or invitation to subscribe for or purchase any securities in Cullen, or as an i

  3. Slide 3: Opportunities in 2014

    Slide 3: Opportunities in 2014

    OPPORTUNITIES IN 2014  FIVE DRILL-READY EM CONDUCTORS FOR NICKEL MT EUREKA PROJECT, W.A. PART OF POSSIBLE NEW NICKEL PROVINCE NEAR RECENT DISCOVERIES (ROX)  DRILL-READY TARGETS FOR GOLD MT EUREKA PROJECT , W W.A. A GREENSTONE BELT PARALLEL TO YANDAL BELT  RESOURCES OF IRON ORE IN TWO WEST PILBARA

  4. Slide 4: Mt Eureka Project

    Slide 4: Mt Eureka Project

    121° 122° MT EUREKA HORSE WELL N YANDAL Au PROJECT JUNDEE 40 kilometres MT EUREKA  Great address Wiluna AK47 DOYLES  Under explored MT CAMELWOOD COLLURABBIE FISHER  Gold and nickel potential DUKETON 27° MT KEITH Au + Ni  Close to new nickel CLIFFS MT McCLURE BRONZEWING MELROSE sulphide discovery

  5. Slide 5: Mt Eureka Project

    Slide 5: Mt Eureka Project

    MT EUREKA PROJECT Airborne EM Conductor Doyles and/or Ni prospects 11m @ 0.86% Ni (Cullen) (40 - 51m) VTEM Conductor “AK47” p prospect p (Rox Resources) 0.2m @ 1.93% Ni Cullen Limit of previous completed Airborne EM ground EM surveying over VTEM anomalies Cullen project Cullen completed VTEM survey

  6. Slide 6: Previous discovery at AK47 Prospect (WMC/Cullen JV)

    Slide 6: Previous discovery at AK47 Prospect (WMC/Cullen JV)

    Previous discovery at AK47 PROSPECT (WMC/Cullen JV) 20cm @ 1.93 % Ni, 0.42% Cu, 0.7 g/t Pt+Pd (Hole GBD2) indicates fertility for Ni sulphide

  7. Slide 7: Cullen's Planned Drilling

    Slide 7: Cullen's Planned Drilling

    CULLEN’S PLANNED DRILLING  SILVERBARK NORTH NICKEL PROSPECT MT EUREKA PROJECT , W.A. – interpreted p by y Cullen to be alongg strike from nickel sulphide discoveries (ROX)  DOYLES NICKEL PROSPECT MT EUREKA PROJECT , W.A. – two strong EM conductors in ultramafic sequence, q , with anomalous nickel

  8. Slide 8: Silverbark North Nickel Prospect

    Slide 8: Silverbark North Nickel Prospect

    SILVERBARK NORTH NICKEL PROSPECT Aeromagnetic Image 1st order VTEM conductor trend (Cullen) – not yet drill tested Regards Trend of 1st order VTEM conductors partially drill tested (Cullen) 2nd order VTEM Conductor and/or Ni prospects (Cullen) VTEM Conductor/Ni prospects (Rox Resources) Cullen Mt Eu

  9. Slide 9: Schematic Cross Section – Cullen's Silverbark North Nickel Target

    Slide 9: Schematic Cross Section – Cullen's Silverbark North Nickel Target

    SCHEMATIC CROSS SECTION – CULLEN’S SILVERBARK NORTH NICKEL TARGET (~1km ground EM conductor trend) Planned RC hole W Regolith g E Previous RC holes (2) abandoned in chert UM Felsic/ ? sediment? Mafic Mafic M f Mafic --- Proposed +100m drill ~100m hole extension to intersect conductor – massive nicke

  10. Slide 10: Doyles Nickel Prospect – Historic Data

    Slide 10: Doyles Nickel Prospect – Historic Data

    DOYLES NICKEL PROSPECT – HISTORIC DATA Compilation of historical exploration data around Doyles Prospect with up to 11m @ 0.86% Ni (on Aeromagnetic Image)

  11. Slide 11: Doyles Nickel Prospect – Recent Ground EM

    Slide 11: Doyles Nickel Prospect – Recent Ground EM

    DOYLES NICKEL PROSPECT – RECENT GROUND EM Main geological units on EM image MLTEM time slice image (linear colour stretch – channel 25) showing 3 conductors – C1 to C3

  12. Slide 12: Schematic Geology Plan – Doyles Nickel Prospect Ground EM Conductors

    Slide 12: Schematic Geology Plan – Doyles Nickel Prospect Ground EM Conductors

    SCHEMATIC GEOLOGY PLAN – DOYLES NICKEL PROSPECT GROUND EM CONDUCTORS C1, C2 and C3 Mafic ‘C3’ UM UM Ultramafic with ?disseminated nickel sulphide UM ‘C2’ ‘C1’ Possible nickel Sulphide lenses Felsic BIF BIF? BIF BIF Felsic/sediment? ~1000 m

  13. Slide 13: Schematic Cross Section – Doyles Nickel Targets

    Slide 13: Schematic Cross Section – Doyles Nickel Targets

    SCHEMATIC CROSS SECTION – DOYLES NICKEL TARGETS, Conductors C1 and C2 Planned RC hole W Regolith g E Felsic/ sediment Felsic? Mafic Mafic UM UM BIF ~100m

  14. Slide 14: Mt Eureka Gold Targets

    Slide 14: Mt Eureka Gold Targets

    MT EUREKA GOLD TARGETS COMPILED HISTORIC DATA Firstt priority Fi i it target NW-SE structures 7m @ 9.0g/t Au, & under channel 9m @ 6.2g/t g/ Au 7m @ 6.7g/t Au

  15. Slide 15: Pipeline of Projects & Multiple Active JVs

    Slide 15: Pipeline of Projects & Multiple Active JVs

    Pipeline of Projects & Multiple Active JVs Cullen contributing @ 30%

  16. Slide 16: Conclusions

    Slide 16: Conclusions

    CONCLUSIONS  CULLEN FOCUSED ON: EXPLORATION IN AUSTRALIA SOME PROGRAMS SUPPORTED BY R&D TAX REFUNDING AND STATE GOVERNMENT DRILLING INCENTIVE SCHEMES  FIVE DRILL READY TARGETS FOR MASSIVE NICKEL SULPHIDE  DRILL READY TARGETS FOR GOLD  CULLEN OWNS RESOURCES OF IRON ORE IN TWO WEST PILBARA JV’S 

  17. Slide 17: Attribution - Competent Person Statements

    Slide 17: Attribution - Competent Person Statements

    Attribution - Competent Person Statements The Information in this presentation that relates to Exploration Results for the Mt Eureka project is extracted from Cullen’s ASX announcements of 22 and 30 of January 2014 entitled : “Strong EM conductors identified, Mt Eureka greenstone belt” and “ Quarter

Source: Internet Archive copy of cullenresources.com.au

More decks from Cullen Resources Limited

All 42 Cullen Resources decks