Cullen Resources Limited · ASX:CUL
Cullen Resources — Investor Presentation (February 2014)
17 slides from Cullen Resources's investor presentation, February 2014

Slide 1: Investor Update - February 2014
INVESTOR UPDATE - FEBRUARY 2014 EXCITING EM CONDUCTORS IN PRIME GEOLOGICAL SETTING TARGETING MASSIVE Ni SULPHIDES MT EUREKA PROJECT, NE GOLDFIELDS, GOLDFIELDS WA “AK47” NICKEL PROSPECT CORE

Slide 2: Disclaimer
DISCLAIMER IMPORTANT NOTICE This presentation has been prepared by Cullen Resources Limited ACN 006 045 790 (Cullen) for general information purposes only. The presentation is not and should not be considered as an offer or invitation to subscribe for or purchase any securities in Cullen, or as an i

Slide 3: Opportunities in 2014
OPPORTUNITIES IN 2014 FIVE DRILL-READY EM CONDUCTORS FOR NICKEL MT EUREKA PROJECT, W.A. PART OF POSSIBLE NEW NICKEL PROVINCE NEAR RECENT DISCOVERIES (ROX) DRILL-READY TARGETS FOR GOLD MT EUREKA PROJECT , W W.A. A GREENSTONE BELT PARALLEL TO YANDAL BELT RESOURCES OF IRON ORE IN TWO WEST PILBARA

Slide 4: Mt Eureka Project
121° 122° MT EUREKA HORSE WELL N YANDAL Au PROJECT JUNDEE 40 kilometres MT EUREKA Great address Wiluna AK47 DOYLES Under explored MT CAMELWOOD COLLURABBIE FISHER Gold and nickel potential DUKETON 27° MT KEITH Au + Ni Close to new nickel CLIFFS MT McCLURE BRONZEWING MELROSE sulphide discovery

Slide 5: Mt Eureka Project
MT EUREKA PROJECT Airborne EM Conductor Doyles and/or Ni prospects 11m @ 0.86% Ni (Cullen) (40 - 51m) VTEM Conductor “AK47” p prospect p (Rox Resources) 0.2m @ 1.93% Ni Cullen Limit of previous completed Airborne EM ground EM surveying over VTEM anomalies Cullen project Cullen completed VTEM survey

Slide 6: Previous discovery at AK47 Prospect (WMC/Cullen JV)
Previous discovery at AK47 PROSPECT (WMC/Cullen JV) 20cm @ 1.93 % Ni, 0.42% Cu, 0.7 g/t Pt+Pd (Hole GBD2) indicates fertility for Ni sulphide

Slide 7: Cullen's Planned Drilling
CULLEN’S PLANNED DRILLING SILVERBARK NORTH NICKEL PROSPECT MT EUREKA PROJECT , W.A. – interpreted p by y Cullen to be alongg strike from nickel sulphide discoveries (ROX) DOYLES NICKEL PROSPECT MT EUREKA PROJECT , W.A. – two strong EM conductors in ultramafic sequence, q , with anomalous nickel

Slide 8: Silverbark North Nickel Prospect
SILVERBARK NORTH NICKEL PROSPECT Aeromagnetic Image 1st order VTEM conductor trend (Cullen) – not yet drill tested Regards Trend of 1st order VTEM conductors partially drill tested (Cullen) 2nd order VTEM Conductor and/or Ni prospects (Cullen) VTEM Conductor/Ni prospects (Rox Resources) Cullen Mt Eu

Slide 9: Schematic Cross Section – Cullen's Silverbark North Nickel Target
SCHEMATIC CROSS SECTION – CULLEN’S SILVERBARK NORTH NICKEL TARGET (~1km ground EM conductor trend) Planned RC hole W Regolith g E Previous RC holes (2) abandoned in chert UM Felsic/ ? sediment? Mafic Mafic M f Mafic --- Proposed +100m drill ~100m hole extension to intersect conductor – massive nicke

Slide 10: Doyles Nickel Prospect – Historic Data
DOYLES NICKEL PROSPECT – HISTORIC DATA Compilation of historical exploration data around Doyles Prospect with up to 11m @ 0.86% Ni (on Aeromagnetic Image)

Slide 11: Doyles Nickel Prospect – Recent Ground EM
DOYLES NICKEL PROSPECT – RECENT GROUND EM Main geological units on EM image MLTEM time slice image (linear colour stretch – channel 25) showing 3 conductors – C1 to C3

Slide 12: Schematic Geology Plan – Doyles Nickel Prospect Ground EM Conductors
SCHEMATIC GEOLOGY PLAN – DOYLES NICKEL PROSPECT GROUND EM CONDUCTORS C1, C2 and C3 Mafic ‘C3’ UM UM Ultramafic with ?disseminated nickel sulphide UM ‘C2’ ‘C1’ Possible nickel Sulphide lenses Felsic BIF BIF? BIF BIF Felsic/sediment? ~1000 m

Slide 13: Schematic Cross Section – Doyles Nickel Targets
SCHEMATIC CROSS SECTION – DOYLES NICKEL TARGETS, Conductors C1 and C2 Planned RC hole W Regolith g E Felsic/ sediment Felsic? Mafic Mafic UM UM BIF ~100m

Slide 14: Mt Eureka Gold Targets
MT EUREKA GOLD TARGETS COMPILED HISTORIC DATA Firstt priority Fi i it target NW-SE structures 7m @ 9.0g/t Au, & under channel 9m @ 6.2g/t g/ Au 7m @ 6.7g/t Au

Slide 15: Pipeline of Projects & Multiple Active JVs
Pipeline of Projects & Multiple Active JVs Cullen contributing @ 30%

Slide 16: Conclusions
CONCLUSIONS CULLEN FOCUSED ON: EXPLORATION IN AUSTRALIA SOME PROGRAMS SUPPORTED BY R&D TAX REFUNDING AND STATE GOVERNMENT DRILLING INCENTIVE SCHEMES FIVE DRILL READY TARGETS FOR MASSIVE NICKEL SULPHIDE DRILL READY TARGETS FOR GOLD CULLEN OWNS RESOURCES OF IRON ORE IN TWO WEST PILBARA JV’S

Slide 17: Attribution - Competent Person Statements
Attribution - Competent Person Statements The Information in this presentation that relates to Exploration Results for the Mt Eureka project is extracted from Cullen’s ASX announcements of 22 and 30 of January 2014 entitled : “Strong EM conductors identified, Mt Eureka greenstone belt” and “ Quarter
Source: Internet Archive copy of cullenresources.com.au
More decks from Cullen Resources Limited
Shareholder Meeting (November 2026)19 slides · Nov 17, 2026
Shareholder Meeting (November 2025)21 slides · November 2025
Shareholder Meeting (November 2024)18 slides · Nov 21, 2024
Investor Presentation (June 2024)19 slides · June 2024
Investor Presentation (August 2023)19 slides · Aug 31, 2023
Investor Presentation (June 2023)20 slides · Jun 26, 2023