Slide 1: Investor update
Investor update The new GBM: accelerated exploration delivering critical resource scale February 2020 ASX:GBZ
Slide 2: Important notices
Important notices This Document is Confidential and may not be reproduced, redistributed or passed on, directly or indirectly. This Document is not a Prospectus nor an Offer to Subscribe for Shares. GBM and its Directors, employees and consultants make no representations or warranty as to the accura
Slide 3: The new GBM proposition
The new GBM proposition Re-energised corporate profile Key focus: Critical mass at Mt Coolon Au New board and management bring high profile expertise Underexplored, district-scale gold-silver exploration opportunity; only limited shallow drilling over the last two decades; granted MLs Team tra
Slide 4: …against a strengthened backdrop
…against a strengthened backdrop 4
Slide 5: A consolidated, clean capital structure
A consolidated, clean capital structure Capital structure (ASX: GBZ) Board / Management Shares on issue 192.9 M Peter Mullens Executive Chairman Share price (6th February 2020) A$0.07 Peter Rohner Managing Director Market capitalisation (undiluted) A$13.5 M Sunny Loh Non-Executive – Deputy Chairman
Slide 6: A new team with a proven track record
A new team with a proven track record Peter Rohner, Managing Director Peter Mullens, Executive Chairman Metallurgist (BSc, Grad. Dip Applied Finance) with 32 years’ project development and metallurgical plant operations Geologist (BSc, FAusIMM) with 35 years’ experience international experience
Slide 7: A high-calibre project portfolio
A high-calibre project portfolio Located in the premier metallogenic provinces of Eastern Australia WORLD-CLASS LOW VICTORIA – THE PLACE TO BE EARLY CASHFLOW SULPHIDATION TARGETS: FOR HIGH-GRADE GOLD: OPPORTUNITY: Mt Coolon Gold Project – 1,252 km2 (100%) Malmsbury Gold Project – 7 km2 (100%) White
Slide 8: The targeted path forward
The targeted path forward 1Q 2Q 3Q 4Q 1Q 2Q 2020 2020 2020 2020 2021 2021 Re-evaluate defined oxide resources given higher gold price and permitted ML and heap leach operation MT COOLON GOLD- SILVER PROJECT: Detailed analysis and targeting of down-plunge drill targets at Fast-tracked build of Koala,
Slide 9: Mount Coolon Gold-Silver Project
Mount Coolon Gold- Silver Project
Slide 10: Why focus on epithermal gold-silver in the Drummond Basin?
Why focus on epithermal gold-silver in the Drummond Basin? 1 GBM’s new management team has significant global epithermal experience Ravenswood 2 GBM’s new management team has a track record of discovering substantial epithermal Au-Ag deposits Mt Leyshon Pajingo 3 GBM views the Drummond Basin as unde
Slide 11: District-scale, 100%-owned Mt Coolon tenure package
District-scale, 100%-owned Mt Coolon tenure package Mt Coolon is an underexplored, district-scale LSE goldfield comparable in areal extent to the +7 Moz Cerro Negro Gold District There was exploration by four companies with over 100 holes drilled at Cerro Negro before the large, high-grade depos
Slide 12: Targeting +1 Moz resource build in Australia's premier epithermal province
Targeting +1 Moz resource build in Australia’s premier epithermal province GBM Resources GBM Mt. Coolon District Mt Coolon District Tonnes Au Au oz Prioritising exploration at Mt Coolon focussed Mt. Coolon District Claims totalling 1252 km² Gold Resources (000's) (g/t) (000's) on discovery of new
Slide 13: Koala deposit
Koala deposit Historic open pit and underground production to 1990’s of 0.59 Mt at 12.2 g/t Au for 232 koz1 Koala Deposit In Situ Gold Resource Estimate, JORC 20123 Current in-pit JORC resource of 0.86 Mt at 3.02 g/t Au for 83.6 koz 2 (estimated at A$1,667/oz) Resource Mine Model Cut-off Tonnes
Slide 14: Glen Eva deposit
Glen Eva deposit Looking North East, +/- 40m Historic production during 1990’s of 154 kt at 7.5 g/t Au for 37 koz1 GBM Proposed Pit at GLD 0001 gold A$1,667/oz Current in-pit resource2 of 0.68 Mt at 2.3 g/t Au for 51 koz (estimated at NW (Projected collar) GLD 0002 SE A$1,667/oz) Mined Pit Mined
Slide 15: Eugenia deposit
Eugenia deposit Eugenia Deposit Gold Resource Estimate (2017)1 Discovered 1989; no gold Au production to date W E Resource Cut-off Tonnes Au Ounces 250 m RL Proposed Pit Category (>= g/t) (000's) (g/t) (000's) Current in-pit resources of Proposed Pit W GBM Proposed Pit E Oxide Indicated 0.4 885
Slide 16: Eugenia early-stage heap leach opportunity
Eugenia early-stage heap leach opportunity Significant oxide resource offers potential heap leach option to deliver Oxide material not currently included in concept pit heap early-stage cashflow leach resources W E In-pit resource estimate for oxide heap leach option of 1.08 Mt at 0.8 g/t Au for
Slide 17: Existing Mt Coolon Scoping Study
Existing Mt Coolon Scoping Study GBM ASX Announcement, 4 December 2017 Scoping Study Scoping Study Operating parameters Units Financial parameters Units (Dec 2017) (Dec 2017) KEY OUTCOMES Production mine life years 5.5 Forecast gold price (LOM avg) US$/oz 1,250 Total mined ore1 Mt 3.0 Forecast A$/US
Slide 18: Malmsbury Gold Project
Malmsbury Gold Project
Slide 19: Malmsbury: Historic mining district in highly prospective central Vic. goldfields
Malmsbury: Historic mining district in highly prospective central Vic. goldfields GBM Resources 100% owned 7 km2 retention licence application covering the Murray Basin historic Belltopper - Drummond North goldfield; regrant expected Cover Malmsbury Project 7 km² Catalyst Metals 1Q 2020 Gold Proje
Slide 20: Malmsbury: Intrusion related gold
Malmsbury: Intrusion related gold Leven Star Reef Intermittent exploration of the Belltopper - Drummond North field is recorded from 1964 to 2007 Historic production Initial Resource when GBM gained control of the goldfield 98 kt ore at 29 g/t Au for ~ 91,000 ounces gold 820 kt at 3.95 g/t Au GB
Slide 21: White Dam Gold-Copper HL Operation
White Dam Gold- Copper HL Operation
Slide 22: White Dam: Early cashflow with further growth potential
White Dam: Early cashflow with further growth potential GBM farm-in and Option to Purchase (OTP) agreement to acquire up to 100% of the White Dam gold-copper heap leach operation White Dam 489 km2 Mary Mine GBM plans to leverage its in-house metallurgical expertise to build a SART plant with the
Slide 23: Significant infrastructure footprint
Significant infrastructure footprint White Dam Project The White Dam Gold Operation includes the open pit mines, dump / heap leach, the (Historical Qtrly Production) gold extraction plant and related infrastructure 4,500 Mining/Stacking 4,000 Ceased 3,500 3,000 Au - oz 2,500 2,000 1,500 1,000 500 -
Slide 24: Key farm-in and OTP terms
Key farm-in and OTP terms Two stage, 18-month farm-in and Option To Purchase (OTP) agreement for 100% of the White Dam Au-(Cu) heap leach operation and leases for A$1.16M plus assumption of environmental bond Currently owned by Round Oak Minerals Pty Ltd, a wholly owned subsidiary of the A$5.3B
Slide 25: Other Mineral Assets
Other Mineral Assets
Slide 26: Mt Morgan: District-scale opportunity in a world-class gold-copper region
Mt Morgan: District-scale opportunity in a world-class gold-copper region Stanwell 100% ownership of district-scale tenure package totalling 1017 km2 and surrounding the world-class Mt Morgan gold copper mine GBM Resources Mt Morgan mine operated between 1882 and 1981 producing 50 Mt Morgan 1017
Slide 27: Pan Pacific Copper JV: Targeting copper-gold in a world-class IOCG province
Pan Pacific Copper JV: Targeting copper- gold in a world-class IOCG province GBM Mt. Isa 958 km² of Exploration Claims 958 km2 in the Mt Isa Inlier targeting IOCG deposits like the world-class Ernest Henry Mine GBM owns 100% of 278 km2 plus 46.2% of 680 km2 included in JV with Pan Pacific Copper
Slide 28: Mayfield Project
Mayfield Project Adjacent to high-grade Cu/Au production centres: Trekelano – 3.1 Mt @ 2.1% Cu Tick Hill – 0.47 Mt @ 28 g/t Au Highly Prospective Tenement Area: • Single EPM 1, 172 km2 • Multiple Cu targets adjacent to magnetic highs. • Argylla & Corella formation volcanics • Adjacent to major P
Slide 29: Brightlands and Milo Project
Brightlands and Milo Project Milo Design Pit CuStrong soil geochemical anomalies Cu-REE-U soil geochemical MILO IOCG REE DEPOSIT • Copper Resource 1 ;88 Mt containing 97 kt Cu and 14 Mlbs U at a cut-off of 0.1% Cu Eq Backdrop: gridded Cu • Resource is open at depth and along strike soil • Limited dr
Slide 30: The new GBM: Building critical resource scale
The new GBM: Building critical resource scale 1 Reinvigorated Board and management 2 Consolidated, clean and tight capital structure with initial financing complete 3 Focused on accelerating exploration to deliver quality resource build and early cashflow 4 Mt Coolon Gold-Silver Project offers distr
Slide 31: Contact
Contact Peter Rohner Managing Director GBM Resources +61 8 9316 9100 Suite 8, 7 The Esplanade Mt Pleasant WA 6153 www.gbmr.com.au ASX: GBZ
Slide 32: Appendix
Appendix
Slide 33: Mineral Resource estimates
Mineral Resource estimates GBM confirms that it is not aware of any new data or information that materially affects the information disclosed in this presentation and previously released by GBM in relation to Mineral Resource estimates on its tenure. All material assumptions and technical parameters
Slide 34: Mineral Resource estimates cont.
Mineral Resource estimates cont. GBM confirms that it is not aware of any new data or information that materially affects the information disclosed in this presentation and previously released by GBM in relation to Mineral Resource estimates on its tenure. All material assumptions and technical para