Slide 1: AMEC Convention Perth June 2010
For personal use only AMEC Convention Perth June 2010 ASX : ENR 1
Slide 2: Corporate Information
Corporate Information For personal use only Board Paul Chapman - Chairman Will Robinson - Managing Director Peter Bewick - Exploration Director Jon Hronsky - Non-Executive Director Kevin Hart / Dan Travers - Company Sec. Issued Capital: 79.2m Ordinary Shares (Top 20 - 71%) 2.8m Employee Options Mark
Slide 3: Company Snapshot – Diversified Explorer
Company Snapshot – Diversified Explorer For personal use only Manganese Zinc Copper Uranium Yeneena - MN1 Yeneena - BM5 Yeneena - BM1 Yilgarn Calcrete 2m @ 20% Mn 0.1m @ 28% Zn 3m @ 5.1% Cu Resources 14km long target Offhole EM target 2km long anomaly 11 million lbs U3O8 Yeneena – MN2 Tchintaby Well
Slide 4: Yeneena Project – Paterson Province (WA)
Yeneena Project – Paterson Province (WA) For personal use only • Major land position in highly endowed mineral belt, now 100% owned (1300 km2) • Multiple commodity targets • Good infrastructure • High grade copper, zinc & manganese drill intersections • Aircore and diamond drill programs in progress
Slide 5: Major land position amongst giant mineral deposits
Major land position amongst giant mineral deposits For personal use only 5
Slide 6: BM1 Copper Discovery
BM1 Copper Discovery For personal use only • Located on the regionally significant McKay Fault which extends to the Nifty copper mine 60km north • June 2009 - Three broad spaced aircore drill traverses intersected highly anomalous copper • Oct 2009 - Diamond program identified a major hydrothermal a
Slide 7: BM1 Copper Discovery
BM1 Copper Discovery For personal use only • Aircore drilling discovered high grade, shallow copper mineralisation • 3m @ 5.12% copper from 67m • 7m @ 1.32% copper from 24m • Only partial assays from two holes, remaining assays expected towards the end of June • Mineralisation remains open to the no
Slide 8: MN1 – 14km Long Target
MN1 – 14km Long Target For personal use only • 70km from Woodie Woodie • Two near surface intersections, 200m apart in adjacent vertical aircore holes • Mineralisation intersected in the one line of drilling completed within the 14km long gravity anomaly Mn Intersections • Target area footprint is s
Slide 9: MN1 – Woodie Woodie Scale Opportunity
MN1 – Woodie Woodie Scale Opportunity Woodie Woodie (same scale) For personal use only MN1 - Residual gravity image Open Pits • Ground gravity survey has defined multiple manganese drill targets • Historical intersections are outside the most intense gravity features • Drill hole re-sampling has con
Slide 10: MN1 – 100% Sand Cover
MN1 – 100% Sand Cover For personal use only Mn oxide in YNAC168 10
Slide 11: MN2 – Large Scale Undercover Mn Anomaly
MN2 – Large Scale Undercover Mn Anomaly For personal use only • 1km wide Mn anomaly • Limited sampling has produced 6m @ 8.5%Mn • Mineralisation open north, south and east. • Drilling June 2010 11
Slide 12: BM5 Zinc Target
BM5 Zinc Target For personal use only • The first diamond drill hole intersected high grade zinc mineralisation • 28.5% zinc, 2.3% lead and 34g/t silver over 0.1 metres near the bottom of the hole • Detailed gravity survey completed in April 2010 • Significant residual Section (next slide) gravity a
Slide 13: BM5 Zinc Target
BM5 Zinc Target For personal use only • A significant offhole conductor approximately 60m below the bottom of hole • Coincident EM and gravity anomalies to the west of the massive sulphide vein • Target located adjacent to the intersection of major regional structures • Diamond drill program has com
Slide 14: Yeneena Project - The Immediate Focus
Yeneena Project - The Immediate Focus For personal use only • Multiple high grade intersections Mn • 4000m aircore drill program • +2km regolith anomaly Cu • 3m @ 5.12% Cu, 7m @ 1.32% Cu • Drill program expanded • Massive sulphide discovery - 28% Zn Zn • Diamond drilling of EM anomaly 14
Slide 15: The Next Months - Yeneena Project
The Next 6 Months - Yeneena Project For personal use only Apr May Jun Jul Aug Sep Oct 3m @ 5.12% Cu Aircore Drilling (Cu & Mn) BM1, BM2, MN1, MN2 Diamond Drilling (Zn) BM5 Assaying Aircore June, Diamond July Ground Geophysics IP, Gravity, EM Aircore Drilling (4000m) Follow up Diamond Drilling (2000m
Slide 16: Disclaimer & Compliance Statement
Disclaimer & Compliance Statement This presentation has been prepared by Encounter Resources Limited (“Encounter”). The information contained in this presentation For personal use only is a professional opinion only and is given in good faith. Certain information in this document has been derived fr