  1. Slide 1: Clean TeQ Sunrise CCC Meeting – 14 December 2018

    Clean TeQ Sunrise CCC Meeting – 14 December 2018

  2. Slide 2: Summary

    Summary Project Update Community Engagement Update Environmental Management Update Clean TeQ Sunrise CCC, 14 December 2018 Page 2

  3. Slide 3: Project Update

    Project Update Page 3

  4. Slide 4: Project Update

    Project Update • Voluntary Planning Agreement – A$18 million – Signed 13 December 2018 • Metallurgical Corporation of China Ltd (MCC) – Front End Engineering Design (FEED) commenced • Water pipeline – Survey works to commence in January 2019 • Site preparations works in Q1 – Site security (fencing)

  5. Slide 5: Our NSW team is growing

    Our NSW team is growing • Kathryn Logan – Community Relations Superintendent • Talan Breaden – Project H&S Superintendent • Tom Rivett – Senior Metallurgist • Andrew Jones – Project Environmental Superintendent Clean TeQ Sunrise CCC, 14 December 2018 Page 5

  6. Slide 6: Community Engagement Update

    Community Engagement Update Page 6

  7. Slide 7: Community Engagement – September onwards

    Community Engagement – September onwards • 1:1 Meetings – near neighbours, local government & community organisations • Community coffee carts – Fifield, Trundle, Condo, Parkes and Forbes – September and December ☕677 coffees • Shop fronts – continue to operate shop fronts in Condobolin and Trundle

  8. Slide 8: Community Engagement – cont.

    Community Engagement – cont. • Supporting local events and fundraising efforts – Supported six local schools or preschools across the region with fundraising efforts through the coffee cart events – Platinum sponsor of Band Together Farmers event – Clean TeQ CCC sound check Clean TeQ Sunrise CCC, 14

  9. Slide 9: Keeping People Informed

    Keeping People Informed • Newspaper advertisements – Full-page ads in local papers in Condobolin, Parkes and Forbes – ongoing campaign • Keeping our community updated – September & December eNews – October and December newsletter – Social media – Meetings / presentations – Shopfronts Clean TeQ Sunri

  10. Slide 10: Information pamphlet distributed at community meetings

    Information pamphlet distributed at community meetings Highlighting local benefits and including information on IPC Clean TeQ Sunrise CCC, 14 December 2018 10

  11. Slide 11: Environmental Management Update

    Environmental Management Update Page 11

  12. Slide 12: Environmental Management Plans

    Environmental Management Plans • EMPs prepared in accordance with the Development Consent: – Content requirements – Consultation requirements – Approval requirements • EMPs generally required to be approved before commencement • EMPs initially prepared for the “initial construction activities” • EMP

  13. Slide 13: Environmental Management Plans

    Environmental Management Plans • EMPs approved to date: – Heritage Management Plan – Biodiversity Management Plan & Revegetation Strategy – Noise Management Plan – Air Quality Management Plan • Approved EMPs are available on Clean TeQ website • Other EMPs currently being prepared • Environmental Man

  14. Slide 14: Environmental Monitoring

    Environmental Monitoring • Mine site monitoring: – meteorological monitoring commenced – surface water quality monitoring commenced – groundwater quality and level monitoring continuing – noise and air quality monitoring program being established • Borefield monitoring: – existing groundwater level

  15. Slide 15: Environmental Monitoring – Air Quality Monitoring

    Environmental Monitoring – Air Quality Monitoring • Construction phase air quality monitoring – particulate matter (PM2.5 and PM10) and dust deposition • Particulate matter monitoring – continuous • Meteorological monitoring – continuous • Monitoring sites consistent with Environment Protection Lice

  16. Slide 16: Environmental Monitoring – Noise Monitoring

    Environmental Monitoring – Noise Monitoring • Construction phase noise monitoring – attended monitoring conducted quarterly • Monitoring sites consistent with Environment Protection Licence and NMP Clean TeQ Sunrise CCC, 14 December 2018 Page 16

  17. Slide 17: Aboriginal Cultural Heritage – Salvage Works

    Aboriginal Cultural Heritage – Salvage Works • Accommodation camp site – salvage works undertaken in accordance with Aboriginal Heritage Impact Permit • Registered Aboriginal Parties participated in salvage works • Aboriginal cultural heritage objects stored in “Keeping Place” • Community team will

  18. Slide 18: Questions?

    Questions? Page 18

  19. Slide 19: Clean TeQ Holdings Limited contact details

    Clean TeQ Holdings Limited 12/21 Howleys Road Notting Hill VIC 3168 AUSTRALIA www.cleanteq.com Clean TeQ Sunrise CCC, 14 December 2018

Clean TeQ Holdings — Corporate Update (December 2018) on 6ix