  1. Slide 1: Kobada Gold Project 2024 Definitive Feasibility Study

    For personal use only Kobada Gold Project 2024 DEFINITIVE FEASIBILITY STUDY Kobada ascends to the big leagues KOBADA DFS PRESENTATION | OCTOBER 2024 | ASX:TRE www.toubaniresources.com 1

  2. Slide 2: Disclaimer

    Disclaimer This Presentation is dated 31 October 2024 and has been prepared for information purposes in connection with Toubani permitting matters (such as detailed on slides 17 and 22 of this Presentation), gold grades and recoveries at the project, Resources Limited's (“TRE” or the “Company”) defi

  3. Slide 3: Kobada Definitive Feasibility Study Delivers on Commitments

    Kobada Definitive Feasibility Study Delivers on Commitments RESOURCE UPGRADE COMPETITIVE AISC For personal use only • Large oxide Mineral Resource • AISC of US$1,004/oz driven by low strip ratios, • 90% of 2.2Moz MRE in Indicated classification soft ore and simple processing RESERVE GROWTH FRESH ROC

  4. Slide 4: Overview of Kobada Gold Project DFS Outcomes

    Overview of Kobada Gold Project DFS Outcomes Technically simple project translates to compelling economic outcomes Kobada Gold Project - DFS Outcomes Unit Base Case Project Life Years 9.2 Free-dig oxide material, no drill and For personal use only Mining Metrics Total Material Movement (TMM) Mt 216.

  5. Slide 5: Study Contributors – Leaders in Their Fields

    Study Contributors – Leaders in Their Fields Best in class technical partners deliver robust Definitive Feasibility Study Study Manager For personal use only Ore Processing Mineral Tailings Storage Facility Plant Design Resource & Site Water Mgmt. Mining Study / Non-Process Metallurgical Ore Reserve

  6. Slide 6: Large Indicated Resource of 2.0Moz

    Large Indicated Resource of 2.0Moz Shallow and well drilled oxide-dominant open pittable Mineral Resource • Kobada is a large, continuous deposit extending over 5km of strike For personal use only • Mineral Resource of 2.2Moz defined within a 4.5km long open pit with close spaced surface drilling •

  7. Slide 7: Significant Ore Reserve of 1.56Moz Underpins Long Mine Life

    Significant Ore Reserve of 1.56Moz Underpins Long Mine Life Open pit extends for 4.4km with a maximum pit depth of 180m • US$1,650/oz gold price and prevailing costs used in Ore Reserve estimation, For personal use only reflecting the robustness of the Kobada deposit • Ore Reserve of 1.56Moz represe

  8. Slide 8: Mining Phases Staged to Optimise Cash Flow and Reduce Risk

    Mining Phases Staged to Optimise Cash Flow and Reduce Risk Phasing of pits focused on increasing early access to ore at low strip ratios Kobada Open Pit Strip Ratio (W:O) vs Selected West African Development Peer Projects For personal use only 0 1 2 3 4 5 6 Koné 1.2 Kiaka 1.8 Kobada 3.0 Nyanzaga 3.7

  9. Slide 9: Kobada DFS Mining Schedule

    Kobada DFS Mining Schedule Non-selective, bulk mining strategy Total Material Movement Mt W:O For personal use only 35 15.0 30 • LOM strip ratio of 3.0:1 (waste:ore) 12.0 25 • Stage 1 strip ratio of 1.8:1 (waste:ore) 20 9.0 • Predominantly free-dig material (no drill & blast) 15 6.0 10 • Average ann

  10. Slide 10: Kobada is a Simple, Conventional Oxide Process Flow Sheet

    Kobada is a Simple, Conventional Oxide Process Flow Sheet Free-milling with high recoveries of 96% in oxide material KOBADA HAUL TO MINERAL GRAVITY INTENSIVE CYANIDE LEACH OPEN PIT PLANT SIZER BALL MILL CYCLONES CONCENTRATOR LEACH & ADSORPTION For personal use only ELUTION TAILINGS Soft, free-millin

  11. Slide 11: Oxide Gold Production For Longer

    Oxide Gold Production For Longer 162,000oz average annual production over an initial 9-year life of mine Mt Tonnes Processed Profile g/t For personal use only 1.06 1.05 1.20 1.01 1.00 0.92 • Processing rate of 6.0 Mtpa for oxide 0.86 0.86 1.00 6.0 0.76 0.79 only years 0.72 0.80 • Oxide / fresh blend

  12. Slide 12: Kobada Joins the +150,000ozpa Development Assets Tier

    Kobada Joins the +150,000ozpa Development Assets Tier Kobada DFS delivers a step change in project profile and increased regional significance Gold Production vs AISC, Kobada vs Selected Koz US$/oz West African Gold Development Peer Projects For personal use only 300 1,400 1,200 250 1,000 200 800 15

  13. Slide 13: Low Initial Development Capital Requirement

    Low Initial Development Capital Requirement Robust capital estimate comparable with recent successful West African mine builds of similar scale Initial Development Capital US$m For personal use only Construction Distributables 32.8 Treatment Plant Costs 60.4 Reagents & Plant Services 19.4 Non-Proces

  14. Slide 14: Industry Leading Capital Intensity

    Industry Leading Capital Intensity Relatively low funding hurdle with strong returns on invested capital Kobada Capital Development Profile vs Selected West African Gold Development Peer Projects For personal use only 800 712 700 600 500 474 447 456 446 435 400 365 373 300 216 Lowest capital cost 20

  15. Slide 15: Kobada is a Compelling Low-Cost Asset

    Kobada is a Compelling Low-Cost Asset Competitive costs are driven by Kobada’s unique soft rock characteristic US$/ tonne All - in - Sustaining Costs US$m LOM US$/oz BWi (kWh / t) processed For personal use only Mining 680 456 12.6 0 5 10 15 20 25 30 Processing 447 299 8.3 Kobada Oxide 3.7 Site G&A

  16. Slide 16: Kobada Ticks All of the Boxes

    Kobada Ticks All of the Boxes High NPV generation relative to capital invested Initial Development Avg Gold Low Average Annual Pre-tax & Post-tax Pre-tax & Post-tax Post-tax For personal use only Capex of Production AISC of Operating Cash Flow NPV8 of IRR of Payback of US$216m 162koz US$1,004/oz US$

  17. Slide 17: Robust Economics Across Various Scenarios

    Robust Economics Across Various Scenarios Sensitivity analysis highlights the resilience of the Kobada Gold Project Sensitivity Analysis - Post Tax NPV (US$m) • Kobada can withstand significant unfavourable movements in For personal use only - 200 400 600 800 1,000 1,200 macroeconomic and technical

  18. Slide 18: Next Steps – Enhance Kobada

    Next Steps – Enhance Kobada Opportunities to improve Kobada and reduce capex and opex Mining • Additional drill data from deeper drilling may increase fresh rock resources and result in For personal use only an expansion of later pit stages • Geotechnical studies to inform/refine pit wall design to

  19. Slide 19: Next Steps – Grow Kobada

    Next Steps – Grow Kobada Pursuing additional oxides to increase production and optimise oxide/fresh blend For personal use only Dual growth strategy includes walk-up oxide targets and depth extensions • Enables high margin oxide ounces to supplement base load throughput for potential increases in go

  20. Slide 20: Next Steps – Grow Kobada: Untapped potential below Mineral Resource

    Next Steps – Grow Kobada Untapped potential below the current Mineral Resource For personal use only Targeting significant free milling, fresh rock optionality at depth • Historic drilling results in fresh rock at Kobada include1: • 9m at 21.0g/t from 114m (KBRC12-066) • 3m at 33.9g/t from 135m (KBR

  21. Slide 21: Growth – Fresh Rock Opportunity Below Current MRE

    Growth – Fresh Rock Opportunity Below Current MRE Kobada deposit is open at depth For personal use only Drilling program set to commence in Q4 2024 targeting high priority depth extensions Note: Refer to the Company’s announcements dated 25 March, 11 April, 22 April, 22 May 2024. www.toubaniresource

  22. Slide 22: Next Steps – Derisk Kobada

    Next Steps – Derisk Kobada Readying the Project for development and significant future economic benefits for Mali Key workstreams progressing or well advanced For personal use only Mining Convention Kobada Gold Project will • Kobada’s current Mining Convention is governed by the 2012 Mining see sign

  23. Slide 23: Set to Rapidly Advance and Unlock Further Value

    Set to Rapidly Advance and Unlock Further Value Kobada is an attractive asset today, but can be even better tomorrow Funded through to achieving Shovel-Ready status in 2025 For personal use only 2024 H1 2025 2026 Positioned for Enhance Grow Derisk Path to Success Production Mid 2025 Development Read

  24. Slide 24: Additional information

    ASX: TRE For personal use only Additional information www.toubaniresources.com 24

  25. Slide 25: Corporate Overview

    Corporate Overview Capital Structure Shareholder Structure For personal use only Basic Shares Fully Share Price Institutional Management & Outstanding Diluted As of 30 October 2024 Investors Directors 227.9M 260.5M A$0.285 >50.0% 4.2% Substantial Holders Options/Perf Rights Market Capitalisation Cas

  26. Slide 26: Experience in Funding & Developing Mines

    Experience in Funding & Developing Mines Board of Directors Senior Management Phil Russo | Managing Director Kerry Griffin | Exploration & Resource Development For personal use only • 20 years experience in corporate, project development and capital markets • Geologist with over 27 years experience

  27. Slide 27: Kobada Resources & Reserves

    Kobada Resources & Reserves Mineral Resource Estimate Ore Reserve Estimate Material Indicated Inferred Total Material Proved Probable Total For personal use only Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces (Mt) (g/t) (Moz) (

  28. Slide 28: Competent Person Statement

    Competent Person Statement The information in this announcement that relates to Exploration Results from the Kobada Gold Project is extracted from the Company’s ASX announcements dated 17 May 2023, 26 April 2023, 11 April 2023, 8 March 2023, 19 July 2023, 25 March 2024, 11 April 2024, 22 April 2024,

  29. Slide 29: African Gold Development Peers

    African Gold Development Peers Kobada ascends to the big leagues Project Doropo Kiaka Bankan Koné Twin Hills Kurmuk Nyanzaga Dugbe Kobada Updated FS - Stage FS July'24 FS July'24 PFS - Apr’24 DFS - Jun'23 FS Dec'22 DFS Aug'22 FS Jun'22 DFS Oct’24 For personal use only Jan'24 Mine method OP/UG OP OP

  30. Slide 30: Reference Data

    Reference Data Company Project Document NI 43-101 Technical Report Published 3 September Centamin Doropo For personal use only (Effective 18 July 2024) – Doropo Gold Project Feasibility Study West African ASX Announcement 2 July 2024 - Kiaka Feasibility Study Kiaka Resources Updated Delivers 4.8Moz