New Talisman Gold Mines Limited · NZX:NTL

New Talisman Gold Mines — Investor Presentation (January 2013)

21 slides from New Talisman Gold Mines's investor presentation, January 2013

  1. Slide 1: New Talisman Gold Limited

    New Talisman Gold Limited Developing New Zealand’s next high-grade gold mine Investor Briefing Matthew Hill Executive Director January 2013 ASX:NTL NZX:NTL

  2. Slide 2: Contents

    Contents Section Slide Highlights………………………………… 3 Corporate Overview………………….… 4 Company Overview……………………. 5 Company Strategy……………………… 6 2013 Business Plan……………………. 7 World Class Province…………………… 8 Talisman Gold Project………………….. 9 Long Term Upside………………………. 11 Prefeasibility Study……………………... 12 Priori

  3. Slide 3: Highlights

    Highlights Successful completion of recent rights issue raising NZ$1.5M Experienced mining management team in place Roadworks/mine access complete mid January 2013 Prefeasibility commenced and on track for completion Q1 2013 High-grade gold zones identified for early mining Significant upside potent

  4. Slide 4: Corporate Overview

    Corporate Overview Capital Structure Major Shareholders Shares on issue: 479,406,064 Hamish Elliot Brown – 7.30% Current market capitalisation NZ$5.7M HFT Nominees – 6.40% Cash at bank (post raise) = $NZ1.3M Soco Limited – 5.86% Debt post raise = 0 HSBC Nominees – 3.16% International Pacific Securit

  5. Slide 5: Company Overview

    Company Overview ASX/NZX dual listed development mining company Flagship asset: 100% owned Talisman Mine Defined resources* contain 204,760oz Au and 798,840oz Ag High grades of resources* (Inferred, Indicated & Measured) 917,390 tonnes @ 6.94 g/t Au, 27.1g/t Ag Resource Category Tonnes Au Grade Au o

  6. Slide 6: Company Strategy

    Company Strategy Focus on core asset at Talisman Accelerate Talisman gold/silver mine development Target high-grade, readily accessible ore Minimise cash required for infrastructure development Apply early cash flows to ongoing resource definition and development Transfer non-core exploration assets

  7. Slide 7: 2013 Business Plan

    2013 Business Plan Pre-feasibility study completed Q1 2013 Initiate bulk sampling and fast track production • Define short term priority mineable targets • Complete permitting requirements for bulk sampling • Initiate channel sampling programme Define medium term targets for resource expansion

  8. Slide 8: World Class Province

    World Class Province Deposit Size and Historic Production Favona Mine Historic Talisman Mine

  9. Slide 9: Talisman Gold Project

    Talisman Gold Project Geological potential* 0.55 to >2Moz Au, 1.65 to >6Moz Ag High-grade targets accessible without requirement for major earthworks JORC resource Existing stockpiles of high grade broken ore from 1.14 to >397g/t Au averaging ~ 41g/t Au Existing adit access via old workings Very goo

  10. Slide 10: Talisman Gold Project

    Talisman Gold Project Staged development to de-risk the project and generate internal cashflow Apply effective mining technology for cost benefit Investigate toll treatment options for crushing and processing ore Metallurgical test work initiated for treatment route Assessment of small scale treatme

  11. Slide 11: Long Term upside

    Long Term upside Grade: bonanza grade gold shoots, a feature of Karangahake deposits. Potential to expand mining operations to Taukani Hill and Rahu Multiple discovery opportunities: >4km vein system with many untested veins/shoots parallel to Maria and Welcome/Crown Mystery vein has high grades (e.

  12. Slide 12: Prefeasibility Study

    Prefeasibility Study Focus Areas Upgrading mine access Detailed modelling of high-grade shoots for initial mine development Preliminary mine design Identify and assess technology for optimal mining methods Establish infrastructure requirements (power, water supply) Metallurgical test work and Au/Ag

  13. Slide 13: Resource blocks targeted for early development

    Resource blocks targeted for early development Resource Blocks Mined Areas Mystery Crown Dubbo Second Egress Woodstock Existing Development 8 Level Portal

  14. Slide 14: Woodstock Resource Block

    Woodstock Resource Block Woodstock Block Strike Length 335m Resource Block Immediate on-reef development potential approximately 160m from portal Possible access on 7a Level Initial target resource Mined Areas grade 4.7g/t Au 92,100t (13,800oz Au) Existing Development

  15. Slide 15: Dubbo Resource Block

    Dubbo Resource Block Dubbo Block Resource Vein intersected on 8 Existing Block Development Level Immediate on-reef development potential Possible access on 9 level Initial target resource grade is 38.3g/t Au 23,000t (26,800oz Au) Mined Areas

  16. Slide 16: Mystery resource block

    Mystery resource block Mystery Vein Resource Virgin target – previously Block Strike unmined 105m Existing Similar dimensions to Development Maria vein likely. Bottom access on reef Long term mining potential Initial target resource grade = 17.7g/t Au 7,400t (4,200oz Au)

  17. Slide 17: Crown-Welcome Block

    Crown-Welcome Block Resource Crown-Welcome Vein Blocks Combined Medium term target strike length of Accessible all blocks = 335m Bottom access on reef Long term mining potential Initial target resource grade = 8.8g/t Au 46,500t (13,200oz Au) Existing Development Mined Areas

  18. Slide 18: Broken Hill Prospecting

    Broken Hill Prospecting NTL is a major shareholder (21.7%) BPL (ASX:BPL) www.bhpl.biz owns large pyrite-cobalt (‘Co’) deposits beside the Sydney-Adelaide railway, 25km west of Broken Hill. BPL has completed a scoping study for a 7.5Mtpa o/c mine with an annual production of pyrite concentrate contai

  19. Slide 19: Comparable analysis

    Comparable analysis Australia and New Zealand Gold Sector Market Stock Company Capitalisation Net Cash EV Moz g/t AUD/oz Type Exchange A$ NZX Glass Earth 12.1 NOT REPORTED Explorer ASX Aphrodite Gold Ltd 8.9 --- 7.9 1 3.2 7.6 Explorer Southern Cross ASX 19.6 2.2 17.4 0.6 2.1 29.4 Explorer Goldfields

  20. Slide 20: Summary

    Summary Developing NZ’s next high-grade gold (& silver) mine Existing JORC resource and excellent upside Existing Mining Permit Very lean market capitalisation vs value Pre-feasibility plan and development programme underway Close to existing mining infrastructure and support Plenty of upside and ex

  21. Slide 21: Contact: Matthew Hill Executive Director

    Contact: Matthew Hill Executive Director matt@newtalisman.co.nz +64 27 555 7737 *Competent Person Statement The information in this presentation that relates to gold exploration results and resources is based on information compiled by or supervised by Mr Murray Stevens. Mr Stevens is an independent