New Talisman Gold Mines Limited · NZX:NTL
New Talisman Gold Mines — Investor Presentation (September 2013)
11 slides from New Talisman Gold Mines's investor presentation, September 2013
Slide 1: The Talisman Race
THE TALISMAN RACE Talisman — a = =. o) =)
Slide 2: Going For Gold !
New Talisman Gold Mines Limited Where we come from Where we are Where we’re going to 1903 2013 2017 Going For Gold !
Slide 3: History – 90 Years in 90 Seconds
History – 90 Years in 90 Seconds Claim Long Tons Yield of Average Au Average Ag Bullion Grade * Grade Oz g/tonne g/tonne Crown 386,411 351,736 15.6 12.2 Talisman 687,043 3,510,691 27.8 128.6 Woodstock 49,165 139,767 15.3 71.6
Slide 4: Modern Times
Modern Times 1980 1986 1991 Crown Mines Mystery Vein Talisman Mine Dubbo Zone
Slide 5: Where We Are
Where We Are We are here Going For Gold! Clean-up of hardstand Stope Layout Gold Concentrate
Slide 6: This is Not the End
The Race 1 Installation of 2 Services Procurement and Site Establishment Underground Repairs 3 4 Bulk Sampling This is Met Testing 6 Not the 7 5 Full Consents End Phase 1 Mine
Slide 7: We will be the next underground mine operational in NZ
Procurement and Site Establishment • Hardstand area adequate for requirements • Road Sufficient for 6 wheel truck • 3 Phase Power to site • Internal water Supply We will be the next underground Procurement and Site Establishment mine operational in NZ Other similar sized projects could take years an
Slide 8: Underground Repairs
Underground Repairs • Minor repairs to tunnel network to allow safe access to Multiple Ore Blocks
Slide 9: Bulk Sampling and Met Testing
Bulk Sampling and Met Testing • Develop drives on Mystery • Develop Access Drive on Mystery drive in Dubbo • Increase and upgrade Resources • Increase Reserve position • Create infrastructure for Drive on Maria Phase 1 mine
Slide 10: Grade is King
Grade is King (planned) Median Grade of Worlds Top 10 HG Ops months
Slide 11: Questions ????
Questions ???? Competent Person Statement The information in this announcement that relates to the Talisman Project Prefeasibility Study and the Ore Reserve estimates was prepared by Wayne J Chowles, a Mining Engineer and member of the AusIMM. Mr Chowles is a full time employee of New Talisman Gold