Contango Silver & Gold Inc. · AMEX:CTGO

Contango Silver & Gold — Contango ORE — Investor Presentation (March 2017)

17 slides from Contango Silver & Gold's investor presentation, Mar 17, 2017

  1. Slide 1: Tetlin Gold Project, Tok Mining District, Alaska

    TETLIN GOLD PROJECT TOK MINING DISTRICT, ALASKA Contango ORE, Inc. March 17, 2017 1

  2. Slide 2: Contango ORE, Inc. Disclaimer

    CONTANGO ORE, INC. DISCLAIMER This presentation may contain forward-looking statements including, but not limited to, comments regarding timing and content of upcoming work programs, geological interpretations, receipt of property titles, in-situ valuations, mining costs, potential mineral recovery

  3. Slide 3: Peak Gold, LLC

    PEAK GOLD, LLC  On January 8, 2015, Contango Ore and Royal Gold, Inc. formed a joint venture, Peak Gold, LLC through their wholly owned subsidiaries.  Contango contributed its State of Alaska mining claims and its Tetlin Lease to the Joint Venture.  Royal Gold would manage and operate continued e

  4. Slide 4: Location

    LOCATION  Located in Eastern Interior Alaska on Alcan Hwy, 200 paved road miles from Fairbanks, 15 miles south of Tok  All-season gravel road with power and communications in the Peak resource area, three large mines operating in the region Contango ORE, Inc. - Tetlin Project 4

  5. Slide 5: Tetlin Land

    45 miles TETLIN LAND  Land includes 675,000 acres of fee simple land leased from Tetlin Village and approximately 167,000 acres of State mining claims owned by Peak Gold JV. 54 miles  No previous exploration on Tetlin Village lands, an area measuring 45 miles E-W by 54 miles N-S.  Multiple gold-b

  6. Slide 6: Tetlin Regional Geology

    TETLIN REGIONAL GEOLOGY Modified after Newberry et. al, 1998 Contango ORE, Inc. - Tetlin Project 6

  7. Slide 7: Geology and Mineralization

    GEOLOGY AND MINERALIZATION  Host rocks are poly-metamorphosed Paleozoic calcareous schists in a largely psammitic schist basement disconformably overlain/intruded by local Tertiary volcanic/plutonic rocks  70 Ma mineralization occurs in chlorite-amphibole-rich distal skarn assemblages. No prograde

  8. Slide 8: Gold in Soil Over Magnetics

    TETLIN GOLD IN SOIL OVER MAGNETICS 4 miles 3.5 miles North Peak Zone West Peak Zone Contango ORE, Inc. - Tetlin Project 8

  9. Slide 9: Cautionary Note to U.S. Investors

    CAUTIONARY NOTE TO U.S. INVESTORS Note: The US Securities and Exchange Commission permits US listed mining companies to disclose in their SEC filings only information about "reserves," or that part of a mineral deposit which could be economically and legally extracted or produced. Contango ORE Inc.

  10. Slide 10: Grade x Thickness: Main Peak - North Peak Zones

    GRADE x THICKNESS: MAIN PEAK - NORTH PEAK ZONES North Peak West Peak East Peak 2013 Resource Main Peak Outline Contango ORE, Inc. - Tetlin Project 10

  11. Slide 11: Tetlin Project Resources

    TETLIN PROJECT RESOURCES (Resource from Contango ORE, December, 2013) Grade > Cut-off Cut-off Tonnes > Total Total (g/t) cut-off Au Ag Cu Au Eq Au Au-equiv Category (AuEq) (tonnes) (g/t) (g/t) (%) (g/t) Ounces Ounces Indicated 0.5 5,970,000 3.46 11.8 0.25 4.08 664,112 783,115 Inferred 0.5 3,850,000

  12. Slide 12: Significant Intervals >200 GxT

    SIGNIFICANT INTERVALS >200 GxT Zone Drill Hole From (meters) To (meters) Interval (meters) Au_gpt Au_gpt x Interval North Peak TET16235 14.50 53.38 38.88 51.62 2006.99 North Peak TET16271 24.08 41.20 17.12 51.89 888.36 Main Peak TET13062 88.90 153.70 64.80 13.10 848.88 Main Peak TET12018 85.34 143.8

  13. Slide 13: Tetlin Project Drill Summary

    TETLIN PROJECT DRILL SUMMARY  Drilling advance rates include drilling + moves + down-time  “Loaded” drilling costs include all drilling + all project labor, analytical, transportation, expendables, off-site support and G&A  Most 2013 drilling was oriented core and included fly drilling which was

  14. Slide 14: Tetlin Project Work Summary

    TETLIN PROJECT WORK SUMMARY Core Stream Airborne Mag+EM Rock Soil Pan Con Core Geophys Trenchin Expenditures Year sample Sed (km) (not including samples samples samples (feet) (km) g (feet) (US$) s samples IP) 2009 0 958 33 94 11 0 0 2,330 639,429 0 2010 0 613 760 668 795 0 14 0 877,762 0 2011 1,267

  15. Slide 15: Contango ORE Corporate Metrics

    CONTANGO ORE CORPORATE METRICS CTGO: OTCQB As of March 17, 2017: Outstanding shares of common stock (which includes 198,998 shares of unvested restricted stock ): 4,903,766 Outstanding options: 307,000 Outstanding warrants: 580,999 Fully Diluted shares of common stock: 5,719,765 Float: 41% Stock pri

  16. Slide 16: Tetlin Project Summary

    TETLIN PROJECT SUMMARY  Road accessible on stable, State of Alaska and fee simple lands.  Current indicated resource averages +3 grams gold per tonne, is located at or near surface and is open to expansion.  Multiple unexplored gold occurrences identified outside of the 100-acre Main Peak – North

  17. Slide 17: Thank You

    THANK YOU CTGO: OTCQB 17

Contango ORE — Investor Presentation (March 2017) on 6ix