  1. Slide 1: Investor Presentation

    ASX:RXL INVESTOR PRESENTATION August 2019 1

  2. Slide 2: Disclaimers

    Disclaimers Forward-Looking Statements Competent Person Statements This presentation has been prepared by Rox Resources Limited. This document contains background information about Exploration Results Rox Resources Limited current at the date of this presentation. The presentation is in summary form

  3. Slide 3: Disclaimers

    Disclaimers Cautionary Statement – Scoping Study Parameters The updated Scoping Study released to the ASX on the 10th of October 2018 is based on low-level technical and economic assessments, and is insufficient to support estimation of Ore Reserves or to provide assurance of an economic development

  4. Slide 4: Investment Highlights

    Investment Highlights The Company is focused on gold and nickel assets in Western Australia including the Youanmi Gold Mine 50% owned, Mt Fisher Gold Project 100% owned, Fisher East and Collurabbie Nickel Projects The Company’s flagship project, the Youanmi Gold Mine was recently acquired and has pr

  5. Slide 5: Corporate Information

    Corporate Information About Rox Resources Rox Resources Limited (ASX:RXL) owns advanced gold and nickel exploration projects in Western Australia, including the Mt Fisher Gold Project, the Fisher East and Collurabbie Nickel Projects. The Company has also recently acquired the Youanmi Gold Project wi

  6. Slide 6: The Youanmi Gold Project

    The Youanmi Gold Project - Gold - 6

  7. Slide 7: The Youanmi Gold Project

    The Youanmi Gold Project Ownership 50% 70% Rox recently acquire an initial 50% interest in the Youanmi Gold Mine Acquisition Cost $3.0m ($2.8m cash, Additional $3m Joint Venture (OYG Joint Venture) with the ability to increase to 70% (any $0.2m scrip) Exploration Spend $2m n/a time in the next 2 yea

  8. Slide 8: Infrastructure

    Infrastructure The Youanmi Project includes a developed underground mine (dewatering required) and surface infrastructure including: CIP process plant designed to treat 600,000tpa of oxide ore (requiring significant refurbishment) Tailings disposal facility Mine offices Core shed and workshop Access

  9. Slide 9: Youanmi Regional Setting

    Youanmi Regional Setting Younami Shear Zone is a major state scale feature Intersection of the YSZ, greenstones and cross cutting structures are highly prospective areas. Together the JVs extend the length of tenure to 40km of strike along the Youanmi Shear Zone Strong exploration upside and discove

  10. Slide 10: Near Mine Potential

    Near Mine Potential Oxide and free milling gold mineralisation in granite and parallel belts to Youanmi Mineralisation is partially refractory in the immediate vicinity of main lode (at depth) and gold endowment is impressive Controls on metallurgy/recovery is well understood. Youanmi Deep ore body

  11. Slide 11: Northern Pits - Amalgamation?

    Northern Pits - Amalgamation? Long Section (looking east) of northern pits at Youanmi with 2g/t Au Leapfrog shell and drill targets 11

  12. Slide 12: Commonwealth HG Target

    Commonwealth HG Target The undeveloped Commonwealth-Connemara deposits and mineralised trend is centred 4km northwest of the Youanmi Plant. Gold mineralisation is from surface and hosted within a 3m to 10m wide zone of sheared quartz-veining and highly altered mafic volcanic rocks. Some of the inter

  13. Slide 13: Regional Targets

    Regional Targets Highly prospective granite-greenstone contact along the Youanmi Shear Zone - > 40km strike length Historically only very limited wide-spaced RAB/AC within regional Rox JV tenements Youanmi Resource 1.2Moz Drill-ready regional exploration prospects Detailed magnetics works well for s

  14. Slide 14: Key Points - YGP

    Key Points - YGP Strategic Rationale Milestones Acquisition of the Youanmi Gold Project is consistent with the Company’s stated Analysis of database : Ongoing objective of acquiring near-production assets within its financial capacity. Drilling regional targets : June onward Opportunity for Rox to e

  15. Slide 15: Mt Fisher Project

    Mt Fisher Project - Gold - - Nickel - 15

  16. Slide 16: Mt Fisher Gold Project

    Mt Fisher Gold Project JORC Mineral Resource of 89,000 Mt Fisher Project Scale Geology Mt Fisher Project – max Au downhole oz* @ 2.7 g/t Au Majority of the known gold mineralisation (excluding extensions to historical Moray Reef and Mt Fisher) is found within regolith. Basement source of gold not ye

  17. Slide 17: Gold Mineralisation

    Gold Mineralisation Conceptual Model - Mt Fisher gold mineralisation Mt Fisher gold mineralisation is typical of greenstone- hosted Archean lode gold Lithology, structure and weathering are primary controls on gold mineralisation Project Summary • High-grade resource defined (7.53g/t Au) • Small 20m

  18. Slide 18: Basement Source

    Basement Source Depth to Basement and Gold Occurrences > 2g/t Au Analogous to the Garden Well deposit Implications for Targeting Au Mineralisation Aircore drilling ineffective due to depletion above primary mineralization Drilling beneath regolith mineralisation ineffective (Au migration) Potential

  19. Slide 19: Magnetics indicate major structures line up with basement lows

    Depth to Basement and Gold Occurrences > 2g/t Au Structure, Max Au over Magnetics Magnetics indicate major structures line up with basement lows Gold mineralisation in the Dam trend is potentially remobilized to the west of the main structural corridor Dirks and Damsel structural targets stand out a

  20. Slide 20: Rox's Nickel Projects

    Rox’s Nickel Projects Two exceptional high grade nickel sulphide resources in WA’s northern goldfields 70km apart 150km from established infrastructure 20

  21. Slide 21: Fisher East Resources

    Fisher East Resources Total Mineral Resource* of 4.2 Mt @ 1.9% Ni, for 78,000 tonnes Ni metal Potential to increase current resources and to identify new resources * See Appendix for Mineral Resource details 21

  22. Slide 22: Fisher East Nickel Conceptual Plan

    Fisher East Nickel Conceptual Plan Concentrator Toll Mill Updated Scoping Study 1 based on new Conceptual Mining Inventory 2.9Mt @ 1.7% Ni 2.9Mt @ 1.7% Ni Mining Study by CSA – stope optimisations, detailed mine schedule – optimum mining rate was 500 ktpa Mine Life 6 years 6 years Annual Production

  23. Slide 23: Conclusion

    Conclusion Rox is actively exploring its exciting portfolio of mineral properties all in highly prospective Milestones WA greenstone belts Drilling regional targets at Youanmi / June Currans JV Rox has commanding positions in these belts Drilling Mt Fisher Basement Targets June Youanmi Gold Project

  24. Slide 24: Thank You

    ASX:RXL Thank You Rox Resources Limited Level 1, 34 Colin Street, West Perth, WA, 6005 AUSTRALIA T: (08) 9226 0044 F: (08) 9322 6254 E: admin@roxresources.com.au W: www.roxresources.com.au 24

  25. Slide 25: Appendix – Mineral Resource Estimate

    Appendix – Mineral Resource Estimate The information in this report that relates to gold Mineral Resources for the Youanmi Gold project was reported to the ASX on 17 April 2019 (JORC 2012). Rox confirms that it is not aware of any new information or data that materially affects the information inclu

  26. Slide 26: Appendix – Mineral Resources

    Appendix – Mineral Resources Fisher East Nickel, ASX:RXL 5 February 2016 Olympia Nickel-Copper-PGE, ASX:RXL 18 August 2017 Tonnes Pd+Pt Deposit Category Tonnes (Mt) Ni% Ni (kt) Ni % Cu % Co ppm Pd ppm Pt ppm NiEq %* NiEq (kt) (kt) (koz) 573 1.6 1.2 820 1.5 0.85 2.2 13.5 43.0 Indicated 1.7 2.0 34.0 O

  27. Slide 27: Appendix – Mineral Resources

    Appendix – Mineral Resources Mt Fisher Gold, ASX:RXL 11 July 2018 0.8 g/tAu block cut-off grade. Values may not sum due to rounding. 27