Mapletree Industrial Trust · SGX:ME8U

Mapletree Industrial Trust — Investor Presentation (May 2025)

46 slides from Mapletree Industrial Trust's investor presentation, May 23, 2025

  1. Slide 1: Investor Presentation May 2025

    Slide 1: Investor Presentation May 2025

    Investor Presentation May 2025

  2. Slide 2: Important Notice

    Slide 2: Important Notice

    Important Notice This presentation shall be read in conjunction with Mapletree Industrial Trust’s (“MIT”) financial results for Fourth Quarter Financial Year 2024/2025 in the SGXNET announcement dated 30 April 2025. This presentation is for information only and does not constitute an offer or solici

  3. Slide 3: Contents

    Slide 3: Contents

    Contents 01 Overview of Mapletree Industrial Trust 02 Key Highlights 03 Portfolio Update 04 4Q & FY24/25 Financial Highlights 05 Outlook and Strategy 3

  4. Slide 4: Overview of Mapletree Industrial Trust

    Slide 4: Overview of Mapletree Industrial Trust

    OVERVIEW OF MAPLETREE INDUSTRIAL TRUST Hi-Tech Buildings, Mapletree Hi-Tech Park @ Kallang Way

  5. Slide 5: Overview of Mapletree Industrial Trust

    Slide 5: Overview of Mapletree Industrial Trust

    Overview of Mapletree Industrial Trust 141 NLA (sq ft) AUM Properties 25.2 million1 S$9.1 billion2 Investment Mandate Focused on (i) industrial real estate assets in Singapore, excluding properties primarily used for logistics purposes and (ii) data centres worldwide beyond Singapore Trust Structure

  6. Slide 6: 141 Properties Across 6 Property Segments

    Slide 6: 141 Properties Across 6 Property Segments

    141 Properties Across 6 Property Segments S$9.1 billion1 25.2 million2 >2,000 tenants AUM NLA (sq ft) Tenant Base Light Industrial Buildings Data Centres: 55.6% 0.7% North America: 45.6% Stack-up/Ramp-up Buildings Japan: 6.8% 5.8% Singapore: 3.2% Flatted Factories 15.4% Data Centres Flatted Facto

  7. Slide 7: Diverse Portfolio of 141 Properties

    Slide 7: Diverse Portfolio of 141 Properties

    Diverse Portfolio of 141 Properties DATA CENTRES FLATTED FACTORIES Facilities used primarily for the storage and High-rise multi-tenanted industrial buildings processing of data. These include core-and- with basic common facilities used for light shell to fully-fitted facilities, which include manuf

  8. Slide 8: 56 Data Centres Across North America

    Slide 8: 56 Data Centres Across North America

    56 Data Centres Across North America Total WALE Weighted Average Unexpired Occupancy NLA1 (By GRI)2 Lease Term of Underlying Land3 Rate4 8.3m sq ft 6.3 years Freehold 88.2% Minnesota Ontario 2 1 Wisconsin 1 1 Michigan Massachusetts 2 2 Pennsylvania 2 2 Connecticut 1 Illinois 1 2 New Jersey Ohio 2 In

  9. Slide 9: 83 Properties in Singapore

    Slide 9: 83 Properties in Singapore

    83 Properties in Singapore Total WALE Weighted Average Unexpired Occupancy NLA (By GRI)1 Lease Term of Underlying Land1 Rate2 16.4m sq ft 2.7 years 31.8 years 92.9% Data Centres Hi-Tech Buildings Flatted Factories Business Park Buildings Stack-up/Ramp-up Buildings Light Industrial Buildings 1 As at

  10. Slide 10: Healthy Returns since IPO

    Slide 10: Healthy Returns since IPO

    Healthy Returns since IPO COMPARATIVE TRADING PERFORMANCE SINCE IPO¹ 400 MIT UNIT PRICE 350 105.4% 300 250 200 FTSE STRAITS TIMES INDEX 150 22.0% 100 FTSE ST REITS INDEX 50 -8.8% 0 Oct 2010 Oct 2011 Oct 2012 Oct 2013 Oct 2014 Oct 2015 Oct 2016 Oct 2017 Oct 2018 Oct 2019 Oct 2020 Oct 2021 Oct 2022 Oc

  11. Slide 11: Reputable Sponsor with Aligned Interest

    Slide 11: Reputable Sponsor with Aligned Interest

    Reputable Sponsor with Aligned Interest About the Sponsor, Mapletree Investments  Global real estate development, investment, capital and property management company committed to sustainability  The Sponsor owns and manages S$77.5 billion1 of assets across Asia Pacific, Europe, the United Kingdom

  12. Slide 12: Key Highlights

    Slide 12: Key Highlights

    KEY HIGHLIGHTS Data Centres, 44490 Chilum Place, Ashburn

  13. Slide 13: Sustainable and Growing Returns

    Slide 13: Sustainable and Growing Returns

    Sustainable and Growing Returns Amount Available for DPU Distribution to Unitholders (cents) (S$ million) 120 3.39 3.43 3.41 3.50 3.36 3.36 3.37 3.36 110 3.32 97.9 97.5 3.00 100 95.6 96.4 96.3 94.3 95.3 89.9 90 2.50 80 70 2.00 60 50 1.50 40 1.00 30 20 0.50 10 0 3Q¹ 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3

  14. Slide 14: Evolving MIT Portfolio Profile

    Slide 14: Evolving MIT Portfolio Profile

    Evolving MIT Portfolio Profile Reshaping and Building a Portfolio of Assets for Higher Value Uses Through Development Projects and Acquisitions 70 Properties 141 Properties AUM by geography AUM by geography Singapore 100.0% Singapore 47.6% North America 45.6% Japan 6.8% 1 Includes MIT’s book value o

  15. Slide 15: Portfolio Growth since IPO

    Slide 15: Portfolio Growth since IPO

    Portfolio Growth since IPO FY24/25 3 Asset Enhancement FY21/22 FY22/23 FY23/24 S$8.9b S$9.0b S$8.8b S$8.8b Initiatives (“AEI”) 5 Build-to-Suit (“BTS”) Projects FY20/21 11 Acquisitions S$6.8b FY19/20 S$5.9b Acquisition Acquisition FY18/19 29 US DCs Osaka Data S$4.8b US$1.32b Centre4 FY17/18 JPY52b FY

  16. Slide 16: FY24/25 Results Highlights

    Slide 16: FY24/25 Results Highlights

    FY24/25 Results Highlights  Higher Net Property Income driven by contributions from the Osaka Data Centre, Tokyo Acquisition and new leases and renewals across various Singapore property clusters • FY24/25 Net Property Income: S$531.5 million ( 2.0% y-o-y) • FY24/25 Distribution to Unitholders: S$3

  17. Slide 17: Portfolio Rejuvenation Through Strategic Divestments

    Slide 17: Portfolio Rejuvenation Through Strategic Divestments

    Portfolio Rejuvenation Through Strategic Divestments Divested Georgia Data Centre at 18.6% premium over market valuation Unlocks value for the Portfolio Divestment in Singapore at 22.1% over the original investment cost Georgia Data Centre Portfolio Divestment – (United States) Two Business Park Bui

  18. Slide 18: Completed Final Phase of Fit Out Works for Osaka Data Centre

    Slide 18: Completed Final Phase of Fit Out Works for Osaka Data Centre

    Completed Final Phase of Fit Out Works for Osaka Data Centre Completed Phase 4 of fitting-out works for Osaka Data Centre on 2 May Description 2025 for JPY5.2 billion1 Purchase Consideration1 High-quality, multi-storey Japan fully-fitted Data Centre in Among the top data centre hubs in JPY52.0 billi

  19. Slide 19: Acquisition of a Freehold Property in Tokyo, Japan

    Slide 19: Acquisition of a Freehold Property in Tokyo, Japan

    Acquisition of a Freehold Property in Tokyo, Japan • Acquisition of a multi-storey mixed-use facility in Tokyo, Japan Proposed Acquisition • Comprises data centre, back office, training facilities and an adjacent accommodation wing Purchase Consideration / 100% Basis: JPY14.5 billion (approximately

  20. Slide 20: Portfolio Update

    Slide 20: Portfolio Update

    PORTFOLIO Data Centres, UPDATE 13831 Katy Freeway, Houston

  21. Slide 21: Portfolio Overview

    Slide 21: Portfolio Overview

    Portfolio Overview Singapore North American Japan Overall Portfolio Portfolio Portfolio Portfolio Number of properties 83 56 2 141 NLA (million sq ft) 16.4 8.31 0.5 25.21 Occupancy (%) 4QFY24/25 92.9 88.2 100.0 91.62 3QFY24/25 92.7 90.3 100.0 92.12 Average rental rate (psf/mth) S$2.29 US$2.43 - - SE

  22. Slide 22: Lease Expiry Profile

    Slide 22: Lease Expiry Profile

    Lease Expiry Profile EXPIRING LEASES BY GROSS RENTAL INCOME1 As at 31 March 2025 WALE based on date of commencement of leases (years)2 North American Portfolio 6.3 Singapore Portfolio 2.7 Japan Portfolio 14.5 Overall Portfolio1 4.4 31.7% 19.5% 20.2% 14.3%3 8.7% 5.6% FY25/26 FY26/27 FY27/28 FY28/29 F

  23. Slide 23: Proactive Asset Management

    Slide 23: Proactive Asset Management

    Proactive Asset Management Three-pronged approach to managing the impact of vacancies in North American data centres  Properties are located predominantly in primary data centre markets in North America  Leased to diverse tenant types with a WALE of 6.3 years  To manage impending lease expiration

  24. Slide 24: Large and Diversified Tenant Base

    Slide 24: Large and Diversified Tenant Base

    Large and Diversified Tenant Base TOP 10 TENANTS BY GROSS RENTAL INCOME1 As at 31 March 2025 6.0%  Over 2,000 tenants  Largest tenant contributes 6.0% of Portfolio’s Gross Rental Income 5.0%  Top 10 tenants forms about 29.5% of Portfolio’s Gross Rental Income 3.7% 2.9% 2.4% 2.4% 2.3% 1.8% 1.6% 1.

  25. Slide 25: Tenant Diversification Across Trade Sectors

    Slide 25: Tenant Diversification Across Trade Sectors

    Tenant Diversification Across Trade Sectors1 No single trade sector accounted >17% of Portfolio’s Gross Rental Income By Gross Rental Income As at 31 Mar 2025 1 Includes MIT’s 50% interest in the joint venture with MIPL in three fully fitted hyperscale data centres and 10 powered shell data centres

  26. Slide 26: Diversified Mix of Data Centres

    Slide 26: Diversified Mix of Data Centres

    Diversified Mix of Data Centres  About 73.9% of MIT’s Data Centre Portfolio are on triple net lease structures whereby the majority of outgoings1 are borne by the tenants  Good mix of powered shell, fitted and fitted hyperscale data centres SPLIT BETWEEN TENANT TYPES FOR SPLIT BETWEEN LEASE TYPES

  27. Slide 27: Singapore Portfolio Performance

    Slide 27: Singapore Portfolio Performance

    Singapore Portfolio Performance Occupancy Gross Rental Rate S$ psf/mth 100% $2.50 93.7% 93.4% 93.8% 93.6% 93.6% 93.7% 92.7% 92.9% 90% $2.29 $2.28 $2.26 $2.26 80% $2.21 $2.22 $2.18 $2.19 70% $2.00 60% 50% 40% $1.50 30% 20% 10% 0% $1.00 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q

  28. Slide 28: Rental Reversions (Singapore)

    Slide 28: Rental Reversions (Singapore)

    Rental Reversions (Singapore) GROSS RENTAL RATE (S$ PSF/MTH)1 For Period 4QFY24/25 Before Renewal After Renewal $3.90 New Leases $3.60 $3.70 Passing Rent $3.36 $3.37 $3.74 $2.79 $2.83 $1.86 $1.97 $1.67 $1.66 $1.55 $1.59 $1.89 $1.41 $1.42 Hi-Tech Buildings Business Park Buildings Flatted Factories St

  29. Slide 29: Healthy Tenant Retention (Singapore)

    Slide 29: Healthy Tenant Retention (Singapore)

    Healthy Tenant Retention (Singapore) LONG STAYING TENANTS RETENTION RATE FOR 4QFY24/25 Up to 1 yr 8.1% >1 to 2 yrs >10 yrs 7.0% 86.6% 86.3% 87.8% 36.4% 82.6% 4 yrs or > 2 to 3 yrs less 8.9% More than 32.8% 41.6% 4 yrs 67.2% >3 to 4 yrs 8.8% N.A. N.A. >4 to 5 yrs Data Hi-Tech Business Flatted Stack-u

  30. Slide 30: Commitment to a Sustainable Environment

    Slide 30: Commitment to a Sustainable Environment

    Commitment to a Sustainable Environment Long-term Targets by FY29/30 15% 17% 10,000 kWp Average Building Average Building Scope 2 GHG Total Solar Energy Electricity Intensity1 Emissions Intensity1 Generating Capacity FY24/25 Key Achievements 4,106 kWp WELL Health-Safety Rating Total solar generating

  31. Slide 31: 4Q & FY24/25 Financial Highlights

    Slide 31: 4Q & FY24/25 Financial Highlights

    4Q & FY24/25 FINANCIAL HIGHLIGHTS Hi-Tech Buildings, build-to-suit project for HP

  32. Slide 32: Comparison of 4QFY24/25 and 4QFY23/24

    Slide 32: Comparison of 4QFY24/25 and 4QFY23/24

    Comparison of 4QFY24/25 and 4QFY23/24 4QFY24/25 4QFY23/24  Net property income decreased due to Year-on-Year  / () (S$’000) (S$’000) • non-renewal of leases in the North American Portfolio and loss of income Gross revenue 177,798 178,700 (0.5%) from divestment of Tanglin Halt Cluster in Mar 2024;

  33. Slide 33: Comparison of FY24/25 and FY23/24

    Slide 33: Comparison of FY24/25 and FY23/24

    Comparison of FY24/25 and FY23/24 FY24/25 FY23/24  Net property income increased due to Year-on-Year  / () (S$’000) (S$’000) • higher contributions from Osaka Data Centre and the newly acquired mixed-use Gross revenue 711,833 697,332 2.1% facility in Tokyo; and • new leases and renewals across va

  34. Slide 34: Comparison of 4QFY24/25 and 3QFY24/25

    Slide 34: Comparison of 4QFY24/25 and 3QFY24/25

    Comparison of 4QFY24/25 and 3QFY24/25 4QFY24/25 3QFY24/25  Net property income decreased due to Quarter-on-Quarter  / () (S$’000) (S$’000) • non-renewal of leases, lower rental rates and higher property maintenance cost Gross revenue 177,798 177,311 0.3% from North American Portfolio; • partially

  35. Slide 35: Statement of Financial Position

    Slide 35: Statement of Financial Position

    Statement of Financial Position 31 Mar 2025 31 Dec 2024  / () 31 Mar 2024  / () Total assets (S$ million) 8,800.2 8,874.1 (0.8%) 8,664.4 1.6% Total liabilities (S$ million) 3,607.7 3,613.1 (0.1%) 3,375.6 6.9% Net assets attributable to 4,887.7 4,957.2 (1.4%) 4,984.6 (1.8%) Unitholders (S$ millio

  36. Slide 36: Portfolio Valuation

    Slide 36: Portfolio Valuation

    Portfolio Valuation Valuation as at 31 Mar Capitalisation rates as at 31 Mar Property segment 2025 2024 Variance 2025 2024 Local currency (million) Data Centres (Singapore) S$280.5 S$278.7 3.90% to 6.25%5 4.00% to 6.25%5 Hi-Tech Buildings S$1,515.3 S$1,514.1 5.25% to 7.00% 5.25% to 7.00% Business Pa

  37. Slide 37: Strong Balance Sheet

    Slide 37: Strong Balance Sheet

    Strong Balance Sheet 31 Mar 2025 31 Dec 2024 DEBT CURRENCY PROFILE As at 31 March 2025 Total debt S$3,171.9 million S$3,173.0 million 17.9% Weighted average 3.2 years 3.1 years tenor of debt Aggregate leverage 40.1%2 39.8% ratio1 20.7% Strong balance sheet to pursue growth opportunities 61.4%  ‘BBB

  38. Slide 38: Well Diversified Debt Maturity Profile

    Slide 38: Well Diversified Debt Maturity Profile

    Well Diversified Debt Maturity Profile DEBT MATURITY PROFILE1 As at 31 March 2025 21% 21% 50.1 189.3 17% 17% 110.2 13% 100.1 747.8 598.3 534.2 389.8 382.7 4% 3% 2% 2% 125.0 100.1 135.3 60.0 50.0 58.6 90.2 ∕∕ ∕∕ ∕∕ FY25/26 FY26/27 FY27/28 FY28/29 FY29/30 FY30/31 FY32/33 FY35/36 FY38/39 MTN Bank Loan

  39. Slide 39: Risk Management

    Slide 39: Risk Management

    Risk Management 31 Mar 2025 31 Dec 2024 Fixed as a % of total debt 78.1% 78.3% Weighted average hedge tenor 3.4 years 3.2 years Average borrowing cost for the 3.0% 3.1% quarter Interest coverage ratio (“ICR”) 4.3 times 4.3 times for the trailing 12 months1 Impact on amount available Change in Impact

  40. Slide 40: Outlook and Strategy

    Slide 40: Outlook and Strategy

    OUTLOOK AND Data Centres, 2601 West Broadway Road, Tempe STRATEGY

  41. Slide 41: Singapore Industrial Property Market

    Slide 41: Singapore Industrial Property Market

    Singapore Industrial Property Market DEMAND AND SUPPLY FOR MULTI-USER FACTORIES DEMAND AND SUPPLY FOR BUSINESS PARKS  Total stock for factory and business park space: 41.6 million sq m  Potential net new supply of 0.5 million sq m in 20251, of which • Multi-user factory space accounts for 0.2 mill

  42. Slide 42: North American Data Centre Market

    Slide 42: North American Data Centre Market

    North American Data Centre Market1 NORTH AMERICAN COLOCATION DATA CENTRE LIVE SUPPLY, TAKE-UP AND CONTRACTED CAPACITY World’s largest data centre region with robust growth  Comprised about 49.5% of the global live IT capacity, with the United States taking up the largest share at 46.4%  Steady gro

  43. Slide 43: Outlook

    Slide 43: Outlook

    Outlook Challenging operating environment in view of global uncertainties  The swift escalation of trade tensions and extremely high levels of policy uncertainty are expected to have a significant impact on global economic activity.  Global growth is projected to fall to 2.8% in 2025 and 3.0% in 2

  44. Slide 44: Outlook

    Slide 44: Outlook

    Outlook North America • According to CBRE3, data centre capacity in primary markets in North America grew by 34% y-o-y to reach 6,923 megawatts (“MW”), while the overall vacancy rate fell to a record-low of 1.9% at end 2024. Volume-based pricing discounts, which are historically given to large space

  45. Slide 45: Diversified and Resilient

    Slide 45: Diversified and Resilient

    Diversified and Resilient  Anchored by large and diversified tenant base with low dependence Stable and on any single tenant or trade sector Resilient Portfolio  Focus on tenant retention to maintain a stable portfolio occupancy  Hedged borrowings of 78.1% with weighted average hedge tenor of Enh

  46. Slide 46: End of Presentation

    Slide 46: End of Presentation

    End of Presentation For enquiries, please contact Ms Cheng Mui Lian, Senior Manager, Investor Relations and Sustainability, DID: (65) 6377 4536, Email: cheng.muilian@mapletree.com.sg