Iron Road Ltd · ASX:IRD

Iron Road — Shareholder Meeting (November 2015)

16 slides from Iron Road's shareholder meeting presentation, Nov 27, 2015

  1. Slide 1: Annual General Meeting - Managing Director's presentation

    Annual General Meeting Managing Director's presentation 27 November 2015 Annual General Meeting

  2. Slide 2: Cautionary Statements

    Cautionary Statements Forward Looking Statements This announcement contains certain statements with respect to future matters which may constitute "forward-looking statements". Such statements are only predictions and are subject to inherent risks and uncertainties which could cause actual values, r

  3. Slide 3: Cautionary Statements (continued)

    Cautionary Statements Competent Persons’ Statements - continued The information in this report that relates to Resources estimated in 2013 for the Murphy South/Rob Roy (Fresh) prospect is based on and fairly represents information and supporting documentation compiled by Ms Heather Pearce, who is a

  4. Slide 4: Central Eyre Iron Project

    Central Eyre Iron Project Credible foundation built • Orebody scale (Resource Reserve) • Positive bulk test work programme • Optimisation study • MLP and EIS Building relationships in difficult times • Steel mills (5 MoUs) • Large construction / engineering groups • International pension funds (AIXI

  5. Slide 5: Mine Plan Optimisation

    Mine Plan Optimisation

  6. Slide 6: Process Design Integrated Waste Landform

    Process Design Integrated Waste Landform – finalised – design awarded, eliminates tailings dam Port Infrastructure Corridor – multi-user access – rail, water, power

  7. Slide 7: Central Eyre Iron Project infrastructure map

    Wudinna —________ Proposed long term employee village Lae Proposed | Mining Lease Proposed ) borefield | Exploration Licences Se Mining Lease Boundary —— ~~ Main Road “oss. Railway ‘eee Infrastructure Corridor Spe Borefield ——~ Power Transmission Line Proposed Cape Hardy Port fs... Proposed ) infras

  8. Slide 8: Viable For The Long Term

    Viable For The Long Term 60.0 CEIP 66.5% Fe Concentrate - Breakeven Price Assessment (pre-interest) @ 31 Mar 2015 43 50.0 2.0 6.9 | i 2 € 40.0 | AUD =0.7634 USD 2 2 = ro] E 30.0 = 3s . 6 a BR 20.0 $ 37.7 10.0 0.0 FOB Avg Cash Costs Shipping (Cape Hardy SA Royalty(5%ex- Sustaining Capex Price Adjustm

  9. Slide 9: Not Walking Alone: Mine to Customer Solution

    Not Walking Mine to Customer Alone Solution 9

  10. Slide 10: Not Walking Alone: Mine to Customer Solution

    Not Walking Mine to Customer Alone Solution 10

  11. Slide 11: The Path to CEIP Development

    The Path to CEIP Development 1950-60 2008 2008-14 Feb 2014 Apr 2014 2013-15 Sep 2015 Oct 2015 Q2 2016 Q2 2016 Q4 2016 2017 2020 11

  12. Slide 12: Project Assessment: Mine to Customer Solution

    Mine toProject Assessment Customer Solution 12

  13. Slide 13: Wudinna DC population trend

    2000 1500 1976 mm (125; 1981 | 1986 | 1991 | 1996 | 2001 jm Actual population numbers (ABS) Upper predicted population trend if CEIP does progress 2006 | 2011 2016 | 2021 | 2026 | 2031 ts Wudinna DC 25 YEAR LIFE OF MINE 2041 797 ™ Predicted population trend based on -— 1996-2011 data if CEIP does no

  14. Slide 14: 2015 has been a year of convergence

    2015 has been a year of convergence Parallel work streams over 7 year journey have delivered a de-risked project Benefits of premium product confirmed by customers Competitive cost structure through the pricing cycle can be further enhanced Building real relationships to maintain development momentu

  15. Slide 15: Appendix – CEIP Resource Statement & Indicative Concentrate Specifications

    Appendix 1 – CEIP Resource Statement & Indicative Concentrate Specifications CEIP Global Mineral Resource Tonnes Fe SiO2 Al2O3 P Location Classification (Mt) (%) (%) (%) (%) Measured 2,222 15.69 53.70 12.84 0.08 Murphy South/Rob Roy Indicated 474 15.6 53.7 12.8 0.08 Inferred 667 16 53 12 0.08 Indica

  16. Slide 16: Appendix – CEIP Reserve Statement

    Appendix 2 – CEIP Reserve Statement CEIP Global Mineral Reserve Tonnes Fe SiO2 Al2O3 P Location Classification (Mt) (%) (%) (%) (%) Murphy Proved 1,871 15.6 53.9 12.8 0.08 South/Rob Roy Probable 200 15.1 58.5 13.8 0.08 Total 2,071 15.5 54.3 12.9 0.08 The information in this report that relates to Re