Avrupa Minerals Ltd. · TSXV:AVU
Avrupa Minerals — Corporate Update (August 2012)
11 slides from Avrupa Minerals's corporate update, August 2012
Slide 1: Alvalade Joint Venture
AVRUPA MINERALS TSX.V: AVU ‘ALVALADE JO JOINT: w /ENTURE =f gibcran pyrite Beit” Bor tugal f - adoe st 20,2) up. — Ls a <o
Slide 2: Forward Looking Statements
Forward Looking Statements Some of the statements contained in this presentation are forward-looking statements. Forward- looking statements are not historical facts and are subject to a number of risks and uncertainties beyond the Company's control, including, but not exclusively, statements regard
Slide 3: Alvalade JV – project update
Alvalade JV – project update Phase 1 drilling completed • 8 holes and 3,264 meters in 3 target areas Historic core re-logged and sampled • 190 holes, 51,286 meters re-logged • 881 samples collected from re-logged core TSX.V: AVU 3
Slide 4: Alvalade JV – project update
Alvalade JV – project update TSX.V: AVU 4
Slide 5: Alvalade JV – Drilling
Alvalade JV – project update Drilling • Phase 1 completed, 971 samples collected over 3,266 meters drilled in three separate target areas • Full geochemical results pending • Detailed drill logging completed • Alteration and stockwork quartz veining observed in 7 of 8 holes • Geo-structural mineral
Slide 6: Historic drill hole re-logging and sampling
Alvalade JV – project update Historic drill hole re-logging and sampling • 190 holes, 51,286 meters re-logged • 881 samples collected from re-logged core • District-wide results aid in building geo-structural targeting model • Many holes contained mineralization that was never sampled or followed-up
Slide 7: Aldeia dos Elvas
Alvalade JV – Aldeia dos Elvas area TSX.V: AVU 7
Slide 8: Azinheira dos Barros
Alvalade JV – Azinheira dos Barros area TSX.V: AVU 8
Slide 9: Monte da Bela Vista
Alvalade JV – Monte da Bela Vista area TSX.V: AVU 9
Slide 10: Alvalade JV – near future
Alvalade JV – near future Geochemical results • Full results expected by mid-September • Will be used to delineate follow-up drill targets in all three Phase 1 areas Geological mapping • Should be completed in all outcrop areas of the JV by early September • New targets being developed in the Caveir
Slide 11: Alvalade JV – near future: Phase 2 drilling
Alvalade JV – near future Phase 2 drilling • Targeting and planning underway • Budget for up to 3500-3800 meters more drilling in Phase 2, including pre-collar of Tertiary cover • Five new target areas already selected, with more in the pipeline • Planned start-up in mid-September TSX.V: AVU 11