Avrupa Minerals Ltd. · TSXV:AVU
Avrupa Minerals — PDAC 2026
18 slides from Avrupa Minerals's conference presentation, March 2026
Slide 1: Cu-Zn Projects in Pyhäsalmi District, Finland
Cu-Zn Projects in Pyhäsalmi District, Finland Avrupa -- Akkerman Finland Oy (AFOy) PDAC, March 2026 – P.Kuhn, Avrupa; J.Akkerman, AFOy; I.Ayzikov, IA Metals Research TSX.V: AVU FRANKFURT: 8AM TSX.V: AVU US OTC: AVPMF
Slide 2: Disclaimers
Disclaimers This presentation contains forward-looking statements that involve subjective judgement and analysis and accordingly are subject to significant uncertainties and risks, many of which are outside the control of and are unknown to both Avrupa Minerals Ltd. (AVU) or to Akkerman Finland Oy (
Slide 3: Avrupa Summary
Avrupa Summary • Successful project opportunity generator with focus on established historical mining districts in politically stable European jurisdictions; Two significant discoveries now progressing towards potential mining solution. • Ongoing, fully partner-funded Slivova Gold Project in Kosovo
Slide 4: Why Finland
Why Finland • Established, well-accepted mining industry with international producers; • Significant new world-class discoveries (i.e. Kevitsa, Kittilä, Sakatti, Ikkari); • Regulations are clear, manageable, and consistent; • Licensing procedure straight forward and comprehensive, holding fees go di
Slide 5: Base Metals – Why Pyhäsalmi Cu/Zn District
Base Metals – Why Pyhäsalmi Cu/Zn District • Strong mining infrastructure in place, including working mill/flotation plant (1.2 Mt – 1.4 Mt per year); supportive population; • Lots of space for new discoveries in long-established Cu-Zn mining district; • Numerous under-explored prospects with known
Slide 6: VMS Targets – Current Status/Priority
VMS Targets – Current Status/Priority • Lehto – Two Titan-24 EM, drill-ready targets along strike of Pyhäsalmi Mine (>75 Mt pre-mining). Limited historic off- mine drilling cut strongly altered and mineralized mine sequence stratigraphy. Application in process. • Lippikylä – Acquired in Aug 2025. Lo
Slide 7: VMS Targets – Current Status/Priority
VMS Targets – Current Status/Priority • Kangasjärvi – Former producing mine. Two short, scout holes in late 2024 proved concept and potential for mineralization across major fault, but did not cut economic Cu-Zn mineralization. Untested EM anomaly near old mine ready to drill. Other targets on licen
Slide 8: Near-Mine Exploration Licenses
Near-Mine Exploration Licenses N Greater Lehto and Lippikylä permit areas acquired from Pyhäsalmi Mine Oy/First Quantum Minerals. AFOy is compiling and interpreting data and recent drilling results. TSX.V: AVU 8
Slide 9: Drill-ready targets close to Pyhäsalmi Mine
Drill-ready targets close to Pyhäsalmi Mine ▪ Greater Lehto area o Two untested Titan-24 anomalies (1km E, 2km NE of the Mine) o Significant mineral intercepts in nearby drill holes: o PYS 129B -- 26 m @ I.6 %Zn , incl. 2 m @ 12 %Zn o R2224 -- 2 m @ 3.2 %Cu in 129m of sulfide min. ▪ Lippikylä area o
Slide 10: Rauha Massive Sulfide Prospect
Rauha Massive Sulfide Prospect Plan view of Rauha massive sulfide prospect, Vihanti District. Section line in red. TSX.V: AVU 10
Slide 11: Rauha Massive Sulfide Prospect
Rauha Massive Sulfide Prospect Profile 8850E hole_id width Cu % Zn % Pb % Au g/t Ag g/t R-RAU3 0,70 1,21 0,55 3,03 0,44 199,00 R-369 6,00 4,37 5,71 0,29 0,58 27,16 R-RAU4 4,15 2,50 5,28 0,33 0,16 25,84 R-357 3,75 0,77 5,20 0,14 0,09 4,48 R-RAU5 5,95 0,29 1,52 0,21 2,43 7,41 R-372 0,35 0,69 0,08 4,22
Slide 12: Kangas North Drill Target at Kangasjärvi
Kangas North Drill Target at Kangasjärvi Profile -- Kangas North Plan View B SkyTEM and Maxwell Plate EM anomalies and A B modelled plates Kangas North EM A Kangas Main EM Kangasjärvi Zn Deposit TSX.V: AVU 12
Slide 13: Hallaperä VMS Prospect
Hallaperä VMS Prospect Hallaperä Exploration Permit Area Boliden Exploration Permit Area Location of Hallaperä permit Plan view of the deposit, > 1.5 km pink: Massive Ore layer TSX.V: AVU 13
Slide 14: Hallaperä VMS Prospect
Hallaperä VMS Prospect Massive sulfide layer Non – NI 43-101, historic resource available from company reports -- Original geological map Hallaperä VMS deposit, 1967; -- Length 1500 m, thickness 2-18m; Open at depth below 200 m; -- Most recent drilling in 1990 intersected 1.85m @ 1.72 % Cu, 1.7 g/t
Slide 15: Yli-Ii Gold and Oijärvi Greenstone Belt
Yli-li Gold and Oijärvi Greenstone Belt Kylmäkangas Oijarvi Gold Belt Gold deposit • Underexplored greenstone belt, shear zone hosted gold potential; • Kylmäkangas NI 43-101 mineral resource: 311,000 AuEq ounces, grading 3.6 g/t AuEq; • Discovered by Agnico Eagle, but now owned by Goldsky Resources
Slide 16: Plans for 2026
Plans for 2026 • Continue compilation and analyses of all available pertinent data; review and prioritize targets: • Projects with permits granted Hallaperä: Screen depth potential with airborne deep EM; Kangasjärvi Main: Downhole EM to follow-up semi-massive sulfide and stockwork-style sulfide vein
Slide 17: Summary
Summary This is a solid mid-tier explorer/producer opportunity: low infrastructure risks; prime mining friendly jurisdiction; drill-ready mineralized targets; available exploration land. • Mining friendly Finland is a great place to explore; • Avrupa acquires seven Cu-Zn projects well-located in an
Slide 18: Contacts
Contacts Akkerman Finland Oy (AFOy) Jan H. Akkerman, Managing Director Paul W. Kuhn, President/CEO Torenweg 7, 7873BP, Odoorn 410-325 Howe St. The Netherlands Vancouver, BC V6C 1Z7, Canada +31 6 5398 01762 +351-925972240 j.akkerman@akkermanexploration.com paulk@avrupaminerals.com TSX.V: AVU 18