E3 Lithium Ltd · TSXV:ETL
E3 Lithium — Investor Presentation (November 2024)
27 slides from E3 Lithium's investor presentation, November 2024

Slide 1: The Future of Canadian Lithium
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 1 CANADIAN LITHIUM TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 The Future of Canadian Lithium November 2024

Slide 2: Forward Looking Statements
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Forward Looking Statements This presentation contains forward-looking statements and forward-looking information within the effectiveness and feasibility of emerging lithium extraction technologies which have not yet been tested or

Slide 3: Delivering on Strategy
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Delivering on Strategy FOCUS Become revenue generating by establishing reliable and sustainable production through the development of the Clearwater Project. GROWTH To build a portfolio of robust Significant untapped resources for f

Slide 4: Delivering on Value
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Delivering on Value North American Strategic Critical Mineral Asset The Canadian Leader for Lithium-in-brine Pathway for Energy Independence with local supply

Slide 5: Clearwater Project Pre-Feasibility
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Clearwater Project Pre-Feasibility Major milestone to commercializing lithium in Alberta Initial production of 32,250 tonnes of LHM NPV of US$3.70 Billion (after-tax) Mineral reserves 1.29 Mt LHM (Proven & Probable) Zero liquid disc

Slide 6: Clearwater Project PFS Economics
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Clearwater Project PFS Economics 32,250 tpa Initial Production 50 Year Operation PFS Metric Units Value Initial Production Tonnes LHM/year 32,250 Average Production (50-year) Tonnes LHM/year 25,850 IRR (after-tax) NPV 8 (after-tax)

Slide 7: Peer Comparison: Industry-Leading Position on the Cost Curve
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Peer Comparison : Industry-Leading Position on the Cost Curve Hardrock Available Brine Available Global Lithium Carbonate Equivalent Cost Curve (2030) Under Contract 30,000 25,000 20,000 USD per tonne 15,000 10,000 5,000 - - 500 1,0

Slide 8: Accessible Infrastructure
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Accessible Infrastructure National Railway Network Canadian National Canadian Pacific The Clearwater Project has access to robust infrastructure with Other Bashaw District over a century of oil and gas operational excellent supporti

Slide 9: Mineral Resources & Reserves
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Brine Production: Well and Pipeline Network Mineral Resources & Reserves Bashaw District Resources Li LCE LHM Original Lithium in Place (OLIP) (tonnes) (tonnes) (tonnes) TOTAL 3,046,800 16,218,100 18,421,000 Indicated Mineral Resour

Slide 10: Clearwater Process Facility
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Clearwater Process Facility Cogen Power and Carbon Capture Lithium Hydroxide Plant DLE and Post DLE Treatment Pre-Treatment - Degassing Storm Water Pond Gas Compression and Injection Brine Inlet Office and Lab Emergency Flare 9 This

Slide 11: Lithium Production Flowsheet
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Lithium Production Flowsheet Lithium Enriched Brine Direct Lithium Extraction Concentration and Purification Lithium Depleted brine reinjected into the aquifer Brine transported via E3’s chosen DLE produces underground pipelines lit

Slide 12: Lithium Demonstration Facility
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Lithium Demonstration Facility Ob je ctives • Demonstrate DLE at a larger scale utilizing a design that will operate very close to commercial • Confirm the operation of an integrated system operating all processes from brine product

Slide 13: Building a Secure and Responsible Future
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Building a Secure and Responsible Future Water Recycling Carbon Emissions Land Use Water Usage Carbon Emissions Land usage • Zero Liquid Discharge philosophy will • Co-generation is power and heat, it Clearwater Project facility has

Slide 14: Advantages of Alberta Lithium Brines
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Advantages of Alberta Lithium Brines Abundant Lithium Resources large lithium-in-brine resources repurposing from well-known and long producing assets (almost 80 years) Geopolitical Stability allowing for secure and reliable access

Slide 15: Alberta Permitting
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Alberta Permitting Production Test at Alberta First Lithium Evaluation Well Lithium production in Alberta operates similarly to oil and gas production Lithium is governed by the same regulator as the petroleum industry and follows t

Slide 16: Stakeholder Engagement
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Stakeholder Engagement E3 Lithium takes a proactive approach to stakeholder engagement, emphasizing transparency, community involvement and support for local development. An estimated 200 full E3 Lithium values E3 Lithium is E3 Lith

Slide 17: Project Development Highlights
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Project Development Highlights First proven mineral reserve for lithium in-brine; with 1.29 million tonnes LHM (Proven & Probable)1 • Within the largest measured and indicated in Canada at 16.2 million tonnes LCE 1 • The initial pha

Slide 18: Pathway to Lithium Commercialization
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Pathway to Lithium Commercialization • The schedule is largely dependant on the receipt of permits and the timing of project financing. • E3 Lithium is committed to aggressively chasing the project schedule, however, there is no gua

Slide 19: Lithium Demand: North America
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Lithium Demand: North America Canada’s local supply chain ~250,000 tonnes LHM/year1 Demand Supply Balance North America 700,000 600,000 $15 billion EV assembly with battery and cathode (POSCO) 60 GWh Battery with 36 GWh capacity Gig

Slide 20: Capital Structure
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Capital Structure Stock Chart (12 month) Our Partners CAPITAL STRUCTURE Working Capital1 23 M Shares Outstanding (basic) 75.3M Warrants Outstanding(1) 3.8M Options Outstanding 6.2M Shares Outstanding (f.d.) 85.7M TSX VENTURE – QUOTE

Slide 21: E3 Cash Position
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM E3 Cash Position $114.2M Total Capital Raised >40% Available to Spend - $47M combined Alberta Only 75M Shares Outstanding Innovates $0.2M 2017-2019 $4.8M Alberta 2020 $8.5M Innovates $1.8M Strategic Innovation Fund $27M 2021 $17.8M

Slide 22: Pure Lithium Joint Development Agreement
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 Pure Lithium Laboratory in Boston, MS CANADIAN LITHIUM Pure Lithium Joint Development Agreement Why Pure Lithium and E3 Lithium: The Potential for Low- Cost, High-Performance Batteries Concentration and Purification Purified E3 lithium concentrate e

Slide 23: Developing a Pipeline of Projects
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Developing a Pipeline of Projects Bashaw District contains over 16 MT LCE (Measured and Indicated Mineral Resource) For context, the orange box is the Clearwater Project • Initial production of 32,250 tonnes LHM per annum • Operatin

Slide 24: Expanded Valuation Proposition
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM Expanded Valuation proposition Estevan Lithium District • Saskatchewan is a growing lithium jurisdiction • E3 holds a central position of approximately 67,000 hectares of land within the Estevan Lithium District • Recent Inferred M

Slide 25: Why Invest in E3 Lithium
THE FUTURE OF Security of Supply and the THE FUTURE OF CANADIAN LITHIUM TSX.V: ETL TSX.V: OTCQX: ETL || OTCQX: EEMMF EEMMF | FSE: OW3 | FSE: OW3 18 CANADIAN LITHIUM Alberta Advantage E3 Lithium’s 1.29 Mt LHM Reserve1, 50 years operating similar to oil and gas1 Pathway to Commercialization Initial pr

Slide 26: The Team
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 CANADIAN LITHIUM The Team Experienced and highly skilled team committed to maximizing shareholder value Management Team Ch r is Doornbos, P.Geo Ray Ch o w, CPA, CA Kevin Carroll, P.Eng Leigh Cla r ke , LL.B. Peter Ratzlaff, P.Eng Brian Ceelen , P.En

Slide 27: The Future of Canadian Lithium Get in touch
THE FUTURE OF TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 1 CANADIAN LITHIUM TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 The Future of Canadian Lithium Get in touch July 2024 investor@e3lithium.ca www.e3lithium.ca
Source: Internet Archive copy of e3lithium.ca
More decks from E3 Lithium Ltd
Investor Presentation (November 2026)24 slides · November 2026
Investor Presentation (October 2026)26 slides · October 2026
Investor Presentation (September 2026)28 slides · September 2026
Investor Presentation (August 2026)28 slides · August 2026
Investor Presentation (May 2026)28 slides · May 2026
Investor Presentation (March 2025)24 slides · March 2025