  1. Slide 1: Driven By Purpose. Powered By Innovation.

    TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 Driven By Purpose. Powered By Innovation. August 2026 | Corporate Presentation www.e3lithium.ca

  2. Slide 2: Cautionary Notes and Forward-Looking Statements

    Cautionary Notes and Forward-Looking Statements This presentation has been prepared by management of E3 Lithium Ltd. (“E3 Lithium”, “E3”, or the “Company”) Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause and does not represent a recom

  3. Slide 3: Leader in Canadian Lithium

    Leader in Canadian Lithium Experienced, Execution-Focused Team • Strong, disciplined leadership with deep industry experience • Track record of consistent milestone delivery under a clear execution plan • Highly experienced Board providing broad expertise across E3’s entire business Significant Reso

  4. Slide 4: Corporate Profile

    Corporate Profile Capital Markets Summary1 Comparative Global Projects2 20 $1.03 $0.82 - $1.65 M&I Resources (million tonnes LCE) Share Price 52 Week Low/High Share Price E3 Lithium – Clearwater 16 Project $90 million 88 million (16.2 million tonnes LCE) Market Capitalization Common Shares Outstandi

  5. Slide 5: Government Support For Critical Minerals Development

    Government Support For Critical Minerals Development Government Grants Awarded To E3 Lithium Federal Government Financial Support Critical Minerals Infrastructure Fund (CMIF) Total Grants Total Grants • Up to $1.5 billion in funding until 2030; Clean energy and infrastructure projects Awarded To-Dat

  6. Slide 6: Global Peer Direct Lithium Extraction Development

    Global Peer Direct Lithium Extraction Development Peer Comparison Chart – Select Global DLE Developers1,3 Total Annual Production Capacity1,3 Total Annual Production Capacity (Full Project) 1.2 Mt (‘000s tonnes per year LCE) $700 0 10 20 30 40 50 60 Resource Size (Measured and Indicated million tonn

  7. Slide 7: Significant Resource in Place

    Significant Resource in Place 16 Edmonton 16 ` Delineated Reservoir with Substantial Development History • Targeted Leduc formation has over 70 years of oil & gas production history 2 • E3’s resource consists of 21.2 million tonnes measured & indicated (M&I) lithium carbonate equivalent • 75% of the

  8. Slide 8: Industry Leader In Direct Lithium Extraction

    TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 Industry Leader In Direct Lithium Extraction In-House Direct Lithium Extraction (DLE) Expertise • Technical team has DLE and lithium production expertise • Continuously innovating and optimizing to deliver fully integrated facility • Proprietary technology combin

  9. Slide 9: Advantages of Direct Lithium Extraction (DLE)

    Advantages of Direct Lithium Extraction (DLE) DLE’s Commercial and Operational Benefits Hard-Rock Mining  <10% surface footprint compared to traditional development • Large surface footprint • Low lithium recovery  >95% lithium recovery from DLE • Relies on off-site processing • Water intensive 

  10. Slide 10: Optimal Brine for DLE Processing

    Optimal Brine for DLE Processing Battery-Grade Lithium Rich Brine Adsorption-Based Lithium Carbonate Average: ~76 mg/L DLE Processing (>99.5% Li2CO3) E3 Lithium’s brine resource is well-suited for Direct Lithium Extraction (DLE) based on 4 critical factors: Relatively low Optimal Industry Highly con

  11. Slide 11: Significant Technical & Commercial Depth

    Significant Technical & Commercial Depth Corporate Technical Chris Doornbos, P.Geo., ICD.D Brian Newmarch, CFA Tom Gear, P.Eng. Jason Doornbos, P.Eng. Tim Waters, P.Eng. Jody Calvert, P.Eng. Chairperson, CEO, & President Chief Financial Officer Chief Operating Officer VP, Capital Projects VP, Develo

  12. Slide 12: Strategic Oversight and Governance

    Strategic Oversight and Governance Board of Directors Chris Doornbos, P.Geo., ICD.D Alexandra Cattelan, MASC Hon. Sonya Savage, KC, ECA, Kevin Stashin, MBA, P.Eng. Tina Craft, MBA Chair of the Board Lead Director, Chair Compensation LL.M. Chair Corporate Governance Chair Audit Committee Chris, the f

  13. Slide 13: Attractive Long-Term Lithium Fundamentals

    Attractive Long-Term Lithium Fundamentals Global Lithium Demand Growth by End-Use1 Electric Vehicles3 EV 3,516 2025 EV Sales by Select Countries: % of new car sales / (‘000s vehicles sold) '000 tonnes Lithium Carbonate ESS Norway 97% / (173) LFP2: 650 tonnes of LC per GWh >100% growth Sweden 61% / (

  14. Slide 14: Clearwater Project Reservoir and Process Development

    Clearwater Project Reservoir and Process Development Leduc Reservoir in the Bashaw District Optimized Lithium Production Process Wimborne Hydrocarbon Pool DEPTH 3 2,100m 2 1 2,200m Innisfail Production Wells 2,300m Hydrocarbon Pool 2,400m 2,500m 2,600m 2,700m Lithium Production Zone (200m Thick) 2,8

  15. Slide 15: Existing Logistics Support Project Development

    N Existing Logistics Support Project Development Olds 27 240 kVA Two-Lane Multi-Lane Two-Lane Highway Powerline Highway Highway Integration with Existing Infrastructure • Clearwater Facility purposefully sited on existing disturbed site 2A 2 791 • Strategically located near high-voltage power line,

  16. Slide 16: Alberta's Efficient Regulatory Landscape

    Alberta’s Efficient Regulatory Landscape Established Regulatory Framework Key Permits Required for the Clearwater Project1 • The Alberta Energy Regulator (AER) is responsible for Demonstration Project – Phase 2 Application Status overseeing brine-hosted minerals development Directive 056: Wells Appr

  17. Slide 17: Proposed Clearwater Project Update

    Proposed Clearwater Project Update 2024 Pre-Feasibility Study Single Phase Construction with Robust Economics1 • Production capacity of ~32,000 tonnes/year of lithium hydroxide monohydrate (LHM) • An NPV₈ (after-tax) of ~US$3.7 billion with ~25% IRR • Low initial opex of ~US$6,000/tonne and capital

  18. Slide 18: Path to Commercialization in 2026

    Path to Commercialization in 2026 2025 Key Achievements 2026 Key Objectives 2027 – 2029+ Jan 2026 Dec 2026  Produced 99.7% battery-grade lithium carbonate  Ordering/Receiving Long-Lead Equipment  Drilled two wells; analyzing reservoir output Technology Derisking  Drilling Program & Pipeline Demo

  19. Slide 19: Demonstration Facility – A Phased Approach

    Demonstration Facility – A Phased Approach Phase 1: Commissioning Status: Milestones Commission 30-column DLE system and Commissioned equipment, validated process, associated equipment, and produce battery- COMPLETE produced battery-grade product for off-takers (Q4 2025) --- grade lithium carbonate

  20. Slide 20: E3 Lithium: Investment Highlights

    E3 Lithium: Investment Highlights High-Quality Projects With Significant Potential • Targeting 12,000 tonnes/year of lithium carbonate in Stage 1 of Clearwater Project with expansion potential to 36,000 tonnes/year • Highly competitive cost profile with Clearwater positioned in first third of global

  21. Slide 21: Appendix

    Driven By Purpose. TSX.V: ETL | OTCQX: EEMMF | FSE: OW3 Powered By Innovation. Appendix Page | 21

  22. Slide 22: Recent Success: Commissioning of Demonstration Facility

    Recent Success: Commissioning of Demonstration Facility Successfully commissioned Demonstration Facility to inform detailed engineering and ship lithium carbonate Page | 22

  23. Slide 23: Recent Success: Reservoir Development Planning

    Recent Success: Reservoir Development Planning Drilling and completion of commercial well-pair to support subsurface development Page | 23

  24. Slide 24: Recent Success: Meaningful Stakeholder Engagement

    Recent Success: Meaningful Stakeholder Engagement Meaningful stakeholder engagement in local community 1. Additional permits may be required on a project-by-project basis. Approval timeline guidelines are posted on the Alberta Energy Regulator’s website. https://static.aer.ca/prd/documents/applicati

  25. Slide 25: Leduc Delivers Largest Lithium Resources in Canada

    Leduc Delivers Largest Lithium Resources in Canada Historic Leduc #1 Well - 1947 Edmonton Total Reserves & Resources (million tonnes LCE) Reserves Resource ALBERTA Proven & District Measured Indicated M&I Inferred Garrington Probable Bashaw District District Bashaw1 1.14 6.69 9.53 16.22 - Garrington

  26. Slide 26: 2024 Clearwater Project Pre-Feasibility Study Economics

    2024 Clearwater Project Pre-Feasibility Study Economics PFS Metric Units Value Initial Production Tonnes LHM/year 32,250 Average Production (50-year) Tonnes LHM/year 25,850 Total Initial Capital M US$ 2,465 IRR (after-tax) NPV₈ (after-tax) Total Sustaining Capital Annual Operating Cost M US$ M US$ 1

  27. Slide 27: Central Processing Facility

    Central Processing Facility EMERGENCY FLARE BRINE STORAGE STORM WATER POND RECLAMATION SOIL STOCKPILES OFFICE AREA COGEN POWER & FUTURE PHASE 2 CARBON CAPTURE EXPANSION BRINE INLET MAIN GATE GAS HANDLING CARBONATION ION EXCHANGE MEMBRANE AVAILABLE FOR PHASE 3 DLE EXISTING HIGH VOLTAGE POWER LINES Th