Golden Arrow Resources Corp. · TSXV:GRG

Golden Arrow Resources — Technical Presentation (August 2014)

21 slides from Golden Arrow Resources's technical presentation, Aug 28, 2014

  1. Slide 1: Chinchillas Silver-Lead-Zinc Deposit Technical Update

    August 28, 2014 Chinchillas Silver-Lead-Zinc Deposit GROSSO GROUP MEMBER COMPANY Technical Update

  2. Slide 2: Disclaimer

    Disclaimer Forward-Looking Statements This Presentation contains “forward-looking statements” within the meaning of Canadian securities legislation. Such forward-looking statements concern the Company’s anticipated results and developments in the Company’s operations in future periods, planned explo

  3. Slide 3: Chinchillas Silver Project Overview

    Chinchillas Silver Project Overview  New expanded resource estimate includes:  Indicated Resource:  72.3 Moz Ag / 95.9 Moz Ag Eq  (24.6 Mt @121g/t Ag, 0.65% Pb, 0.31% Zn)  Inferred Resource:  40.2 Moz Ag / 68.7 Moz Ag Eq  22.0 Mt @ 57g/t Ag, 0.61% Pb, 0.68% Zn  PEA provides baseline value: 

  4. Slide 4: Chinchilla and Chinchilla 1 Properties

    Chinchilla and Chinchilla 1 Properties GRG.V 4

  5. Slide 5: NI 43-101 Resource Statement

    NI 43-101 Resource Statement Mineral Resource Statement for the Chinchillas Project, August 29th 2014by Kyle Howie, MAIG, Bruce Davis, FAusIMM, Bruce Smith MAusIMM Resource Class/Zone Tonnage Ag Pb Zn Ag Eq Ag Pb Zn Total Ag Eq (Mt) (g/t) (%) (%) (g/t) (Moz) (Mlbs) (Mlbs) (MOz) Indicated Resources S

  6. Slide 6: Mining Comparison

    Mining Comparison Pirquitas (Silver Standard) Chinchillas 200m $NSR (Blocks) >= 0 • Favourable flat lying >= 20 >= 40 Ref: www.silverstandard.com, Sept 2013 corporate presentation geometry & near >= 50 >= 60 surface mineralization = >= 70 low strip ratio GRG.V 6

  7. Slide 7: Attractive Mining Scenario

    Attractive Mining Scenario ✔Open pit amenable Low strip ratio Mineralization starts at surface ✔Higher grade silver core in Silver Mantos Zone ✔Multiple flat-lying mineralized zones ✔Highly Altered Rock GRG.V 7

  8. Slide 8: Infrastructure

    Infrastructure  PEA:  Two all-season access routes  66 km High Voltage line upgrade required;  Access to water from local and regional wells  Thickened tailings to be stored in lined impoundment built from mine waste rock  OTHER ITEMS  Communications available  Other existing precious/metal

  9. Slide 9: PEA & Metallurgy

    PEA & Metallurgy ✔ High recoveries of silver, lead & zinc (bench scale testing) ✔ Standard flotation methods ✔ Chinchillas to produce 2 separate saleable concentrates: silver-bearing lead, and zinc Lead Concentrate Recovery Zinc Concentrate Recovery Assumptions Assumptions Ore_1 (MAN) Recovery Conce

  10. Slide 10: PEA Model Parameters

    PEA Model Parameters Summary of Parameters Unit Processing rate tpd 6000 Strip Ratio 2.2:1 Average Annual Silver Production Moz 5.4 Total Ag produced Moz 64.5 Average Ag grade g/t 86.1 Average Ag recovery (Pb Con) % 85% Life of Mine years 12 Total Unit operating cost $/t feed $27.96 Total Unit cash

  11. Slide 11: PEA Cost Summary

    PEA Cost Summary Capital Costs including 25% Contingency (US$ M) Pre-production Capital $202.3 (Includes pre-stripping, mining capital costs, process plant, infrastructure) Sustaining Capital over life-of-mine $56.8 TOTAL CAPITAL $259.1 Unit Operating Cost Assumptions Unit Cost US$/t feed Mining – O

  12. Slide 12: PEA Cash Flow & Sensitivity

    PEA Cash Flow & Sensitivity Summary of Results Before Tax After Tax NPV 0% (millions) $451.4 $289.7 NPV 5% (millions) $255.3 $153.0 NPV 8% (millions) $177.5 $ 98.5 IRR 22.4% 17.5% Payback period (years) 3.6 3.8 Silver Price Per Pre-tax Pre-tax IRR After-tax After-tax After-tax Payback Ounce NPV8% NP

  13. Slide 13: Chinchillas Path to Feasibility

    Chinchillas Path to Feasibility  Goal is to continue rapid advancement, and move to a Feasibility Study stage 2012 2013 2014 2015 2016 Property Acquisition Social/Enviro Studies Phase I Drilling Phase II Drilling Metallurgy Resource Estimate PEA Phase III Drilling Resource Update PEA Update Infill

  14. Slide 14: Growth Strategy

    Growth Strategy ─ Baseline resource/PEA Completed ─ Recent resources expansion, PEA update ─ 16-20,000 m infill program will upgrade resource categories and provide possible expansion ─ Subsequent programs will target Chinchillas South which has potential for 100 to 160 mt grading 32 to 40 g/t silve

  15. Slide 15: Chinchillas – A low risk opportunity

    Chinchillas – A low risk opportunity Chinchillas provides investors with the potential for near term production at anticipated low capital and operating costs. CATEGORY RISK COMMENTS Resource LOW Good potential that resource will increase significantly and be converted to reserves with up- side pote

  16. Slide 16: Capital Structure

    Capital Structure Shares Issued 40,823,655 Warrants 0 Options (avg price = $0.36) 5,685,000 Fully Diluted 46,508,655 Market Capitalization $8,164,731 Cash and cash equivalent $3,486,700 Ownership (insiders/friends/family) 52% No prior financing overhang GRG.V 16

  17. Slide 17: Contact

    Contact Corporate Head-Office: Suite 709, 837 W Hastings St Vancouver, BC, Canada V6C 3N6 Telephone: 604 687 1828 Toll free: 1 800 901 0058 info@goldenarrowresources.com www.goldenarrowresources.com GRG.V 17

  18. Slide 18: Appendix A - A Visionary

    Appendix A - A Visionary Mr. Joseph Grosso is a respected entrepreneur with extensive international business experience having operated for decades in North/South America as well as in various European and Asian countries. Of Italian descent and fluent in Italian, English and Spanish, Mr. Grosso liv

  19. Slide 19: Appendix B - Key Management

    Appendix B - Key Management BRIAN McEWEN PGeol. - VP Exploration & Development Mr. McEwen is a professional geologist with more than 30 years of exploration and production experience in open-pit and underground mining projects and operations. The extent of his experience is global in managing numero

  20. Slide 20: Pioneering Exploration In Argentina

    Pioneering Exploration In Argentina 1993: 2013: A Mining A Mining Vision Reality Argentine discovery Grosso Group discovery Grosso Group property 2 GRG.V 0 20

  21. Slide 21: Appendix C – Option Terms

    Appendix C – Option Terms Chinchillas Option Terms Golden Arrow may acquire a 100% interest in the Chinchillas project by making the cash payments to the vendor laid out in the table below: Timing Cash Payments ($US) On Signing $20,000 PAID By January 2012* $80.000 PAID By July 2012 $150,000 PAID By