Slide 1: Edge Copper Corporation: Built to Deliver
Edge Copper Corporation Built to Deliver: A growing oxide project above a newly discovered copper-gold-silver-molybdenum sulfide system Zonia Copper Project Zonia Copper Project, Arizona A growing oxide development base above a newly discovered copper- gold-silver-molybdenum sulfide system Sales des

Slide 2: Forward Looking Statement
Forward Looking Statement This presentation contains “forward-looking information” within the meaning of applicable Canadian provincial and territorial securities legislation. Forward- looking information includes, but is not limited to, statements with respect to: the timeline for and development o

Slide 3: A 100%-Owned Arizona Copper Project with a Conventional Development Concept
A 100%-Owned Arizona Copper Project with a Conventional Development Concept Zonia at a glance Yavapai County, Arizona — Tier-1 jurisdiction 100%-owned by Edge Copper Past-producing heap leach operation in the Walnut Grove district Planned Grade A copper cathode Open pit, heap leach and SX/

Slide 4: Zonia offers a staged-development opportunity
Zonia offers a staged-development opportunity Expected material oxide resource growth could strengthen the near-term development case - sulfide system directly beneath creates a potential second-stage opportunity. OXIDE DEVELOPMENT FOUNDATION US$488M After-tax NPV(8%) in the March 2026 PEA 65,000 ft

Slide 5: Zonia offers a staged-development opportunity
Zonia offers a staged-development opportunity Expected material oxide resource growth could strengthen the near-term development case - sulfide system directly beneath creates a potential second-stage opportunity. OXIDE DEVELOPMENT FOUNDATION US$488M After-tax NPV(8%) in the March 2026 PEA 65,000 ft

Slide 6: The oxide program is expected to deliver material resource growth
The oxide program is expected to deliver material resource growth 65,000 ft recently increased 2026 drill program 54 holes reported as at November 5, 2026 Highlights 287 ft at 0.73% CuT from near surface, including 190 ft at 1.01% CuT 290 ft at 0.40% CuT beyond the PEA design pit, including 50 f

Slide 7: The sulfide opportunity sits directly beneath the economic oxide deposit
The sulfide opportunity sits directly beneath the economic oxide deposit Direct vertical overlap creates a potential staged-development advantage: oxide pre-stripping, infrastructure and cash flow could support a later sulfide stage. 876 ft at 0.38% CuEq ZND0063 from 1,075 ft to end of hole Hole end

Slide 8: Broad mineralized intervals in sulfides contain localized higher-grade zones
Broad mineralized intervals in sulfides contain localized higher-grade zones Selected principal sulfide intervals reported November 5, 2026 Length CuEq CuT Hole Selected higher-grade intervals (ft) (%) (%) ZND0063 876 0.38 0.26 80 ft at 0.57% CuEq; 40 ft at 0.70% ZND0068 423 0.50 0.34 71 ft at 0.64%

Slide 9: Zonia is a Major Porphyry System
Zonia is a Major Porphyry System Geophysical footprint has only been partially tested by drilling The geophysics indicate a system materially larger than the area drilled to date. Source: Edge Copper November 5, 2026. Chargeability reflects total sulfide content, mainly pyrite, and is not a measure

Slide 10: Porphyry System Size Comparison
Porphyry System Size Comparison Zonia Cadia-Ridgeway (Mineral Inventory) 4,515 Mt @ 0.25% Cu & 0.47 g/t Au (Approx. 25B lbs Cu) (MI&I 2017 plus past production) Copper Mountain (Mineral Inventory) 1,902 Mt @ 0.29% Cu & 0.12 g/t Au (Approx. 12B lbs Cu) (MI&I 2022 at 0.1% Cu cut off, plus past product

Slide 11: Next work program will test a larger, staged development approach
Next work program will test a larger, staged development approach UPDATED OXIDE PEA CREATES THE PLATFORM SULFIDE DRILLING TESTS MAJOR UPSIDE January 2027 Post-PEA design Expected material increase in the oxide Mineral Use the updated oxide mine plan to position Resource estimate sulfide drilling and

Slide 12: Oxide growth and sulfide upside not reflected in today's valuation
Oxide growth and the staged opportunity provided by sulfide upside not reflected in today’s valuation CURRENT MARKET CAPITALIZATION Material oxide growth expected The 65,000 ft program is expected to support a ~C$75M materially larger January oxide MRE Sulfide sits directly below The discovery occup

Slide 13: For more information
TSX: EDCU For more information: E: investor@edgecopper.com www.edgecopper.com Built on experience. Focused on value.

Slide 14: Legal Matters
Legal Matters Preliminary Economic Assessment The PEA is preliminary in nature, it includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no ce

Slide 15: Management
Management Gil Clausen, Chair & CEO Mining engineer with 40+ years across operations, engineering, finance and project development; more than 20 years as a mining CEO Leadership and transactions include Copper Mountain, Brio Gold, Augusta Resource, Arizona Mining and New World Resources Letitia

Slide 16: Board of Directors
Board of Directors Gil Clausen, Chair & CEO Mining engineer and mining CEO with 40+ years across operations, project development, finance and transactions. Joseph Longpre, Lead Independent Director 35+ years in finance, capital markets and M&A; former CFO of Brio Gold, CEO of Augusta Resource an
Source: company website
More decks from Edge Copper Corporation
Investor Presentation (October 2026)26 slides · October 2026
Investor Presentation (August 2026)27 slides · August 2026
Investor Presentation (July 2026)27 slides · July 2026
Investor Presentation (May 2026)24 slides · May 2026
Investor Presentation (April 2026)20 slides · April 2026
Investor Presentation (March 2026)20 slides · March 2026