Alkane Resources Ltd · ASX:ALK

Alkane Resources — TZMI Congress 2012

29 slides from Alkane Resources's conference presentation, Nov 6, 2012

  1. Slide 1: Presentation – Dubbo Zirconia Project (ASX cover letter)

    R ES O U RCES L TD AB N 3 5 0 0 0 6 8 9 2 1 6 For personal use only 6 November 2012 Manager Announcements Company Announcements Office ASX Limited 20 Bridge Street Sydney NSW 2000 Dear Sir, PRESENTATION – DUBBO ZIRCONIA PROJECT Attached is a copy of the Company’s presentation at the TZMI Congress 20

  2. Slide 2: Dubbo Zirconia Project

    For personal use only Dubbo Zirconia Project j NSW Australia Hong Kong 6 November 2012

  3. Slide 3: Location and Business Strategy

    Location and Business Strategy For personal use only ƒ Alkane is public company (listed on ASX since 1969) ƒ 6,100 shareholders (85% Australian) ƒ Multi commodity exploration and development in the Central West of NSW ƒ Active in region for more than 20 years ƒ Developed Peak Hill Gold Mine in 1996,

  4. Slide 4: Equity & Ownership

    Equity & Ownership For personal use only Equity Ownership ƒ Shares – 372,231,500 ƒ O i Options 4 000 000 – 4,000,000 Domestic Hedge Funds, 8% Institutions, 23% ƒ Market Capitalisation – A$320M Retail and others, Foreign ƒ Cash – A$92M (30 September 2012) 32% Directors and Institutions, 12% ƒ Investm

  5. Slide 5: Rare Metals - Rare Earths

    Rare Metals ‐ Rare Earths For personal use only Rare Metals – Rare Earths • China produces 90% of world downstream zirconium chemicals • China currently produces 95% of world REE output • China is limiting the export of raw rare Rare metals earths materials • Brazil produces 90% of world niobium Lig

  6. Slide 6: DZP Geology

    DZP Geology For personal use only 0 200 metres Jurassic aged trachyte intrusive or lava flow 5

  7. Slide 7: DZP Geology sections

    DZP Geology sections For personal use only 20 year pit floor 6

  8. Slide 8: DZP Resources & Reserves

    DZP Resources & Reserves For personal use only Resources & Reserves ƒ Resources & Reserves – open at depth ƒ Life – +20 years but can support longer life and higher production rates ƒ Major world resource ‐ zirconium, hafnium, niobium, tantalum, yttrium & rare earth elements Resources Depth (m) Tonn

  9. Slide 9: DZP Process Flow Sheet

    DZP Process Flow Sheet For personal use only ƒ Demonstration Pilot Plant – established 2008 ƒ ANSTO – Aust. Nuclear Science & Tech. Org. ƒ Process – unique & advanced ƒ Optimization – ongoing ƒ Sulphuric acid leach whole of ore ƒ Solvent extraction, separation & refining ƒ Chemical precipitation ƒ Z

  10. Slide 10: Demonstration Pilot Plant

    Demonstration Pilot Plant For personal use only Y and HREE refine and recovery DPP Filtration, PLS, SX, Zr and Nb recovery Zirconium refine and precipitation Reverse osmosis and water recycle Operating at ANSTO since 2008 9

  11. Slide 11: DZP Location and Infrastructure

    DZP Location and Infrastructure For personal use only Infrastructure ƒ Population – 80,000 Dubbo region ƒ Rail – railway hub ƒ Road – major highways intersection/hub ƒ Water – numerous sources 10km ƒ Electricity – NSW State power grid 25km ƒ Gas – NSW State gas grid 30km ƒ Industrial – substantial l

  12. Slide 12: DZP Site Infrastructure

    DZP Site Infrastructure For personal use only SRSF Solid residue storage facility LRSF Liquid q residue storage facility Land Six Call Si C ll Options O ti to t acquire i rurall properties or part of properties. One property acquired. Several Put Options for small property owners at Toongi rail sidi

  13. Slide 13: DZP Plant Layout

    DZP Plant Layout For personal use only Zirconium and niobium Sulphuric acid plant recovery Office and workshops R Roasting ti and d lleaching hi Rare earth recovery and refining Solvent extraction Crushing and grinding 12

  14. Slide 14: DZP Products

    DZP Products For personal use only ƒ Zirconium Products zirconium sulphate, hydroxide, oxychloride, oxide (zirconia) ƒ Niobium Products niobium oxide concentrate, ferro‐niobium ƒ Light g Rare Earth Concentrate lanthanum, cerium, neodymium, praseodymium, samarium chloride/oxide ƒ Heavy Rare Earth Con

  15. Slide 15: Zirconium

    For personal use only 14 Zirconium

  16. Slide 16: Zirconium Industry Pricing

    Zirconium Industry Pricing For personal use only Averaged quarterly prices as compiled from multiple sources Source: TCMS 15

  17. Slide 17: Niobium

    For personal use only 16 Niobium

  18. Slide 18: Niobium Demand and Price

    Niobium Demand and Price For personal use only Niobium 2010 (Ferroniobium units) consumption ~85,000t – 90% Brazil Estimate for 2012 ~100,000t Ferroniobium price spiralled to US$60/kg in March 07 and is currently around US$40 - 45/kg Sources: IAMGOLD / TZMI 17

  19. Slide 19: Rare Earth Elements

    Rare Earth Elements For personal use only 18

  20. Slide 20: Rare Earth Pricing

    Rare Earth Pricing For personal use only These prices are for individual separated rare earth oxides at 99% purity, and the actual value for DZP concentrates will depend on market acceptance of the concentrate, but for this table 70% of the value has been assumed. The prices quoted above are average

  21. Slide 21: DZP Product Output

    DZP Product Output For personal use only Anticipated p Production at 1,000,000 , , ore processed p per year p y Product Output ZBS, ZOH, ZBC, ZOC, ZrO2 (+99% ZrO2 + HfO2) 15,700tpa Nb -Ta concentrate / FeNb (70% Nb) 3 005tpa 3,005tpa LREE concentrate (REO) 3,772tpa YHREE concentrate (REO) 1,019tpa T

  22. Slide 22: DZP Marketing

    DZP Marketing For personal use only Off‐take ƒ Zirconium – 100% under MOU (subject to review) ƒ Niobium – 100% under MOU ƒ LREE – MOU to JV process concentrate ƒ YHREE – MOU to JV process concentrate ƒ Throughput – five MOU’s which target production at 1Mtpa Memorandums of Understandings (MOU’s) MOU

  23. Slide 23: DZP Environmental Impact

    DZP Environmental Impact For personal use only Environmental Impact Statement – key areas of focus ƒ Existing land use (agriculture) ƒ S i Socio‐economic i ƒ Air quality ƒ Noise and vibration ƒ Surface and ground water ƒ Soil stability ƒ Flora and fauna ƒ Biodiversity ƒ Visibility ƒ Rail freight mov

  24. Slide 24: DZP Feasibility Studies

    DZP Feasibility Studies For personal use only Definitive Feasibility Study – September 2011 DFS 0.4Mtpa ore processed Capex (incl EPCM and Contingency) A$470M Revenue per annum A$189M NPV (20 years) A$181M Scaled estimates 1.0mtpa Capex (incl EPCM and Contingency) A$893M Revenue per annum A$504M NPV

  25. Slide 25: DZP Financing Program

    DZP Financing Program For personal use only Credit Suisse (Australia) Limited (“CS”), Sumitomo Mitsui Banking Corporation (“SMBC”) and Petra Capital Pty Limited (“Petra”) to provide investment banking services, including the arrangement of project financing to fund the development of the Dubbo Zirco

  26. Slide 26: DZP Development pathway

    DZP Development pathway For personal use only 2009 2010 2011 2012 2013 2014 2015 2016 Resource definition 2001 ‐ 2002 9 Flow sheet development 2002 9 Laboratory Zr – Nb 1999 –2002 9 Pilot plant Zr – Nb 2002 9 Continued product 9 Mine Plan & Scheduling 2002 development Plant Design & Engineering 2002

  27. Slide 27: Dubbo Zirconia Project

    For personal use only Dubbo Zirconia Project A strategic t t i and d alternate lt t supply l for f the th zirconium, i i niobium and rare earths industries Th DZP is The i a world ld class l project j t capable bl off supplying l i “new “ age metals” t l ” in to rapidly developing international mark

  28. Slide 28: Disclaimer

    Disclaimer For personal use only Disclaimer This presentation contains certain forward looking statements and forecasts, including possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth o

  29. Slide 29: Resource & Reserves: DZP

    Resource & Reserves: DZP For personal use only Dubbo Zirconia Project – Mineral Resources Toongi Tonnage ZrO2 HfO2 Nb2O5 Ta2O5 Y2O3 REO U3O8 Deposit (Mt) (%) (%) (%) (%) (%) (%) (%) Measured 35.70 1.96 0.04 0.46 0.03 0.14 0.75 0.014 Inferred 37.50 1.96 0.04 0.46 0.03 0.14 0.75 0.014 Total 73.20 1.96

Alkane Resources — TZMI Congress 2012 on 6ix