Kuya Silver Corporation · CSE:KUYA

Kuya Silver — Investor Presentation (May 2025)

24 slides from Kuya Silver's investor presentation, May 2025

  1. Slide 1: Corporate Presentation May 2025

    Mining silver, delivering growth CORPORATE PRESENTATION MAY 2025

  2. Slide 2: Important Notices

    Important Notices This pres entation does not constitute an offer to sell or a solicitation of an offer to regulations, rules, and policies relating to mining, environmental protection, water looking information or to explain any material difference between subsequent standards in Canada and are mad

  3. Slide 3: Kuya Portfolio: District-Scale Silver Projects

    KUYA PORTFOLIO: 2 DISTRICT-SCALE SILVER PROJECTS PRODUCTION EXPLORATION Bethania Silver Project Silver Kings Project Umm Hadid Project Central Peru Northern Ontario, Canada 4300 Ha Located in major ~13,000 Ha located in Ontario’s most prolific Property: silver-lead-zinc mining district Property: sil

  4. Slide 4: Silver Mining Shares: Unprecedented Opportunity

    SILVER MINING SHARES: UNPRECEDENTED OPPORTUNITY Huge gap between metal price and company values Index needs to double just to catch up to silver! 4

  5. Slide 5: Silver Miners – Supercharged Valuation

    SILVER MINERS – SUPERCHARGED VALUATION Enterprise Value (Market Cap) Silver Miners $80 MM/YR 2,000,000.00 EBITDA 2024 (PROJ.) $79 MM/YR Average Multiple: 32 X JUST ACQUIRED! EBITDA 2024 1,800,000.00 (PROJ.) Range: 10 – 63 X FOR $1.7 BILLION $100 MM EBITDA Enterprise Value (USD $ millions) (10X EBITD

  6. Slide 6: Bethania: Excellent Access and Rich History

    BETHANIA: EXCELLENT ACCESS AND RICH HISTORY 50 km • Located in major silver-lead-zinc mining district in Central Peru • Access mine by road from Huancayo (major city, 500,000 inhabitants) • Daily flights from Lima to Jauja Airport (servicing Huancayo city) • Mine located near (abandoned) mining vill

  7. Slide 7: 100/100 Plan

    100/100 Plan 100 MMoz Silver Resource $100 MM FCF/Year Bethania Bethania 100/100 PLAN 100 mmoz silver Phase 1* Phase 1B* eq. resources • 350 tpd mining rate • Build bethania plant (~$20 M cost at • $12/oz cost at minE + • Eliminate toll milling $0.20 per $3/oz Toll Milling • $24 mm cash flow discove

  8. Slide 8: Bethania: District-Scale Potential

    BETHANIA: DISTRICT-SCALE POTENTIAL 4,300+ Hectare Land Package Bethania Mine Multiple targets Carmelitas 8

  9. Slide 9: Initial Resource

    INITIAL RESOURCE Bethania Near Surface Maiden Resource – Focused on Near Mine • Resource Drilling Focused On Shallow Mineralization Proximal to Bethania Mine Workings • 63% of Indicated Silver Equivalent Resource Estimate Located Above primary production adit (4670 Level) • The resource estimate con

  10. Slide 10: Bethania Production

    BETHANIA PRODUCTION Q1 2025 Operational Growth Increase in mined & processed material. *Production doubled in last 10 days of April Increase in underground development Increase in average head grade and recoveries (Ag, Pb,Zn) *silver recovery up to 94% at end of April Increase in silver – lead and z

  11. Slide 11: Development & Production Timeline (2025)

    DEVELOPMENT & PRODUCTION TIMELINE (2025) Executed a comprehensive optimization of the underground infrastructure. Upgrades to utilities, compressed air, Achieve operational power and water break-even and distribution extending declare commercial below the 640 level production. Q1 2025 Q3 2025 Q4 202

  12. Slide 12: 100/100 Plan: 10X Our Silver Resources

    100/100 Plan 10X OUR SILVER RESOURCES Bethania We have the land! • Bethania mine (4300+ ha) expansion We have the • Tito (1.5 km targets! south) Discovery cost to • Carmelitas, date approx. $0.20 Carmelitas Norte per Ag oz (3 km west) Current resource sits on 15 ha <0.3% of land 12

  13. Slide 13: Bethania: Production and Resource Growth

    BETHANIA: PRODUCTION AND RESOURCE GROWTH Bethania Mine Long Section – PEA: 350 tpd production for 7 Years from starter block (RED) 20+ sub-parallel veins Bethania Main Zone Hilltop Zone N Daniela Vein Santa Elena Vein Sample Carmen Au-Ag vein, up to 6 g/t gold at surface discovered 2022 (not in reso

  14. Slide 14: Tito PH - A New Discovery South of Bethania Mine

    TITO PH - A NEW DISCOVERY SOUTH OF BETHANIA MINE TITO PH TARGET • Tito PH, is located 1.5 km south of the Bethania Mine and hosts at least 6 mineralized veins. • A single vein was traced for 630 m in length and remains open along strike: • Up to 2,085 g/t Ag Eq in samples with 12 of 39 reporting mor

  15. Slide 15: Significant Growth Potential

    SIGNIFICANT GROWTH POTENTIAL CARMELITAS PROPERTIES Located ~3 km from the Bethania Mine. Potential strike extension to high – grade silver-polymetallic vein system at Bethania Combined strike length of mapped veins over 1.1km (similar to Bethania Main + Hilltop combined) Discovery of Carmelitas Nort

  16. Slide 16: The Silver Kings Project

    THE SILVER KINGS PROJECT Silver-Cobalt District with World-Class History • The ~13,000 hectare land package in NE Ontario is located within the historic Cobalt, Ontario silver mining district • Approximately 1/6 of total silver production from the Cobalt and Silver Centre mining camps was produced f

  17. Slide 17: Angus Vein Discovery

    ANGUS VEIN DISCOVERY Phase 1 & 2 drilling at Campbell-Crawford intersected bonanza grade mineralization - 15,372 g/t silver over 3.34 m (hole 23-SK-08) - 2,424 g/t silver over 2.49 m (hole 23-SK-13) - 2,180 g/t silver over 0.40 m (hole 23-SK-26) - 12,200 g/t silver over 0.40 m (hole 23-SK-31) 17

  18. Slide 18: Campbell-Crawford Expansion

    CAMPBELL-CRAWFORD EXPANSION Recent Drilling Intersected 11.5 – 28.6 m wide zone of silver-cobalt mineralization • The Campbell-Crawford discovery area is a wider zone of interrelated mineralized structures • Primary veins (Angus, McNamara), intersected by multiple secondary “ladder veins” • 24-SK-23

  19. Slide 19: New Vein Cluster Expands Angus Vein Target

    NEW VEIN CLUSTER EXPANDS ANGUS VEIN TARGET New vein cluster is located 100 m to the west of the main Angus Vein bonanza-grade silver zone in a previously untested area Size of silver-cobalt mineralized footprint has been expanded to 375 m by 250 m and remains open 19

  20. Slide 20: 2 Projects Perfectly Situated Along the Lassonde Curve

    2 PROJECTS PERFECTLY SITUATED ALONG THE LASSONDE CURVE Risks Fluctuating commodity prices Funding risk Technical Risk High Exploration Risk Value Discovery There is a tipping point in This is most likely the time when exploration when drilling amounts people outside of the mining industry to a real

  21. Slide 21: Share Structure

    Shares Outstanding 121,381,090 SHARE STRUCTURE Market Capitalization (May 5th, 2025) ~C$31.2 Million​ Warrants​ ($0.37 - $0.70 strike) 40,032,043 Options and RSUs 4,084,800​ Public Float/Other Fully Diluted 164,795,579 68% Significant Shareholders Management 11.3% 11.3% Kuya Advisory Team​ (Peru) 5.

  22. Slide 22: Management & Directors

    MANAGEMENT & DIRECTORS David Stein, MSc (Geo), CFA Mr. Stein founded Kuya Silver in 2017 to acquire the Bethania Silver Mine and develop the next silver mining company. Mr. St ein has spent most of his 20-year career in mining investments, first as a sell-side analyst and more recently as an investm

  23. Slide 23: Venture (Junior Mining) Dilution Curve

    VENTURE (JUNIOR MINING) DILUTION CURVE Max Shares (Ay) • Free cash flow positive Shares Outstanding • High valuation relative to cash needs • Balance sheet and assets to support debt RTO/IPO (y) High Risk of Dilution Mature – Lower Risk of Dilution Share Buybacks Time (x) 23

  24. Slide 24: Start your journey at www.kuyasilver.com

    @KuyaSilver KuyaSilverCorp Follow Kuya Silver Kuya-Silver Email our team at Start your journey at info@kuyasilver.com www.kuyasilver.com for more information

Kuya Silver — Investor Presentation (May 2025) on 6ix