Gateway Mining Limited · ASX:GML

Gateway Mining — Shareholder Meeting (November 2011)

23 slides from Gateway Mining's shareholder meeting presentation, Nov 30, 2011

  1. Slide 1: Annual General Meeting Technical Presentation

    GATEWAY MINING LIMITED For personal use only Annual General Meeting 30th November 2011 Technical Presentation AGM 30 November 2011 1 ASX CODE: GML

  2. Slide 2: Project Locations

    PROJECT LOCATIONS For personal use only SURPRISE (Copper-Gold) GIDGEE (Copper-Gold) COWRA (Copper-Gold) AGM 30 November 2011 2

  3. Slide 3: Exploration: Current Status

    EXPLORATION For personal use only Current Status  The Company has advanced copper-gold exploration projects  A number of drill ready base metal and gold targets at Gidgee in Western Australia  Joint Ventures active on the Western Australian Projects  Looking for JV partners for Cowra Project AGM

  4. Slide 4: Exploration: Joint Venture Activity

    EXPLORATION For personal use only Joint Venture Activity  In the last 12 months joint venture activities have included:  Gidgee: Avenue JV – 2 separate JV’s are ongoing, Avenue has satisfied first year commitments  Gidgee: Bungarra JV with Legend – terminated, with Gateway taking control of the J

  5. Slide 5: Project, WA: Overview

    GIDGEE PROJECT, WA For personal use only Overview  Includes approximately 200km2 of tenements over the Gum Creek Greenstone belt  Prospective for gold and copper  Significant exploration success for both commodities  Results from 2010/2011 work have significantly enhanced the VMS base metal pote

  6. Slide 6: Project, WA: Overview Map

    GIDGEE PROJECT, WA For personal use only 745,000 mE 750,000 mE 755,000 mE Overview Granitoids Western greenstone Bungarra volcanics and siliciclastics – Base metals Ultramafics  Tenement and JV areas Eastern Greenstone basalt and silciclastics Victory Creek - Gold 6,970,000 mN  Main prospect locat

  7. Slide 7: Project, WA: Work Completed

    GIDGEE PROJECT, WA For personal use only Work completed  EM geophysical surveys  Ground follow up of geophysical anomalies  Aircore (~3,200m) and RC (~2,500m) drilling programme  Reconnaissance field work  Drill targets generated, and now ready to drill with Programmes of Work approved AGM 30 N

  8. Slide 8: Project, WA: VMS Potential

    GIDGEE PROJECT, WA For personal use only VMS Potential  Aircore and RAB drilling has intersected significant Cu, Zn, As, Sb, Mn and Ba anomalism along a significant stratigraphic length  A number of these holes have intersected sulphides and gossans  These zones also contain a number of Electro-M

  9. Slide 9: Gossans Galore, Gravel Pit – VMS Potential

    GIDGEE – GOSSANS GALORE, GRAVEL PIT – VMS POTENTIAL For personal use only Overview  2010 aircore – white circles, earlier RAB – black dots Central  Excellent VMS potential – not as yet West tested by RC drilling, and only East sparse aircore drilling  Strong EM anomalies  Anomalous Cu, Zn and VM

  10. Slide 10: Gossans Galore, Gravel Pit: Results

    GIDGEE – GOSSANS GALORE, GRAVEL PIT For personal use only Results  West Anomaly – 800m strike, steep NE dip, top at 148m below surface, anomalous Cu (to 773ppm), Zn (to 396ppm), As (to 2,020ppm) in three aircore holes drilled. Gossan at end of one hole  Central Anomaly – 900m strike, steep NE dip,

  11. Slide 11: The Cup, Julia's Fault: Overview

    GIDGEE – THE CUP, JULIA’S FAULT For personal use only Overview  2010 RC drilling – white circles, previous RAB and RC drilling – black dots Julia’s Fault  Both prospects occur on a 3km interpreted mineralised trend, marked by EM and geochemical anomalism  EM Anomalous Zone is possibly at the uppe

  12. Slide 12: Airport Area: Overview

    GIDGEE - AIRPORT AREA For personal use only Overview  Located over a group of oxide gold deposits mined in the 1980’s by Herald Resources and others, with Herald (through Goldfan) still retaining a 15% free carried interest in a number of the tenements  Approximately 100,000oz of gold was produced

  13. Slide 13: Airport Area: 2010 Drilling Summary

    GIDGEE - AIRPORT AREA For personal use only 2010 Drilling Summary  RC drilling over a number of prospects:  Rosie Northeast – 3 x 200m holes testing coincident geophysical and geochemical anomalies  Whistler – 2 x 200m RC holes testing for repeats and extensions of the current 24,800oz JORC-compl

  14. Slide 14: Airport - Rosie Area

    AIRPORT - ROSIE AREA For personal use only AGM 30 November 2011 14

  15. Slide 15: Bungarra: Overview

    BUNGARRA For personal use only Overview  Reconnaissance work has been carried out on the now 100% Gateway held Bungarra tenements (E57/706 and E57/709)  This has included ground checking a number of prospects defined by Legend, and also following up a number of EM anomalies  Preliminary interpret

  16. Slide 16: Other Prospects: Overview

    GIDGEE - OTHER PROSPECTS For personal use only Overview Victory Creek – gold mineralisation requiring further drilling Birthday Zone – intermittent gossans and EM conductors coincident with anomalous geochemistry along a strike of 5km Part of this trend forms the eastern margin of the Montague Gr

  17. Slide 17: Project, WA: Going Forward

    GIDGEE PROJECT, WA For personal use only Going Forward  Drilling has been planned for targets generated from EM surveying, 2010 drilling and field work  This is on both 100% GML ground and all JV tenements, which Gateway currently manages  Programmes of Work approved for this programme  Continui

  18. Slide 18: Cowra Project, NSW: Overview

    COWRA PROJECT, NSW For personal use only Overview  Exploring for copper-gold in the Molong Volcanic Belt, host to the 30 million oz Newcrest Cadia/Ridgeway operations.  The Cowra Tenements are the least explored area in the Belt. These contain large complex intrusives with associated skarn develop

  19. Slide 19: Cowra Project, NSW: Joint Venture

    COWRA PROJECT, NSW For personal use only Joint Venture  JV with Minotaur and Mitsubishi Corp/Mitsubishi Materials Corp terminated  Leases (EL5514, 6102) have reverted 100% to Gateway  Joint Venture partners being sought AGM 30 November 2011 19

  20. Slide 20: Cowra Project, NSW: Work Completed

    COWRA PROJECT, NSW For personal use only Work Completed  Work carried out included ground EM and magnetics surveys over nine targets identified from a heliborne VTEM survey  Drilling was carried out over eight priority targets  This drilling intersected significant sulphides in all of the targete

  21. Slide 21: Surprise Project, QLD: Overview

    SURPRISE PROJECT, QLD For personal use only Overview  Gateway is in the process of relinquishing its Surprise Project interests AGM 30 November 2011 21

  22. Slide 22: Disclaimer

    GATEWAY MINING For personal use only Disclaimer This presentation has been prepared by Gateway Mining Limited (Gateway). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties

  23. Slide 23: Contact

    GATEWAY MINING For personal use only For further information visit our website at www.gatewaymining.com.au or contact: Bob Creelman, Director, or Mark Gordon on Tel: 02 9283 5711 AGM 30 November 2011 23

Gateway Mining — Shareholder Meeting (November 2011) on 6ix