Goldquest Mining Corp. · TSXV:GQC

Goldquest Mining — Investor Presentation (November 2017)

24 slides from Goldquest Mining's investor presentation, November 2017

  1. Slide 1: GoldQuest Corporate Presentation Oct/Nov 2017

    GOLDQUEST TSXV: GOC opper in the jing Mine L ploration 5OLDQUEST Oct/Nov 2017

  2. Slide 2: Forward-looking statements

    Statements contained in this presentation that are not historical facts are forward-looking information that involves known and unknown risks and uncertainties. Forward- looking statements in this presentation include, but are not limited to, statements with respect to the pre-feasibility study for

  3. Slide 3: A Growth Company

    A Growth Company Developing  The Romero Gold/Copper mine, Dominican Republic  GQC discovered the multi-million ounce gold deposit in 2012  Pre-feasibility study (PFS) published Nov. 11th, 2016 @ 28% IRR and $595/oz All in Sustaining Costs (AISC)  Permitting in progress Exploring  The 50-km long

  4. Slide 4: The Dominican Republic

    The Dominican Republic Canada Romero Project Tireo USA Concessions Puerto Plata Dominican Republic Falcondo Pueblo Viejo Mine Mine  Strong relationship with the government and community San Juan  No Government Royalties Santo Domingo  Reasonable Taxes (32%)  One of the fastest growing source www

  5. Slide 5: Veteran Team with proven DR experience

    Veteran Team with proven DR experience Bill Fisher, P.Geo Executive Chairman, CEO • Former CEO Globestar • Chairman Aurelian Felix Mercedes, MBA • VP Exploration of Boliden Country Manager • Director of Mining & Paul Robertson, CA,CPA Petroleum Chamber in the DR CFO • Former CFO Grayd Resources (acq

  6. Slide 6: Technical & Financial Expertise

    Technical & Financial Expertise Bill Fisher, P.Geo Julio Espaillat, M.Eng Executive Chairman, CEO Director • Former CEO Globestar • Retired as full-time CEO Q3 ‘17 • Chairman Aurelian • Former Country Manager • VP Exploration of Boliden Globestar Florian Siegfried, MBA Patrick Michaels Director Dire

  7. Slide 7: Prefeasibility Study Highlights

    Prefeasibility Study Highlights NPV*5% IRR* AISC* PAYBACK $203M 28% $595/OZ. 2.5YRS AFTER TAX AuEq.** LTP-94 158.6m to 160.0m 288.6 g/t Gold 5.6% Copper  Currently in the permitting phase * Net Present Value (“NPV”), Internal Rate of Return (“IRR”), All-In Sustaining Costs (“AISC”)  Preliminary Fe

  8. Slide 8: PFS: Responsible Mine Design

    PFS: Responsible Mine Design Minimal Surface Impact  Small surface footprint over underground mine, thus minimal affect on landscape Return Wasterock Underground  Wasterock will be returned underground as backfill No use of Cyanide or other Contaminates  A gold/copper concentrate product will be

  9. Slide 9: 2016 PFS Highlights

    2016 PFS Highlights Low Capex, High IRR, Scalable Deposit After-Tax NPV & IRR Sensitivity to Gold Price PFS Summary Results At US$1300 Au / US$2.50.lb Cu After Tax NPV5% After Tax IRR Start-Up CAPEX $158M $350 35% Sustaining CAPEX $92M $300 30% After Tax NPV5% (US$M) Throughput 2800 tpd $250 25% Aft

  10. Slide 10: Gold-Copper Starter Mine

    Gold-Copper Starter Mine only considers 35% of current M&I Resource Surface Portal Ventilation Access Ramp View Looking North Production Ramp  2800 tpd – 75% Longhole  Large Stopes (up to 20m x 20m x 50m)  Options to expand mine as metal prices rise Remaining Mineral Resources www.goldquestcorp.c

  11. Slide 11: Gold Equivalent Ounces

    NPV5% IRR AISC PAYBACK AFTER TAX $595/OZ. 2.5 The Gold/Copper Concentrate $203M 28% AuEq. YEARS Gold Equiv. Payable Oz. Starter Mine (35% of resource only) 180 GOAL: maintain or exceed 150,000 oz per year (Remaining Resource = Potential) 160 153,600 Gold Equivalent Ounces 140 136,800 135,600 124,800

  12. Slide 12: All in Sustaining Costs and Gold Price

    NPV6% IRR AISC* PAYBACK $203M AFTER $595/OZ. 2.5 TAXES YEARS All in Sustaining Costs (AISC) 28% AuEq. $1,400 LOM LOM ($/tonne) ($/oz.) $1,200 Mining $27.7 $222.4 Gross Processing $11.6 $93.1 $1,000 Margin Tailings Management $1.3 $10.3 Gold Price $800 $705 G & A (Site) $5.4 $43.8 $600 Total Cash Cos

  13. Slide 13: Permitting a Mine in the Dominican Republic

    DEVELOPMENT Permitting a Mine in the Dominican Republic Exploration Concession Application Process Mineral Exploration & Environmental 2005 – Ore Deposit Discovery License Application Process 2012 Sequential and time Mine intensive process of gathering and testing data to Construction find economic

  14. Slide 14: Romero Project Exploration Focus

    Romero Project Exploration Focus www.goldquestcorp.com | 14

  15. Slide 15: The "String of Pearls"

    The “String of Pearls” Romero: 10.4 g/t - 234.8m Grab Samples Gold (g/t) 2.0 – 167.5 (201) BDL – 2.0 (3272) Las Tomates: 4.7 g/t - 6.8 m Tireo Land Package Perimeter Hydrothermal Alteration Romero South: 10.75 g/t - 28.5 m Ongoing Ex;loration Program Previously Reported Drilling Imperial: 8.5 g/t -

  16. Slide 16: Exploring the Tireo Belt

    Exploring the Tireo Belt Romero Deposit We find gold! Romero South Deposit  Targets occur along the mineralized trend hosting the Cachimbo Discovery and the Romero Deposits IP Chargeability (mV/V)  These deposits occur in clusters along plate boundaries – we are on the Atlantic/Caribbean boundary

  17. Slide 17: Poligon SE 1000

    (Jan 2017) • VMS System Surface sample: confirmed 168 g/t gold • Resource growing Poligon SE 1000 • High-grade seafloor facies identified (zinc and barite) • Seeking Romero-style Hole 9 - 5 m @ 14 g/t gold, 12% zinc sub-seafloor feeder 74 g/t silver Open (Down SE) Hole 44 - 21m @ 7.9 g/t gold,, 1.8%

  18. Slide 18: Summary

    Summary Developing  One of few recent significant discoveries globally  Continuing to de-risk our high return project  PFS (Nov 11th, 2016) @ 28% IRR and $595/oz AISC  Permitting underway Exploring  10,000 m drilling in progress  20 new targets in 100% owned, 50 km Tireo Belt  Cachimbo discov

  19. Slide 19: Stock Price Performance and Price Targets

    Stock Price Performance and Price Targets Analyst Target Prices GoldQuest Stock Chart *** $0.70 3.5 Michael Curran Agnico Eagle Private C$1.40 * Placement @ C$0.60 per $0.60 3.0 common share $0.50 2.5 Share Price (C$/share) Stuart McDougall C$1.25 ** Volume (M) $0.40 2.0 $0.30 1.5 Tyron Breytenbach

  20. Slide 20: An Emerging Developer with Exploration Upside

    COMPELLING SIGNIFICANT ECONOMICS CLEAR EXPLORATION DEVELOPMENT UPSIDE ROMERO: PATH Fully Scalable An Emerging Developer with Exploration Upside www.goldquestcorp.com | 20

  21. Slide 21: Market Capitalization and Shares Outstanding

    Market Capitalization* ~C$124M Shares Outstanding 254,007,384 Basic Shares Outstanding 291,057,724 Fully Diluted Cash* 25.8M Stock Price** C$0.38 * Cash (Actual) as of June 30st, 2017 **As of September 15th, 2017 close Management Contact Info: Share Information Bill Fisher CEO Paul Robertson CFO Bil

  22. Slide 22: Mineral Reserve & Resource Estimate for Romero Project

    Mineral Reserve & Resource Estimate for Romero Project Romero Mineral Reserve Estimate Mine Reserves Tonnes Au Ag Cu Au Eq(1) (Cutoff $70 (g/t) (oz) (g/t) (oz) (%) (M lb) (g/t) (oz) NSR)(2) Total Probable 7,031,000 3.72 840,000 4.33 980,000 0.88 136 4.9 1,117,000 (1) Au equivalent metal prices: Au $

  23. Slide 23: GoldQuest's CSR Commitment

    GoldQuest’s CSR Commitment  The inclusion of communities in our activities The Planet  Implementation of sustainable • Environmental Stewardship environmental practices  Active participation in the sustainable economic development of the area CSR  Commitment to the safety and health of Company C

  24. Slide 24: Gold-Rich VMS Clan

    Gold-Rich VMS Clan 167.5 g/t Au at surface Au Zn-Au Au Au Cachimbo Zn-Au Discovery Cu-Au Romero Project Cu-Au Cu-Au www.goldquestcorp.com | 24 Image modified from Dubé, B; Gosselin, P; Mercier-Langevin, P; Hannington, M; Galley, 2007. Mineral deposits of Canada: a synthesis of major deposit-types, d