Slide 1: Corryong Community Meeting
Corryong Community Meeting 31 July 2013 Lindsay Ward ASX : DTM Managing Director July 2013 1

Slide 2: Disclaimer
DISCLAIMER The information contained in this document is disclosed to you by Dart Mining NL (ACN 119 904 880) (the "Company"). Nothing in this document shall form the basis of any contract or commitment, or constitutes investment, financial product, legal, tax or other advice. The information in thi

Slide 3: DTM Cashed Up + Moving Forward
DTM CASHED UP + MOVING FORWARD Cash ~$6.2M1 with burn rate ~$240,000 / month PLUS $4.7M 2nd Red Kite Tranche2 PLUS FY13 R&D refund Vic. Govt re-affirming it’s commitment to resource development Single contact point, project facilitation, statutory timeframes Strategy 1 – Progress Unicorn Prefeasibil

Slide 4: DTM Investment Highlights
DTM INVESTMENT HIGHLIGHTS • Unicorn deposit – potentially a long life Mo + Cu + Ag porphyry mine • Red Kite (US metal merchant) invests upto A$10M – detailed due diligence • Prefeasibility underway – fully funded, as is regional exploration • High grade from surface – very low strip ratio / availabl

Slide 5: About RK Mine Finance – Red Kite
ABOUT RK MINE FINANCE – RED KITE • RK Mine Finance specializes in providing development, acquisition and bridge financing to miners of precious & non-ferrous metal (www.RKMineFinance.com) • Red Kite Group – ~$3.5B under management1 (~$1.7B mine finance exclusively) • Large global metal merchant – NY

Slide 6: High Grade Zones Continue at Depth
HIGH GRADE ZONES CONTINUE AT DEPTH Additional Rhyolitic Pulse showing UST - Pulse centre to the east of drilling. Coarse visible Mo within radial veins showing strong Potassic alteration halos. 6

Slide 7: Scoping Study Production Parameters
SCOPING STUDY PRODUCTION PARAMETERS • Initially open cut mine – potential to move to underground • Residential mine within Corryong Community – not fly in fly out • High grade from surface and outcrops – very low strip ratio • Clear / Mine / Crush / Float / Tailings – simple separation process • Tar

Slide 8: Pre-Feasibility Study Partners
PRE-FEASIBILITY STUDY PARTNERS Ecology & Cultural Heritage - Biosis Environmental and Approvals - are expert consultants in the field of GHD are a longstanding Global Environmental, Ecology (fauna & flora) consultancy firm specialising in and Cultural Heritage Management Environmental Management thr

Slide 9: Indicative Pathway to Production
INDICATIVE PATHWAY TO PRODUCTION 1Unicorn is not in production and there is no certainty that the pathway to production will occur

Slide 10: Employment Opportunities
EMPLOYMENT OPPORTUNITIES • Approximately 85 full time jobs when in operation Trades, equipment & plant operators, supervisors and warehousing Geology, mining, processing, metallurgy, surveying, accounting Only essential employees onsite - other staff based in Corryong Not fly in fly out - fu

Slide 11: Environmental Effects Statement
ENVIRONMENTAL EFFECTS STATEMENT • In Victoria, environmental assessment of the potential environmental impacts or effects of a proposed development may be required under the Environmental Effects Act 1978 • When a proposed project could potentially have significant environmental effects, a written r

Slide 12: What Is Included in an EES?
WHAT IS INCLUDED IN AN EES? • A description of the proposed development • An outline of public and stakeholder consultation • A description of the existing environment that may be affected • Predictions of significant environmental effects of the project • Proposed measures to avoid, minimise or man

Slide 13: Studies Likely to Be Completed
STUDIES LIKELY TO BE COMPLETED • Risk assessment • Cultural heritage • Soils and geochemistry • Air quality • Surface water, flooding and • Noise and vibration drainage • Visual • Biodiversity and habitat • Social and economic • Groundwater • Road, traffic and transport • Water use • Rehabilitation

Slide 14: Community Involvement
COMMUNITY INVOLVEMENT • Dart Mining is committed to involving the community in the EES process • Dart Mining will further develop their Consultation Plan to inform individuals and groups who could be affected and provide opportunities for input • Consultation will help Dart Mining to identify issues

Slide 15: Ecological Assessment - Biosis
ECOLOGICAL ASSESSMENT - BIOSIS • Biosis Wangaratta office is managing the Ecological and Cultural Heritage aspects of the Prefeasibility Study for Dart Mining • Biosis provide expert consulting services in ecology and cultural heritage. They are industry leaders and have 30 years experience througho

Slide 16: Key Legislation & Government Policy
KEY LEGISLATION & GOVERNMENT POLICY • Commonwealth Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) • Victorian Flora and Fauna Guarantee Act 1988 (FFG Act) • Victorian Environmental Effects Act 1978 • Victorian Planning and Environment Act 1987 (including regulations for per

Slide 17: Survey Aims and Methodology
SURVEY AIMS AND METHODOLOGY • Database searches to determine potential for listed species and communities • General field survey (collecting lists of species, assessing vegetation, habitat type and quality) • Map suitable habitat for listed flora species (survey during spring flowering season) Austr

Slide 18: Field Survey Results - Fauna
FIELD SURVEY RESULTS - FAUNA • Majority of fauna habitat types within the study area are common and widespread in the region (drier forests and woodlands) • Most of the fauna species detected during survey are common, and typical of the habitat types present • White-footed Dunnart was recorded (list

Slide 19: Some Fauna Species Identified
SOME FAUNA SPECIES IDENTIFIED Black Feral Wallaby Cat DRILL RIG Long-nosed White- Bandicoot Winged Chough Eastern Superb Yellow Lyrebird Robin 19

Slide 20: Field Survey Results - Flora
FIELD SURVEY RESULTS - FLORA • The majority of the vegetation types within the investigation area are common widespread, and have a conservation status of ‘least concern’ • The investigation area may contain two species listed under the EPBC and FFG Acts (Purple Eyebright and Austral Toad-flax). • T

Slide 21: Ecological Assessment - Summary
ECOLOGICAL ASSESSMENT - SUMMARY • Preliminary flora and fauna findings are being reviewed by the regulatory authorities • Further survey’s will be undertaken in spring • Cultural heritage studies will be undertaken in 2014 • Biosis will provide ongoing objective advice to ensure compliance with legi

Slide 22: Tailings Storage Options
TAILINGS STORAGE OPTIONS • ATC Williams (specialist tailings engineers) retained to develop a tailings and water management solution for Unicorn • Five tailings storage options investigated Teapot Creek - adjacent to Mt Unicorn Bunroy Creek - located south-east of Mt Unicorn in a heavily foreste

Slide 23: Tailings Site Selection Parameters
TAILINGS SITE SELECTION PARAMETERS • Potential to store life of mine tailings production (200Mt) • High storage efficiency - ratio of storage volume to wall height • Community, cultural heritage and societal considerations • Site vegetation and current land use • Tailings discharge and return water

Slide 24: Tailings Storage Options
Mn zjR TAILINGS STORAGE OPTIONS

Slide 25: Proposed Tailings Storage Site
PROPOSED TAILINGS STORAGE SITE 25

Slide 26: Bull Paddock Creek - Preferred Site
BULL PADDOCK CREEK - PREFERRED SITE • Efficient site in terms of ratio of wall height to storage volume • Relatively isolated location with minimal visual impact • Low grade regrowth forest rather than prime agricultural land • No known cultural heritage constraints – detailed survey still to be com

Slide 27: Bull Paddock Creek - Preferred Site
BULL PADDOCK CREEK - PREFERRED SITE • Tailings dam will block run off from Bull Paddock creek • It will be a NIL DISCHARGE Tailings dam ie no runoff from tailings into Thowgla creek • Investigating the viability of diverting part of the southern Bull Paddock creek catchment to maintain environmental

Slide 28: Summary and Key Take Aways
SUMMARY AND KEY TAKE AWAYS • Unicorn deposit – potentially a long life Mo + Cu + Ag porphyry mine • Red Kite investing up to A$10M into Unicorn – detailed due diligence • Prefeasibility underway – fully funded, with cash at bank $6.2M1 • Approvals process has commenced – EES referral to be submitted

Slide 29: Further Disclaimer
FURTHER DISCLAIMER Economic Potential The Unicorn project remains at an early stage of planning and assessment and there are risks associated with the estimates of key parameters (including but not limited to further metallurgical test work to advance mineral processing design and the need to accura

Slide 30: Competent Person Statement
9 Competent Person Statement Information in this report that relates to a statement of Exploration Results and Mineral Resources of the Company is based on information compiled by Dean Turnbull B.App.Sc.(Geol) Hons. M. AIG. Mr Turnbull is a Director and full time employee of Dart Mining NL and has s
Source: Internet Archive copy of dartmining.com.au
More decks from Dart Mining NL
Shareholder Meeting (November 2026)24 slides · November 2026
Investor Presentation (June 2026)21 slides · Jun 25, 2026
Shareholder Meeting (November 2025)29 slides · Nov 26, 2025
Investor Presentation (November 2025)28 slides · Nov 10, 2025
Investor Presentation (August 2025)31 slides · Aug 27, 2025
Investor Presentation (March 2025)38 slides · Mar 26, 2025