Dart Mining NL · ASX:DTM

Dart Mining NL — Corporate Update (July 2013)

30 slides from Dart Mining NL's corporate update, Jul 31, 2013

  1. Slide 1: Corryong Community Meeting

    Slide 1: Corryong Community Meeting

    Corryong Community Meeting 31 July 2013 Lindsay Ward ASX : DTM Managing Director July 2013 1

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER The information contained in this document is disclosed to you by Dart Mining NL (ACN 119 904 880) (the "Company"). Nothing in this document shall form the basis of any contract or commitment, or constitutes investment, financial product, legal, tax or other advice. The information in thi

  3. Slide 3: DTM Cashed Up + Moving Forward

    Slide 3: DTM Cashed Up + Moving Forward

    DTM CASHED UP + MOVING FORWARD Cash ~$6.2M1 with burn rate ~$240,000 / month PLUS $4.7M 2nd Red Kite Tranche2 PLUS FY13 R&D refund Vic. Govt re-affirming it’s commitment to resource development Single contact point, project facilitation, statutory timeframes Strategy 1 – Progress Unicorn Prefeasibil

  4. Slide 4: DTM Investment Highlights

    Slide 4: DTM Investment Highlights

    DTM INVESTMENT HIGHLIGHTS • Unicorn deposit – potentially a long life Mo + Cu + Ag porphyry mine • Red Kite (US metal merchant) invests upto A$10M – detailed due diligence • Prefeasibility underway – fully funded, as is regional exploration • High grade from surface – very low strip ratio / availabl

  5. Slide 5: About RK Mine Finance – Red Kite

    Slide 5: About RK Mine Finance – Red Kite

    ABOUT RK MINE FINANCE – RED KITE • RK Mine Finance specializes in providing development, acquisition and bridge financing to miners of precious & non-ferrous metal (www.RKMineFinance.com) • Red Kite Group – ~$3.5B under management1 (~$1.7B mine finance exclusively) • Large global metal merchant – NY

  6. Slide 6: High Grade Zones Continue at Depth

    Slide 6: High Grade Zones Continue at Depth

    HIGH GRADE ZONES CONTINUE AT DEPTH Additional Rhyolitic Pulse showing UST - Pulse centre to the east of drilling. Coarse visible Mo within radial veins showing strong Potassic alteration halos. 6

  7. Slide 7: Scoping Study Production Parameters

    Slide 7: Scoping Study Production Parameters

    SCOPING STUDY PRODUCTION PARAMETERS • Initially open cut mine – potential to move to underground • Residential mine within Corryong Community – not fly in fly out • High grade from surface and outcrops – very low strip ratio • Clear / Mine / Crush / Float / Tailings – simple separation process • Tar

  8. Slide 8: Pre-Feasibility Study Partners

    Slide 8: Pre-Feasibility Study Partners

    PRE-FEASIBILITY STUDY PARTNERS Ecology & Cultural Heritage - Biosis Environmental and Approvals - are expert consultants in the field of GHD are a longstanding Global Environmental, Ecology (fauna & flora) consultancy firm specialising in and Cultural Heritage Management Environmental Management thr

  9. Slide 9: Indicative Pathway to Production

    Slide 9: Indicative Pathway to Production

    INDICATIVE PATHWAY TO PRODUCTION 1Unicorn is not in production and there is no certainty that the pathway to production will occur

  10. Slide 10: Employment Opportunities

    Slide 10: Employment Opportunities

    EMPLOYMENT OPPORTUNITIES • Approximately 85 full time jobs when in operation  Trades, equipment & plant operators, supervisors and warehousing  Geology, mining, processing, metallurgy, surveying, accounting  Only essential employees onsite - other staff based in Corryong  Not fly in fly out - fu

  11. Slide 11: Environmental Effects Statement

    Slide 11: Environmental Effects Statement

    ENVIRONMENTAL EFFECTS STATEMENT • In Victoria, environmental assessment of the potential environmental impacts or effects of a proposed development may be required under the Environmental Effects Act 1978 • When a proposed project could potentially have significant environmental effects, a written r

  12. Slide 12: What Is Included in an EES?

    Slide 12: What Is Included in an EES?

    WHAT IS INCLUDED IN AN EES? • A description of the proposed development • An outline of public and stakeholder consultation • A description of the existing environment that may be affected • Predictions of significant environmental effects of the project • Proposed measures to avoid, minimise or man

  13. Slide 13: Studies Likely to Be Completed

    Slide 13: Studies Likely to Be Completed

    STUDIES LIKELY TO BE COMPLETED • Risk assessment • Cultural heritage • Soils and geochemistry • Air quality • Surface water, flooding and • Noise and vibration drainage • Visual • Biodiversity and habitat • Social and economic • Groundwater • Road, traffic and transport • Water use • Rehabilitation

  14. Slide 14: Community Involvement

    Slide 14: Community Involvement

    COMMUNITY INVOLVEMENT • Dart Mining is committed to involving the community in the EES process • Dart Mining will further develop their Consultation Plan to inform individuals and groups who could be affected and provide opportunities for input • Consultation will help Dart Mining to identify issues

  15. Slide 15: Ecological Assessment - Biosis

    Slide 15: Ecological Assessment - Biosis

    ECOLOGICAL ASSESSMENT - BIOSIS • Biosis Wangaratta office is managing the Ecological and Cultural Heritage aspects of the Prefeasibility Study for Dart Mining • Biosis provide expert consulting services in ecology and cultural heritage. They are industry leaders and have 30 years experience througho

  16. Slide 16: Key Legislation & Government Policy

    Slide 16: Key Legislation & Government Policy

    KEY LEGISLATION & GOVERNMENT POLICY • Commonwealth Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) • Victorian Flora and Fauna Guarantee Act 1988 (FFG Act) • Victorian Environmental Effects Act 1978 • Victorian Planning and Environment Act 1987 (including regulations for per

  17. Slide 17: Survey Aims and Methodology

    Slide 17: Survey Aims and Methodology

    SURVEY AIMS AND METHODOLOGY • Database searches to determine potential for listed species and communities • General field survey (collecting lists of species, assessing vegetation, habitat type and quality) • Map suitable habitat for listed flora species (survey during spring flowering season) Austr

  18. Slide 18: Field Survey Results - Fauna

    Slide 18: Field Survey Results - Fauna

    FIELD SURVEY RESULTS - FAUNA • Majority of fauna habitat types within the study area are common and widespread in the region (drier forests and woodlands) • Most of the fauna species detected during survey are common, and typical of the habitat types present • White-footed Dunnart was recorded (list

  19. Slide 19: Some Fauna Species Identified

    Slide 19: Some Fauna Species Identified

    SOME FAUNA SPECIES IDENTIFIED Black Feral Wallaby Cat DRILL RIG Long-nosed White- Bandicoot Winged Chough Eastern Superb Yellow Lyrebird Robin 19

  20. Slide 20: Field Survey Results - Flora

    Slide 20: Field Survey Results - Flora

    FIELD SURVEY RESULTS - FLORA • The majority of the vegetation types within the investigation area are common widespread, and have a conservation status of ‘least concern’ • The investigation area may contain two species listed under the EPBC and FFG Acts (Purple Eyebright and Austral Toad-flax). • T

  21. Slide 21: Ecological Assessment - Summary

    Slide 21: Ecological Assessment - Summary

    ECOLOGICAL ASSESSMENT - SUMMARY • Preliminary flora and fauna findings are being reviewed by the regulatory authorities • Further survey’s will be undertaken in spring • Cultural heritage studies will be undertaken in 2014 • Biosis will provide ongoing objective advice to ensure compliance with legi

  22. Slide 22: Tailings Storage Options

    Slide 22: Tailings Storage Options

    TAILINGS STORAGE OPTIONS • ATC Williams (specialist tailings engineers) retained to develop a tailings and water management solution for Unicorn • Five tailings storage options investigated  Teapot Creek - adjacent to Mt Unicorn  Bunroy Creek - located south-east of Mt Unicorn in a heavily foreste

  23. Slide 23: Tailings Site Selection Parameters

    Slide 23: Tailings Site Selection Parameters

    TAILINGS SITE SELECTION PARAMETERS • Potential to store life of mine tailings production (200Mt) • High storage efficiency - ratio of storage volume to wall height • Community, cultural heritage and societal considerations • Site vegetation and current land use • Tailings discharge and return water

  24. Slide 24: Tailings Storage Options

    Slide 24: Tailings Storage Options

    Mn zjR TAILINGS STORAGE OPTIONS

  25. Slide 25: Proposed Tailings Storage Site

    Slide 25: Proposed Tailings Storage Site

    PROPOSED TAILINGS STORAGE SITE 25

  26. Slide 26: Bull Paddock Creek - Preferred Site

    Slide 26: Bull Paddock Creek - Preferred Site

    BULL PADDOCK CREEK - PREFERRED SITE • Efficient site in terms of ratio of wall height to storage volume • Relatively isolated location with minimal visual impact • Low grade regrowth forest rather than prime agricultural land • No known cultural heritage constraints – detailed survey still to be com

  27. Slide 27: Bull Paddock Creek - Preferred Site

    Slide 27: Bull Paddock Creek - Preferred Site

    BULL PADDOCK CREEK - PREFERRED SITE • Tailings dam will block run off from Bull Paddock creek • It will be a NIL DISCHARGE Tailings dam ie no runoff from tailings into Thowgla creek • Investigating the viability of diverting part of the southern Bull Paddock creek catchment to maintain environmental

  28. Slide 28: Summary and Key Take Aways

    Slide 28: Summary and Key Take Aways

    SUMMARY AND KEY TAKE AWAYS • Unicorn deposit – potentially a long life Mo + Cu + Ag porphyry mine • Red Kite investing up to A$10M into Unicorn – detailed due diligence • Prefeasibility underway – fully funded, with cash at bank $6.2M1 • Approvals process has commenced – EES referral to be submitted

  29. Slide 29: Further Disclaimer

    Slide 29: Further Disclaimer

    FURTHER DISCLAIMER Economic Potential The Unicorn project remains at an early stage of planning and assessment and there are risks associated with the estimates of key parameters (including but not limited to further metallurgical test work to advance mineral processing design and the need to accura

  30. Slide 30: Competent Person Statement

    Slide 30: Competent Person Statement

    9 Competent Person Statement Information in this report that relates to a statement of Exploration Results and Mineral Resources of the Company is based on information compiled by Dean Turnbull B.App.Sc.(Geol) Hons. M. AIG. Mr Turnbull is a Director and full time employee of Dart Mining NL and has s