Dart Mining Nl · ASX:DTM
Dart Mining Nl — Investor Presentation (November 2025)
28 slides from Dart Mining Nl's investor presentation, Nov 10, 2025
Slide 1: Investor Presentation November 2025
For personal use only IN VE ST OR - 1 NOV 2025 INVESTOR PRESENTATION ASX: 1 DTM
Slide 2: Forward Looking Statements and Caution
IN VE INST VEOR - - ST OR 2 This presentation contains visual estimates of mineralisation, and the company would like to stress that visual estimates of mineralisation abundance contained in this announcement FORWARD LOOKING should never be considered a proxy or substitute for For personal use only
Slide 3: Corporate Profile: Board of Directors
IN VE INST VEOR - - ST OR 3 CORPORATE PROFILE Board of Directors For personal use only MR. JAMES CHIRNSIDE MR. DEAN TURNBULL MR. RICHARD UDOVENYA MR. TERRY BATES Executive Chairman - CEO Non Executive Director Non Executive Director, Lawyer Non Executive Director, Founder , Geologist James Chirnside
Slide 4: Dart Mining Team
IN VE ST OR - 4 DART MINING TEAM For personal use only MR. OWEN GREENBERGER MS. ANISSA DORMAN MR. ANDREW DAWES MR. ANTHONY SLEEMAN Head of Victorian Exploration CFO Head of Queensland Exploration Head of Drilling and Operations Owen Greenberger has 20 years of Anissa Dorman is a Chartered Andrew Daw
Slide 5: Capital Structure
IN VE ST OR - 5 CAPITAL STRUCTURE For personal use only ~$0.045 ~$1.70M SHARE PRI CE C ASH AS AT END 31 st OC TOBER ~$9.43M ~$7.73M MAR KET C API TALISATION EN TER PR ISE V ALU E 20 9,7 08, 623 18 5,4 61, 159 4, 031 ,72 0 S HA RE S ON I SS U E OP TI ONS ( in c . ES OP ) E SO P ( Ex c lu d in g D ir
Slide 6: Corporate Strategy
CORP ORA TE STR ATEGY For personal use only Dar t has be e n p urs ui ng a fo cu se d s tr ate gy o ve r the past 12 months: • Ob tain po s iti on s in advan ce d go ld , anti mon y , a nd c ri tic a l mi ne r a l pr oj e cts i n C e ntr a l Queensland with a view to early production to fun d f utur
Slide 7: Projected News-flow
IN VE ST OR - 7 Projected News-flow For personal use only 2025 2026 • Triumph Exploration Target declaration • Final IP survey interpretation from Coonambula • Additional deep drilling gold results from TRDD014 at • Granting of EL008161 from Rushworth Project Triumph • Additional drilling visuals an
Slide 8: Project Footprint
IN VE INST VEOR - - ST OR 8 PROJECT FOOTPRINT For personal use only TRIUMPH - GOLD COONAMBULA - GOLD / RUSHWORTH – GOLD / ANTIMONY ANTIMONY • ~50km South of Gladstone • 2000m of Diamond Drilling • ~45km East of Fosterville • Intrusive Related Gold and in progress – first results in • Fosterville sty
Slide 9: Queensland Projects
For personal use only DA RT MI NI NG NL QUEENSLAND PROJECTS 9
Slide 10: Queensland Projects Footprint
IN VE INST VEOR - - ST OR 1 0 QUEENSLAND PROJECTS FOOTPRINT For personal use only Regional Setting and Footprint • The region is known to host major intrusion related gold (IRG) systems, porphyry and epithermal style gold and copper-gold projects • Mt Rawdon ~2.8 Moz Au • Cracow ~3.0 Moz Au • Mount
Slide 11: Coonambula Antimony & Gold: Summary and Geology
1 IN VE INST VEOR - - ST OR 11 1 COONAMBULA ANTIMONY & GOLD PROJECT For personal use only Summary and Geology • Farm-in Agreement with Great Divide Mining (ASX: GDM) (1) • Earn in up to 51% • Highlights from 2014 drilling as per GDM Prospectus(2) • 3.0m @ 9.18% Sb in hole CNRC03 from 158m • 6.0m @ 5
Slide 12: Coonambula: Antimony Focus
1 IN VE INST VEOR - - ST OR 12 2 COONAMBULA ANTIMONY & GOLD PROJECT For personal use only Antimony Focus Long projection showing location of significance of drilling intersections Highlight Intercepts: • 7.0m @ 4.53% Sb • 3.0m @ 11.01% Sb • 5.0m @ 1.46% Sb ASX: DTM ASX: DTM
Slide 13: Coonambula: Drilling Results
1 IN VE INST VEOR - - ST OR 13 3 COONAMBULA ANTIMONY & GOLD PROJECT For personal use only Drilling Results • High grade Antimony results received across two zones from the first drill hole at Coonambula with more to come • CBADD001(1) • 5.0m @ 4.33% Sb + 1.69 g/t Au + 23.65 g/t Ag from 41.5m; • incl
Slide 14: Coonambula: Drilling Results
Drill core from CNDD003 from 131.65(2) 1 IN VE INST VEOR - - ST OR 14 4 COONAMBULA ANTIMONY & GOLD PROJECT For personal use only Drilling Results • Visual Antimony mineralisation intersected in additional two drill holes, so far • CBADD002(2) • 1.4m @ estimated 5% Stibnite from 134.5 • Including 0.3
Slide 15: Coonambula: Surface Sampling
1 IN VE INST VEOR - - ST OR 15 5 COONAMBULA ANTIMONY & GOLD PROJECT For personal use only Surface Sampling High grade Antimony, Gold, and Silver results received across 9 samples of float and in situ veins across the Historic Banshee Mine area including: • Antimony results up to 65.3% Sb (BSE01) and
Slide 16: Coonambula: IP Survey
1 IN VE INST VEOR - - ST OR 16 6 COONAMBULA ANTIMONY & GOLD PROJECT For personal use only IP Survey Preliminary results and interpretation from the CEI Funded IP Survey under way at the Coonambula have highlighted further Antimony prospectivity at the project. • The Banshee mineralised trend is bein
Slide 17: Coonambula: Gold Focus
1 IN VE INST VEOR - - ST OR 17 7 COONAMBULA ANTIMONY & GOLD PROJECT For personal use only Gold Focus Long projection showing location of significance of drilling intersections Highlight Intercepts: • 10.0m @ 1.01 g/t Au • 7.0m @ 1.66 g/t Au • 5.0m @ 1.28 g/t Au • 5.0m @ 1.56 g/t Au ASX: DTM ASX: DTM
Slide 18: Triumph Gold Project Mineral Resource Estimate
IN VE INST VEOR - - ST OR 1 8 TRIUMPH – MINERAL RESOURCE ESTIMATE TRIUMPH GOLD PROJECT (MRE) For personal use only Mineral Resource Estimate (MRE) • Over 90% of current inferred resource is hosted within 20% of mineralised strike length, and shallower than 100m from surface • Initial Metallurgical t
Slide 19: Triumph: Resource Drilling
1 IN VE INST VEOR - - ST OR 19 9 TRIUMPH GOLD PROJECT For personal use only Triumph – Resource Drilling • Long projection showing drilling intersections from the New Constitution loads highlighting locations of recent drilling intercepts • Drilling focused on key areas for developing understanding t
Slide 20: Triumph: Exploration Deep Drilling
2 IN VE INST VEOR - - ST OR 20 0 TRIUMPH GOLD PROJECT For personal use only Triumph - Exploration Deep Drilling Shallow resource drilling information allowed the projection of mineralisation at depth below existing resource 4 deep diamond drill holes have been drilled targeting mineralisation at dep
Slide 21: Triumph: Exploration Deep Drilling
2 IN VE INST VEOR - - ST OR 21 1 TRIUMPH GOLD PROJECT For personal use only Exploration Deep Drilling Long projection showing location of significance of drilling intersections to the south, and down plunge of the existing resource at Big Hans. Highlight Intercepts: • 10.8m @ 1.17 g/t Au • 4.4m @ 8.
Slide 22: Victorian Projects
For personal use only DA RT MI NI NG NL VICTORIAN PROJECTS 22
Slide 23: Tenement Consolidation and Divestment
IN VE ST OR - 2 3 TENEMENT CONSOLIDATION AND DIVESTMENT For personal use only Summary Tenement Consolidation • Intention of the company to reduce tenement holdings and focus activity across key Projects in Queensland. • The company is open to divestment or joint venture on any of the Victorian asset
Slide 24: Rushworth Tenement Application
2 IN VE INST VEOR - - ST OR 24 4 RUSHWORTH TENEMENT APPLICATION For personal use only Regional EL008161 application in progress, Dart Mining is the highest ranked of competing applications over the area. • EL008161 contains the extension of: • Rushworth Goldfield • Historic Whroo Goldfield • Contain
Slide 25: Rushworth Historic Goldfield
RUSHWORTH HISTORIC GOLDFIELD > Summary + 3,447 meters drilled across the project to date, averaging a direct drill cost of <$100 per metre. fo) w m7) 5 i c ro) Y © Q ro) Lo + Drilling activity currently operating at Phoenix Hill, beneath historic workings. + Targeting the Anticline and Syncline posi
Slide 26: 2025 Achievements
IN VE ST OR - 2 6 2025 Achievements For personal use only Triumph Project Coonambula Project • Completion of Triumph Purchase – Triumph is an • Farm-in Joint Venture agreement reached with Great intrusion related gold project with million-ounce Divide Mining over the Coonambula project, potential Qu
Slide 27: Contacts
IN VE ST OR - 27 CONTACTS For personal use only James Chirnside – Executive Chairman Dart Mining NL (ASX: DTM) jchirnside@dartmining.com.au +61 419 605 842 Ben Zervaas – Corporate Advisor Zerp Capital Pty Ltd ben@zerpcapital.com +61 407 211 959 ASX: DTM
Slide 28: Disclaimer
IN VE ST OR - 28 DISCLAIMER For personal use only The information contained in this presentation is for No representation or warranty, express or implied, is informational purposes only and does not constitute made as to the fairness, accuracy, completeness or an offer to issue, or arrange to issue,
Dart Mining NL — Investor Presentation (November 2025) on 6ix