  1. Slide 1: IMARC Conference Investor Presentation

    For personal use only IMARC Conference Investor Presentation INVESTOR PRESENTATION 21 October 2025 : IONR ASX : INR www.ioneer.com B Li 1

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared as a summary only and does not contain all information about ioneer Ltds Competent Persons Statement (ioneer or the Company) assets and liabilities, financial position and performance, profits and losses, prospects, and For personal use only In respect

  3. Slide 3: Boron – Key Facts

    Boron – Key Facts For personal use only • Commercially viable quantities found in very few places globally • Among the rarest ores on Earth • Southwest USA & Turkey account for ~80% of global production • Incredibly versatile, used in over 300 separate applications • Essential to modern life and cri

  4. Slide 4: From Termites to Tanks

    From Termites to Tanks Critical for Energy, Defense, Aerospace, Agriculture & Everyday Life Nuclear Aerospace & Defense Armor & Ballistics For personal use only Defense Missile & Aerospace Communications Systems Energy Semiconductor / Agriculture Glass & Chemicals Electronics 4 INVESTOR PRESENTATION

  5. Slide 5: Boron – A global business sourced from two countries

    Boron – A global business sourced from two countries • A 4Mt pa global business For personal use only • Boron mine in California produces ~30% of world supply (1Mt pa) • DoD consumed over 35kt of boron carbide for military applications in 2023 • ~73% boron reserves are found in Turkey Rhyolite Ridge

  6. Slide 6: Rhyolite Ridge – A Very Rare Lithium-Boron Deposit

    Rhyolite Ridge – A Very Rare Lithium-Boron Deposit For personal use only 1 Strong and resilient economics Lithium-Boron Project – NPV = $2.0B, IRR = 20.9% (levered) 2 260Mt Ore Reserve, 540Mt Mineral Resource, 3mtpa in Phase 1 operation 3 All-in sustaining cash cost of US$5,626 bottom quartile of gl

  7. Slide 7: Proposed Rhyolite Ridge Process Plant

    Proposed Rhyolite Ridge Process Plant Lithium and boron mined at Rhyolite Ridge will be processed into final products onsite For personal use only Sulphuric Acid Plant Evaporation / Ore Handling/ Sizing Crystallization and Storage Vat Leach Plant Sulphur Supply Lithium Carbonate Circuit Power Plant

  8. Slide 8: Rhyolite Ridge A Very Rare Lithium and Boron Deposit

    Rhyolite Ridge A Very Rare Lithium and Boron Deposit That will produce high-purity, refined chemicals in the U.S. For personal use only 8 INVESTOR PRESENTATION 21 October 2025 : IONR ASX : INR www.ioneer.com

  9. Slide 9: Key Takeaways

    Key Takeaways For personal use only A rare, long-life, permitted, shovel ready project in the U.S. with strong government support Unique Deposit Dual Revenue Shovel Ready Robust Expandable Economics A stable, secure, long-term supply of two products necessary for batteries, magnets, semiconductors a

  10. Slide 10: Questions

    Questions For personal use only Future U.S. Lithium & Boron Producer www.ioneer.com. ir@ioneer.com 10

  11. Slide 11: Corporate Snapshot

    Corporate Snapshot Capital Structure Research Coverage For personal use only (As at 20 Oct 2025) Shares Outstanding 2.7b Performance Rights And Options Outstanding 79.8m Cash Balance– 30 September 20251 US$21.8m Share Price ASX – 20 September 2025 A$0.21 ADR Price NASDAQ (1 ADR = 40 ASX Shares) US$5

  12. Slide 12: Proven & Experienced Team

    Proven & Experienced Team Experienced Board of Directors For personal use only JAMES D. CALAWAY BERNARD ROWE ALAN DAVIES ROSE McKINNEY-JAMES MARGARET WALKER TIM WOODALL Executive Chair Managing Director Non-executive Director Non-executive Director Non-executive Director Non-executive Director Forme

  13. Slide 13: South Basin Resource Estimate August 2025

    South Basin Resource Estimate August 2025 For personal use only Contained Tonnage Li B Li2CO3 H3BO3 Li2CO3 H3BO3 Stream Classification Ktonnes ppm ppm Wt. % Wt. % (kt) (kt) Measured 64,385 1,752 12,669 0.93 7.24 600 4,664 1 Indicated 87,372 1,551 11,280 0.83 6.45 721 5,636 Searlesite: High-boron lit

  14. Slide 14: South Basin Ore Reserve Estimate August 2025

    South Basin Ore Reserve Estimate August 2025 For personal use only Contained Tonnage Li B Li2CO3 H3BO3 Li2CO3 H3BO3 Stream Classification Ktonnes ppm ppm Wt. % Wt. % (kt) (kt) Proven 39,428 1,824 13,235 0.97 7.57 383 2,984 1 Probable 51,813 1,632 11,640 0.87 6.66 450 3,448 (>= 5,000 ppm B) Total S1