Ioneer Limited · ASX:INR

Ioneer — Investor Presentation (January 2026)

38 slides from Ioneer's investor presentation, Jan 30, 2026

  1. Slide 1: Equity Raising Presentation

    NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Equity Raising Presentation INVESTOR PRESENTATION January 2026 : IONR ASX : INR www.ioneer.com B Li 1

  2. Slide 2: Important Notices and Disclaimers

    Important Notices and Disclaimers NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES IMPORTANT: You must read the following before continuing. Competent Persons Statement This presentation has been prepared by ioneer Ltd (ABN 76 098 564 606) (and / or its subsidiaries, as the In respect of Mineral

  3. Slide 3: Important Notices and Disclaimers

    Important Notices and Disclaimers NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Such information and financial measures (including EBITDA) do not have a standardised meaning dependence on commodity prices, availability of funding, impact of inflation on costs, exploration risks prescribed by

  4. Slide 4: Important Notices and Disclaimers

    Important Notices and Disclaimers NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Reliance on third party information Joint Lead Managers and advisors The views expressed in this presentation contain information that has been derived from publicly Neither the Joint Lead Managers nor any of thei

  5. Slide 5: Important Notices and Disclaimers

    Important Notices and Disclaimers NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Swap Agreements In connection with the Placement, one or more investors may elect to acquire an economic interest in the New Shares (“Economic Interest”), instead of subscribing for or acquiring the legal or benef

  6. Slide 6: Calendar 2025 – continued project advancement and optimisation

    Calendar 2025 – continued project advancement and optimisation NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES In 2025 INR achieved several milestones that fundamentally de-risked the project and enhanced its strategic appeal Confirmed and improved robust project economics through completion of

  7. Slide 7: Calendar 2026 – advancing towards FID and development

    Calendar 2026 – advancing towards FID and development NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Ioneer represents direct exposure to the US onshoring thematic and is uniquely positioned as the most advanced critical minerals project in the US Strategic partnering process expected to compl

  8. Slide 8: Equity Raising Summary

    Equity Raising Summary 8

  9. Slide 9: Equity Raising Overview

    Equity Raising Overview NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Equity raising by virtue of a Placement • ioneer has undertaken a ~US$50.4 million1 (A$72 million) institutional placement to institutional, sophisticated and professional investors (“Placement”). Offer Structure • Approxim

  10. Slide 10: Sources and Uses of Funds

    Sources and Uses of Funds NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Equity raising of ~US$50.4m fully funds project activities through CY2026, including completion of a Strategic Partnering process through to Final Investment Decision ✓ Strategic asset in the US – Boron & Lithium on the U

  11. Slide 11: Equity Raising Timetable

    Equity Raising Timetable NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Event Date (2026)1 Trading halt lifted and announcement of completion of Placement Pre-market Friday, 30 January 2026 Settlement of New Shares issued under the Placement Thursday, 5 February 2026 Issue and commencement of

  12. Slide 12: Rhyolite Ridge Project Overview

    Rhyolite Ridge Project Overview 12

  13. Slide 13: Corporate Snapshot

    Corporate Snapshot NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Capital Structure Research Coverage (As at 28 January 2026) Shares Outstanding 2.7b Performance Rights And Options Outstanding 86.3m Cash Balance – 31 December 20251 US$17.9m Share Price ASX – 28 January 2026 A$0.21 ADR Price NA

  14. Slide 14: Proven & Experienced Team

    Proven & Experienced Team NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Experienced Board of Directors JAMES D. CALAWAY BERNARD ROWE ALAN DAVIES ROSE McKINNEY-JAMES MARGARET WALKER TIM WOODALL Executive Chair Managing Director Non-executive Director Non-executive Director Non-executive Direct

  15. Slide 15: Rhyolite Ridge – A Rare Lithium-Boron Deposit

    NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Rhyolite Ridge – A Rare Lithium-Boron Deposit 1 Strong and resilient economics Lithium-Boron Project – NPV = $2.3B, IRR = 23.2% (levered) 2 265Mt Ore Reserve (PP), 77 year mine life, 3.4mtpa in Phase 1 operation 3 All-in sustaining cash cost of US

  16. Slide 16: Strong and Resilient Project Economics

    Strong and Resilient Project Economics1 NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES 1 Years 1-25 Estimate Current LOM Estimate Avg. Annual LCE Production 24,500 tpa 20,400 tpa Avg. Annual Boric Acid Production 135,500 tpa 70,700 tpa Ore Processed 86.2 Mt 265.5 Mt Ore Processed TPA 3.4 Mt Or

  17. Slide 17: Ore Reserve Underpins Year Mine Life

    Ore Reserve Underpins 77 Year Mine Life NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES 2 Mine life of 77 years at 3.4 Mtpa Ore Reserve1 Contained Equivalent Tons (kt) Tonnage Li Grade B Grade (kt) (ppm) (ppm) Li2Co3 H3BO3 Proved 39,428 1,823 13,235 383 2,984 Total Stream 1 Probable 51,812 1,63

  18. Slide 18: Rhyolite Ridge Operating Costs – In the Bottom Quartile

    Rhyolite Ridge Operating Costs – In the Bottom Quartile NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES 3 LOM Production OPEX Rhyolite Ridge AISC OPEX2,3 Provides resilience through lithium commodity downturns 16% Mine Operating Costs Processing Facility Operating Costs 84% 4% Sulphur Supplies

  19. Slide 19: Substantially De-Risked Project

    Substantially De-Risked Project NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES 4 Shovel Offtakes Low-Cost Permitted Ready In Place Debt Final Federal permit 70% Engineering design Lithium & Boron offtake U.S DOE loan for $996 received in October 20241 complete Placed million2 • The BLM issued

  20. Slide 20: Expansion Potential

    Expansion Potential NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES 5 • Mineral Resource is limited to part of the South Basin as shown on the map • Further drilling in South and North Basins likely to result in increase to Mineral Resource Estimate • Multiple expansion options with potential t

  21. Slide 21: Status of Partnering Process

    Status of Partnering Process NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES 6 • Goldman Sachs assisting with the formal Strategic Partnering process • Partner(s) to help accelerate the development of Rhyolite Ridge • Interest across multiple sectors, lithium and boron, public and private • Pro

  22. Slide 22: Strong Recent Industry Engagement

    Strong Recent Industry Engagement NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES • US identify Critical Mineral priority as a key policy agenda – Boron and Lithium identified as key strategic minerals by Trump administration • United States – Australia Critical Minerals Framework signed - Stra

  23. Slide 23: Impact of Leach Optimization in 2025

    Impact of Leach Optimization in 2025 NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Driven by leach optimisation, new mine plan and increased production June 2025 August 2025 October 2025 3-day leach1 2-day leach2 1.5-day leach3 Avg. LOM Annual LCE Production 17,200 tpa 19,300 tpa 20,400 tpa A

  24. Slide 24: Key Takeaways

    Key Takeaways NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES A rare, long-life, permitted, shovel ready project in the U.S. with strong government support Unique Deposit Dual Revenue Shovel Ready Robust Expandable Economics A stable, secure, long-term supply of two products necessary for batte

  25. Slide 25: Appendix A: Supporting Materials

    Appendix A: Supporting Materials 25

  26. Slide 26: Proposed Rhyolite Ridge Process Plant

    Proposed Rhyolite Ridge Process Plant NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Lithium and boron mined at Rhyolite Ridge will be processed into final products onsite Sulphuric Acid Plant Evaporation / Ore Handling/ Sizing Crystallization and Storage Vat Leach Plant Sulphur Supply Lithium

  27. Slide 27: Commitment to Sustainability

    NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES • Majority of on-site power from CO2- free energy production, low Low Emissions greenhouse gas emissions. • Mobile equipment meets Tier 4 EPA standards • Project design implements best-in- class water utilization while recycling Low Water Usage th

  28. Slide 28: South Basin Resource Estimate October 2025

    South Basin Resource Estimate October 2025 NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Contained Tonnage Li B Li2CO3 H3BO3 Li2CO3 H3BO3 Stream Classification Ktonnes ppm ppm Wt. % Wt. % (kt) (kt) Measured 64,385 1,752 12,669 0.93 7.24 600 4,664 1 Indicated 87,372 1,551 11,280 0.83 6.45 721

  29. Slide 29: South Basin Ore Reserve Estimate October 2025

    South Basin Ore Reserve Estimate October 2025 NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Contained Tonnage Li B Li2CO3 H3BO3 Li2CO3 H3BO3 Stream Classification Ktonnes ppm ppm Wt. % Wt. % (kt) (kt) Proven 39,428 1,823 13,235 0.97 7.57 383 2,984 1 Probable 51,812 1,632 11,640 0.87 6.66 450

  30. Slide 30: Appendix B: Key Risks

    Appendix B: Key Risks 30

  31. Slide 31: Key Risks

    Key Risks NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES There are a number of factors, specific to the Company and of a general nature, which may affect the If they were to eventuate, these risks and uncertainties could result in the Company not achieving its future operating and financial pe

  32. Slide 32: Key Risks

    Key Risks NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Higher than expected inflation rates generally, or specific to the mining industry in particular, could be • The Company prepares updated cost estimates and projected economics to support the expected to increase development and operatin

  33. Slide 33: Key Risks

    Key Risks NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Reserves and Resources The Company does not hedge its commodity price exposure. Commodity price fluctuations, as well as increased production and capital costs, may render the Company’s Ore Reserves unprofitable for periods On 29 October

  34. Slide 34: Key Risks

    Key Risks NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES The Development Agreement is divided into 3 phrases to coincide with the Project's planned The entities established to undertake the Project will similarly be subject to taxation and other import construction and operations schedule and

  35. Slide 35: Key Risks

    Key Risks NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES The factors which affect the price for refined lithium materials and boric acid (many of which are outside The qualification process may require approval from multiple parties in the supply chain and not just the control of the Company a

  36. Slide 36: Key Risks

    Key Risks NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES The operations of the Company and the Project are subject to various laws and plans including those The total population in the area is sparse with an older demographic and approximately 9,000 residents relating to mining, prospecting, d

  37. Slide 37: Key Risks

    Key Risks NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES Litigation and disputes can be costly, including amounts payable in respect of judgments and The Company does not engage in any hedging or derivative transactions to manage interest rate risk. Any settlements made against, or agreed to b

  38. Slide 38: ir@ioneer.com

    www.ioneer.com. ir@ioneer.com 38