Endeavour Silver Corp. · TSX:EDR

Endeavour Silver — Investor Presentation (February 2026)

28 slides from Endeavour Silver's investor presentation, February 2026

  1. Slide 1: Growth on the Horizon

    Growth on the Horizon C O R P O R AT E P R E S E N TAT I O N F E B R U AR Y 2 0 2 6 TSX: EDR | NYSE: EXK edrsilver.com

  2. Slide 2: Cautionary Note

    Cautionary Note This presentation contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within applicable Canadian securities legislation. Such forward-looking statements and information herein

  3. Slide 3: Non-IFRS Financial Measures

    Non-IFRS Financial Measures The Company has included certain performance measures that are not defined under International Financial Reporting Standards (IFRS). The Company believes that these measures, in addition to conventional measures prepared in accordance with IFRS, provide investors an impro

  4. Slide 4: Investor Highlights

    Investor Highlights Mid-tier Silver Operating Mexico’s Significant Leading Silver Strategically Producer Newest Silver Mine Organic Growth Leverage Acquiring Key Assets Two underground silver gold mines Terronera commercial production Leading organic growth profile in A leader in silver price beta,

  5. Slide 5: Core Assets and Outlook

    Core Assets and Outlook ABOUT ENDEAVOUR SILVER Parral Endeavour Silver is a mid-tier silver producer with mining operations in Chihuahua Exploration Mexico and Peru. In addition to its operational mines, the Company Guanaceví Operation maintains a diverse portfolio of exploration projects across Mex

  6. Slide 6: 2026 Production & Cost Guidance

    2026 Production & Cost Guidance(2) Sustaining Silver Gold Lead Zinc Copper Silver Eq Cash Costs AISC Operation Capital (Moz) (Koz) (K t) (K t) (T) (Moz)(1) ($/oz)(3) ($/oz)(3) ($M) Guanacevi 3.6 – 3.8 11.0 – 12.0 - - - 4.6 – 4.9 $21.00 - $22.00 $29.00 - $30.00 $24.5 Kolpa 2.3 – 2.5 - 22.0 – 24.0 16.

  7. Slide 7: Silver Miners Trade at Higher Multiples Compared to Gold

    Silver Miners Trade at Higher Multiples Compared to Gold Few Pure Silver Producers Endeavour Silver is one of the few silver • Silver mining shares trade at a premium to gold mining shares due to the investment vehicles with over 50% revenue scarcity of primary silver mining companies from silver •

  8. Slide 8: Recent Developments

    Recent Developments Addition of Kolpa and Terronera Fuel Momentum in 2025 Production 2025 Production: 11.2 million oz AgEq (1) • Consolidated 2025 production was 6,486,661 ounces (oz) Ag and 37,164 oz Au Terronera for a total of 11.2 Moz AgEq(1) Bolañitos 16% 9% Terronera Announces Commercial Produc

  9. Slide 9: Terronera Mine, Jalisco

    Terronera Mine, Jalisco OPERATING MINE Reserve, Metals Mix 60% Ag 40% Au +10 YRS 2,000 Proposed Life of Mine Tonnes per day Endeavour’s newest mine 2 • Terronera Defined mineralization areas • La Luz Probable Reserves(1) • 7.4 million tonnes at 374 g/t AgEq containing 88.8 million AgEq oz 1. Full de

  10. Slide 10: Terronera: Officially Part of Endeavour's Production Profile

    Terronera: Officially Part of Endeavour’s Production Profile Operating Trends Commercial Production commenced on October 1, 2025 • While ramping up to full capacity, steady output was maintained with no significant downtime and average recoveries of 82.6% Ag and 72.5% Au Q4 2025 Q3 2025 Tonnes Proce

  11. Slide 11: Terronera: Exploration Opportunities

    Terronera: Exploration Opportunities TERRONERA PROJECT SURFACE VIEW TERRONERA VEIN • Endeavour controls 25 concessions totaling 20k hectares • The Terronera vein holds over 90% of the defined reserve • +50 mines on +50 known veins • Inferred envelope is open along strike and at depth • Thick vein wi

  12. Slide 12: Terronera: Catalysts

    Terronera: Catalysts Next Steps for the Newly Producing Mine • Forecast throughput of approx. 360,000 tonnes over next six months averaging 122 g/t Ag and 2.52 g/t Au • During H1 2026, mine production will be from areas of the deposit with lower grades including stockwork, with mine development acce

  13. Slide 13: Kolpa Mine, Peru

    Kolpa Mine, Peru OPERATING MINE Metals Mix 40% Ag 60% Pb, Zn, Cu 2016-2024 Production 11.1M 119.9 91.7 4.6 oz Ag kt Pb kt Zn kt Cu 2025 Production (May 1 – December 31, 2025) 1.6M 14.9 9.0 0.3 oz Ag kt Pb kt Zn kt Cu (3.4 Moz AgEg) 1. Full details in the appendix, under Reserves and Resources TSX: E

  14. Slide 14: Endeavour's First Mine in Peru

    Strategic Acquisition of Endeavour’s First Mine in Peru Consistent with plan Track record Leveraging Exploration Active mining to become senior of production Endeavour’s upside district silver producer growth technical strengths Providing a platform for Fully funded operating silver Kolpa began as s

  15. Slide 15: Kolpa: Integration Progressing Smoothly

    Kolpa: Integration Progressing Smoothly Advancing Operational Alignment Q3 2025 Direct Costs Per Tonne • Kolpa acquisition closed on May 1, 2025 • In Q4 2025, the site commissioned a new crushing circuit and commenced installation of a new ball mill to be completed in Q1 2026 19% 14% processing cost

  16. Slide 16: Kolpa: Overview

    Kolpa: Overview(1) Location • Huachocolpa District, Huancavelica, Peru • 490 km SE of Lima • Avg elevation: 4,400 metres above sea level Land Package • 144 mining rights covering 25,177 ha of effective area and one beneficiation concession covering 366 ha Geology • Silver polymetallic mineralization

  17. Slide 17: Kolpa: Mining Concessions

    Kolpa: Mining Concessions Total: 145 Rights (25,786 Ha) • Kolpa holds mining rights to 120 mining concessions covering 23,741 ha, and one beneficiation concession covering 366 ha. 63 of those mining claims comprise the Administrative Economic Unit (UEA) Huachocolpa Uno • Includes 23 mining concessio

  18. Slide 18: Pitarrilla Project, Durango

    Pitarrilla Project, Durango EXPLORATION ADVANCED Resource Metals Mix 60% Ag 40% Pb, Zn 2022 $140M Acquired from SSR Mining SSR invested to advance the project since 2002 +225,000 600 Moz Ag metres in drilling Defined by NI 43-101 Silver dominant project with extensive historical database and compreh

  19. Slide 19: Pitarrilla: One of the World's Largest Undeveloped Silver Projects

    Pitarrilla: One of the World’s Largest Undeveloped Silver Projects Organic Growth Potential Enhances Organic Growth Excellent Infrastructure in Supported By Large Resource Profile Place • Complimentary to regional existing • Road access platform in Mexico • Connected to power grid and water • Provid

  20. Slide 20: Pitarrilla: Exploration Supports Underground Mining Potential

    Pitarrilla: Exploration Supports Underground Mining Potential Pitarrilla Cross Section Pitarrilla Plan View • Underground exploration ramp extended over 1.3km, lying directly • Confirmed management’s geological interpretation and identified at least above the manto four structures extending through

  21. Slide 21: Pitarrilla: Summary of Historically Contemplated Operations

    Pitarrilla: Summary of Historically Contemplated Operations Endeavour Silver is evaluating the business case for 2009 PFS(1,3) Modelled on an Ag 4 an underground mine, focused on the high-grade core Key LOM Metrics Underground Mine of the deposit Average Head Grade (gpt) • 4,000 tpd mining operation

  22. Slide 22: Pitarrilla: Opportunity & History of the Project

    Pitarrilla: Opportunity & History of the Project Focus pivots to expanding resources with evaluation of open-pit SSR shifts focus of the project to reducing concepts following surge in silver price initial capex and maximizing returns Sep. 2009 Pre-feasibility study Dec. 2012 Feasibility study 2018

  23. Slide 23: Guanaceví Mine, Durango

    Guanaceví Mine, Durango OPERATING MINE Metals Mix 80% Ag 20% Au 2005-2024 Production 2025 Production 61.4M 149k 3.9M 13.7k oz Ag oz Au oz Ag oz Au Reserves(1) • Proven – 0.2 million tonnes at 506 g/t AgEq containing 3.3 million AgEq oz. • Probable – 0.3 million tonnes at 414 g/t AgEq containing 3.4

  24. Slide 24: Guanaceví: Maintaining Steady Production

    Guanaceví: Maintaining Steady Production AgEq Quarterly Production (Oz)(1) Q4 2025 Production Throughput and Grades in Line With Plan 1,334,447 1,282,853 1,279,860 Silver production slightly lower than Supplies of local third-party feed 1,117,703 928,557 planned range with gold production continued

  25. Slide 25: Guanaceví: Delivering High Grade Drill Results

    Guanaceví: Delivering High Grade Drill Results Prolific Area Continuity To The East Potential Situated along prolific Santa Cruz vein Intersecting excellent results with Connecting El Curso to One continuous orebody - comparable to 15 km long, producing in area since step-out holes from the margins

  26. Slide 26: Shareholder Information

    Shareholder Information 52% Capital Structure Retail $3.2B 294.2M issued/outstanding Market Cap 3.9M potentially dilutive shares 298.1M total diluted shares $10.78 $15.15/$2.95 48% Institutional *As of November 6, 2025 NYSE share price NYSE 52-week high/low February 2, 2026 $57M Top Shareholders Ana

  27. Slide 27: Sector Leading Organic Growth Strategy

    Sector Leading Organic Growth Strategy OPERATIONS ADVANCED EXPLORATION GREENFIELDS Guanaceví Terronera (Oct 1-Dec 31, 2025) Pitarrilla Bruner 3.9M oz Ag 0.4M oz Ag One of largest known undeveloped 8.1k oz Au silver projects globally Gold project in Nevada 13.7k oz Au (5.0 Moz AgEq) (1.0 Moz AgEq) Ko

  28. Slide 28: Allison Pettit, Vice President, Investor Relations

    @edrsilvercorp @EDRSilverCorp Endeavour Silver Corp. @EDRSilverCorp Endeavour Silver Corp. Allison Pettit Endeavour Silver TF: 1 877 685 9775 Vice President, Investor Relations Suite 1130-609 Granville Street P: 604 685 9775 apettit@edrsilver.com Vancouver, BC info@edrsilver.com Canada V7Y 1G5 TSX:

Endeavour Silver — Investor Presentation (February 2026) on 6ix