Maple Gold Mines Ltd · TSXV:MGM

Maple Gold Mines — Investor Presentation (May 2022)

24 slides from Maple Gold Mines's investor presentation, May 2022

  1. Slide 1: Corporate Presentation May 2022

    CORPORATE PRESENTATION MAY 2022

  2. Slide 2: Disclaimer

    DISCLAIMER Cautionary Notes Regarding Forward-Looking Statements This Corporate Presentation (“Presentation”) includes “forward-looking information” and “forward-looking statements” (collectively referred to as “forward-looking statements”) within the meaning of applicable Canadian securities legisl

  3. Slide 3: Finding Gold in the Shadow of Headframes

    FINDING GOLD IN THE SHADOW OF HEADFRAMES Blueprint for Maple Gold’s success: 1. LOCATION, LOCATION, LOCATION  2. ESTABLISHED AND GROWING RESOURCE  3. HIGH-GRADE PAST-PRODUCING MINE  4. CAPITAL TO EXECUTE  5. EXPERIENCED TEAM / STRATEGIC PARTNER  MAPLE GOLD MINES is a well-capitalized gold explo

  4. Slide 4: The Canadian Hub for Gold Mining

    THE CANADIAN HUB FOR GOLD MINING The Abitibi gold belt stretches from Wawa, Ontario to Chibougamau, Quebec – two of Canada’s top mining jurisdictions and a hotbed for M&A activity The region has produced over C$26B in M&A activity since 2013 Highlighted by 2022’s C$13.5B merger between: MAPLE GOLD “

  5. Slide 5: Strategically Located Land Position

    STRATEGICALLY LOCATED LAND POSITION  Blue ellipses highlight key synergies between Agnico and Kirkland Lake assets/operations  Gold ellipse is Maple Gold’s Douay-Joutel- Eagle 400 km² property package  Established and growing 3.03 Moz gold resource at Douay (50/50)  High-grade historic gold mine

  6. Slide 6: District-Scale Mineralization Footprint

    DISTRICT-SCALE MINERALIZATION FOOTPRINT  Similar mineralization footprint to the two largest mines in the Abitibi  Douay remains underexplored vs. Canadian Malartic and Detour Lake  55km of strike along the Casa Berardi Deformation Zone  Significant exploration upside Disclaimer: Mineralization

  7. Slide 7: Strong Partnership with Agnico Eagle

    STRONG PARTNERSHIP WITH AGNICO EAGLE  CANADA’S LEADING GOLD PRODUCER & 3rd LARGEST GOLD PRODUCER WORLDWIDE.  Takes extremely conservative and measured approach to investments and asset acquisition.  50-50 JV Agreement signed February 2021: Agnico funding C$18.25M in exploration over 4 years (2021

  8. Slide 8: Exceptional Infrastructure Access

    EXCEPTIONAL INFRASTRUCTURE ACCESS  2.5-hour drive north of Val d’Or, Quebec along paved 2-lane provincial highway (Hwy #109), which runs through the property  Next to 1 of 6 major power lines in the province  55 km SW of Matagami with skilled labour, local airport and rail access  Douay covers ~

  9. Slide 9: Douay Gold Project – Overview

    DOUAY GOLD PROJECT – OVERVIEW DOUAY GOLD PROJECT (50%) One of the Largest Undeveloped Gold Resources in Quebec Indicated: 10.0 Mt @ 1.59 g/t Au for 511 Koz Au Inferred: 76.7 Mt @ 1.02 g/t Au for 2.53 Moz Au Major resource expansion and new discovery potential across 357 km2 property package - virtua

  10. Slide 10: Douay 2022 Mineral Resource Estimate

    DOUAY 2022 MINERAL RESOURCE ESTIMATE Pit-Constrained & Underground Mineral Resource Estimate (SLR 2022)  21% increase in OP Indicated Resource to 511,000 oz at an average grade of 1.59 g/t Au Tonnes Grade Contained Metal Resource Category (Mt) (g/t Au) (000 oz Au)  Slight increase in OP Inferred R

  11. Slide 11: Conceptual Open Pit Mine Plan

    CONCEPTUAL OPEN PIT MINE PLAN  Targeted infill drilling 531 Zone Maiden Indicated Resource: demonstrates the potential for 58,000 oz @ 2.85 g/t Au future resource conversion and continues to de-risk the Douay deposit Nika Zone Maiden Indicated Resource: 30,000 oz @ 1.13 g/t Au  ~7,000 m of additio

  12. Slide 12: Winter 2022 JV Drilling at Douay

    WINTER 2022 JV DRILLING AT DOUAY PAGE 12

  13. Slide 13: Expansion Potential at Depth

    EXPANSION POTENTIAL AT DEPTH The Douay-Joutel JV is based on the Canadian Malartic JV Partnership Canadian Malartic is now Canada’s largest gold mine 1.9 Moz 6.4 Moz NW-SE vertical longitudinal section (all zones) showing distribution of below-pit-shell underground blocks >1.15 g/t Au cut-off. Other

  14. Slide 14: Agnico Eagle's 1st Gold Mine: Joutel Mine Complex (1974-1993)

    AGNICO EAGLE’S 1ST GOLD MINE: JOUTEL MINE COMPLEX (1974-1993) Joutel Mine Site Entrance Telbel Headframe Eagle Mine Mill Complex Note: Historical photos. All surface infrastructure has been reclaimed. PAGE 14

  15. Slide 15: History of the Joutel Mine Complex

    HISTORY OF THE JOUTEL MINE COMPLEX USD Gold Price Chart with Key Events MGM commences Phase I $2,250 drill program at Eagle MGM-AEM complete 50/50 JV on Douay/Joutel Gold Projects $2,000 Globex drills 12.4 m @ 2.9 g/t Au, including 4.8 m @ 5.4 ??? g/t Au (EM-14-001) at Eagle $1,750 $1,500 AEM drills

  16. Slide 16: Joutel/Eagle: A Historic Mine Trend with High-Grade Upside

    JOUTEL/EAGLE: A HISTORIC MINE TREND WITH HIGH-GRADE UPSIDE Former Eagle Mine Operation JOUTEL PROJECT JOUTEL (50%), GOLD EAGLE PROJECT PROJECT (50%) (100%) Hosts Agnico’s former Joutel Mining Complex Past production of 6.2 Mt at 6.5 g/t Au for total of 1.1 Moz gold* Mined from 1974 to 1993 (closed w

  17. Slide 17: Targeting High-Grade Mineralization at Eagle

    TARGETING HIGH-GRADE MINERALIZATION AT EAGLE Former Eagle Mine Operation  Oblique view of modeled mine trend at Eagle  Blue pierce points correspond to completed drill holes from the Phase I drill program  Target pierce points for Phase II (underway) also shown (black)  Maple Gold is planning th

  18. Slide 18: Eagle-Telbel Long Section Shows Significant Drilling Gaps

    EAGLE-TELBEL LONG SECTION SHOWS SIGNIFICANT DRILLING GAPS A High-Grade Restart Opportunity with Excellent Near-Mine Expansion Potential PAGE 18

  19. Slide 19: The Maple Gold Value Stack

    THE MAPLE GOLD VALUE STACK  C$21.9M IN CASH (AS OF DECEMBER 31, 2021)  C$21M IN POTENTIAL WARRANT PROCEEDS  C$14M IN REMAINING JOINT VENTURE FUNDING FROM AGNICO EAGLE (2022-2024) C$87M  C$40M IN BUY BACK PROVISIONS TIED TO MAPLE GOLD’S 2% NSR AT DOUAY  C$150M IN DRILLING REPLACEMENT COSTS (250,

  20. Slide 20: Capital Structure, Financial Position and Ownership

    CAPITAL STRUCTURE, FINANCIAL POSITION AND OWNERSHIP As of May 3, 2022 Share Ownership Mix Shares Outstanding 335.4M 2.7% Warrants (~45% Agnico)1 56.9M 12.1% Options2 25.9M Management/Insiders/Closely Related Fully Diluted3 424.7M 44.2% Agnico Eagle Mines 52-week high/low share price $0.49-$0.24 Mark

  21. Slide 21: Recent Milestones & Upcoming Catalysts

    RECENT MILESTONES & UPCOMING CATALYSTS MGM Px/Vol $0.60 12.0 1 Signed Definitive JV Agreement with Agnico Eagle  2 Initial JV drill program returned 3 of top 5 intercepts $0.50 10.0 ever reported at Douay  $0.40 8.0 3 Acquired 100% Option on Eagle Mine Property  3 Major digitization and 3D mod

  22. Slide 22: Key Management/Board/Advisors

    KEY MANAGEMENT/BOARD/ADVISORS $15B Matthew Hornor President & CEO Joness Lang Executive VP Kiran Patankar SVP Growth Strategy Fred Speidel VP Exploration $30B $5B $30B Michelle Roth Gérald Riverin Maurice Tagami David Broughton Chairperson/Director Director/Tech Advisor Director/Tech Advisor Technic

  23. Slide 23: Success Factors Driving Future Value Creation

    SUCCESS FACTORS DRIVING FUTURE VALUE CREATION Established/Growing Gold Led by experienced mining, Strong Strategic and Located in Quebec’s Prolific Strategic & JV Partnership Robust Balance Sheet Resource and High-Grade exploration, and capital Institutional Shareholders Abitibi Greenstone Belt with

  24. Slide 24: Contact Information

    CONTACT INFORMATION SUITE 600 1111 WEST HASTINGS STREET VANCOUVER, BC V6E 2J3 CANADA PHONE: +1 (647) 265.8688 EMAIL: INFO@MAPLEGOLDMINES.COM Douay headframe at night – October 2021

Maple Gold Mines — Investor Presentation (May 2022) on 6ix