Melkior Resources Inc. · TSXV:MKR
Melkior Resources — Investor Presentation (April 2025)
22 slides from Melkior Resources's investor presentation, Apr 1, 2025
Slide 1: Take Part in Discovery
Take Part in Discovery Q2 2025
Slide 2: Forward Looking Statements
FORWARD LOOKING STATEMENTS This presentation contains certain statements that may be deemed “forward-looking statements”. All statements, other than statements of historical fact, that address events or developments that Melkior Resources Inc. expects to occur, are forward-looking statements. Forwar
Slide 3: Company Overview
No COMPANY OVERVIEW Melkior Resources is a Canadian exploration company focused on unlocking value by advancing its portfolio of high quality projects located in gold-rich areas of Canada. The Company’s flagship assets include: Beschefer East, Carscallen, and Genex. 100% OWNERSHIP OF TIGHT CAPITAL P
Slide 4: Capital Structure
CAPITAL STRUCTURE Share Price (April 1 st) C$0.09 Institutions, 9% Corporations (Private), 1% 52 Week High /Low C$0.15 / C$0.07 Individuals/Insiders, 7% Shares Outstanding 34.8M Warrants 1.6M @ 0.24 Avg Options 1.35M @ 0.58 Avg Public and Other, 83% Fully Diluted 37.8M Market Cap (Basic) C$3.0M Inst
Slide 5: The Carscallen Project
THE CARSCALLEN PROJECT Timmins, Ontario
Slide 6: Carscallen Project
CARSCALLEN PROJECT ❑ Location: The Carscallen Gold Project is located in the Abitibi Greenstone belt, 3 kms due north of the Porcupine Destor Fault Zone, one of Canada's richest gold camps having produced over 70 Moz of gold historically. ❑ The Right Neighbors: The project shares approximately 9 km
Slide 7: Drilling at Carscallen: VG Highlights Potential
DRILLING AT CARSCALLEN: VG Highlights Potential Long section highlighting the recent drilling intercepts from holes Core photo of Hole MKR-24-002 highlighting high-grade gold intercepts MKR-24-001, MKR-24-002, and MKR-24-003 relative to historical from 208.5 to 215.4 m at 77.4 g/t Au including 1.2 m
Slide 8: Carscallen Project Target Summary
CARSCALLEN PROJECT TARGET SUMMARY ❑ The land package: 320 claim units, covering over 47 square kms. ❑ Previous work: Drilling in 2020-2022 validated the high-grade gold system and extensions in addition to VMS potential. ❑ The ZamZam Prospect: gold bearing zone has been traced on surface for a lengt
Slide 9: Historical Intercepts
HISTORICAL INTERCEPTS Hole ID From To Width Au g/t Metal Factor CAR-19-03A 426 434 8 23.5 188 CAR-80-2012 533 536.7 3.7 51.9 192 CAR-20-05 357 363 6 25.7 154 CAR-94-2013 126.95 127.55 0.6 140.5 84 CAR-71-2011 254 267.25 13.25 5.1 68 CAR-45-2010 181.55 184.5 2.95 21.42 63 CAR-61-2010 272 285.3 13.3 4
Slide 10: Drill Intercepts and Blue-Sky Potential
DRILL INTERCEPTS AND BLUE-SKY POTENTIAL A A’ WW W. M E L K I O R . C O M T SXV:MKR
Slide 11: Gold Isograd with IP Inversion Model Section
A A B Gold Isograd (>0,50 gpt) with IP Inversion Model Section Looking Southeast) B
Slide 12: The Beschefer East Project
THE BESCHEFER EAST PROJECT Detour, Quebec
Slide 13: Beschefer East Project
BESCHEFER EAST PROJECT ❑ Location: ❑ Contiguous claims (7,180 acres) in the Detour Gold Camp, located 14km east and 45 km north of BHP's (C$156B market cap) Selbaie (53 Mt @ 1% Cu, 2.0% Zn, 0.6 g/t Au and 41 g/t Ag) and Hecla Mining's (C$5.0B market cap) Casa Berardi Mines (2P Reserve of 2.5 g/t for
Slide 14: Beschefer East – Results
BESCHEFER EAST – Results ❑ Power Line Target Results: The Power Line Target is located at the northern part of the property. Highlight results include: ❑ Intervals of 2 to 5 g/t over lengths of 0.5 to 6 meters within a 70-meter interval (Hole 1172-99-30). ❑ Intercepted 2.1 g/t over 5.4 meters, inclu
Slide 15: Beschefer East – Option Terms
BESCHEFER EAST – Option Terms % Ownership Date Cash Shares Work Expenditures Status Upon execution of the Definitive Agreement $50,000 50,000 N/A Paid First Anniversary $0 100,000 $375,000 Paid 100% Option Second Anniversary $0 150,000 $750,000 N/A Third Anniversary $0 200,000 $1,500,000 N/A Note 1:
Slide 16: The Genex Project
THE GENEX PROJECT Timmins, Ontario
Slide 17: Genex Project
GENEX PROJECT ❑ Land Package: Contiguous claims (4,000 acres) in the West Timmins Gold Camp, 20 km west of Timmins ❑ Size and scale: Potential for delineating a polymetallic open- pitable resource while targeting a massive sulphide source and gold enrichment trends ❑ Genex highlighted intersections:
Slide 18: Genex Project – 3D Model
GENEX PROJECT – 3D Model ❑ First DDH compilation and 3D model: ❑ gold and base metal grade distribution is modelled (Leapfrog) to a vertical depth of 300 metres, 300 metres down dip and 500 metres along strike. ❑ Mineralized intervals at the limit of the model result in the Genex Zone being open in
Slide 19: Genex Project – 2023 Drill Program
GENEX PROJECT – 2023 Drill Program ❑ Summary: ❑ The Company announced final results from a 4,194-meter drill program at the Genex Project in Timmins, Ontario, during the summer of 2023. ❑ Results: ❑ GEN-22-24 intersected 0.75% Cu and 12.1 g/t Ag over 8.5m and GEN-22-25 hit over 1.24% Zn over 14.0m,
Slide 20: Genex Project – Option Terms
GENEX PROJECT – Option Terms % Ownership Date Cash Shares Work Expenditures Credits Status $500,000 in assessment credits from Melkior's Carscallen 20 days from the Effective Date $50,000 500,000 N/A Project Complete First Anniversary $50,000 500,000 $750,000 N/A Complete First Option: 50% IEP is pe
Slide 21: Management & Directors
MANAGEMENT & DIRECTORS Jon Deluce, CPA, CA Norman Farrell Director CEO and Director Founder and first president of Melkior Resources Inc, then Messeguay Mines Inc, Mr. Deluce obtained his CPA/CA while working at Ernst & Young in the Assurance practice. from 1987 to 1993 he sat on the board of numero
Slide 22: Take Part in Discovery
ME Det Take Part in Discovery Gywww.MmeELKiorR.com
Melkior Resources — Investor Presentation (April 2025) on 6ix