Slide 3: Positioned for Growth in Zinc & Base Metals
Resources Limited Positioned for Growth in Zinc & Base Metals Experienced Pasinex Team & Board Strong Turkish JV Partner Akmetal AS Focus on historic Zinc belt in South-East Turkey (Adana) Pipeline of High Grade projects near historic Horzum Zinc Mine (4,2 Mt @ 30% Zn) • Pinargozou (Starter

Slide 4: Senior Management – Strength in Mining
Resources Limited Senior Management – Strength in Mining Steve Williams – President and CEO • Metallurgy degree and MBA • Mines in Australia and Canada • 20 years with SGS in Metallurgy • Managing Director SGS Canada Clinton Smyth – VP – Exploration • Geology / Geochemistry degree • Exploration

Slide 5: Board of Directors
Resources Limited Board of Directors Steve Williams – President, CEO and Chairman Sven Olsson – 15 years in capital raising for juniour exploration Dave Hodge – Entrepreneur and 25 years in capital raising for junior exploration Paul Chow – Capital investment in oil and gas and mining for 15

Slide 6: Strategic Joint Venture – Akmetal AS
Resources Limited Strategic Joint Venture – Akmetal AS Akmetal AS – large producer of chromite in Turkey and interests in an operating gold and base metal mines in Turkey (through another JV) Part of the large privately owned Kurmel Group • interests in dairy, agriculture, mining, textiles, tour

Slide 7: Pasinex projects in Turkey – Zinc Focus at Horzum
Resources Limited Pasinex projects in Turkey – Zinc Focus at Horzum • Large zinc district potential • Turkey is very under-explored particularly for base metals •Infrastructure is very strong in Turkey •Access to major roads, port (Mersin), major airport (Adana), HV electrical September 2014 7

Slide 8: Horzum JV Location
Resources Limited Horzum JV Location • Horzum zinc district – carbonate replacement zinc • Mineralisation on strike with major fault September 2014 8

Slide 9: Horzum Regional Zn Project, Adana
Resources Limited Horzum Regional Zn Project, Adana Held by Horzum JV ( 50 / 50 Pasinex and Akmetal) • A regional economic Zn project Carbonate Replacement type (CRD) Zn deposits Historic Zinc mining • Akmetal’s Horzum mine - 4.2M tonnes 30% Zn (oxide) from 1974 – 1996 • Small scale mining thr

Slide 10: Cross Section through the old Horzum Zinc Mine
Cross Section through the old Horzum Zinc Mine Resources Limited Template for Pinargozu • Mined from mid 1970’s to mid 1990’s • Indicates the potential of the region September 2014 10

Slide 11: Drill Success at Pinargozou
Resources Limited Drill Success at Pinargozou borehole PPU14-15 intersected 16.80 m of mixed oxide and sulphide zinc/lead/silver ore grading 39.0% zinc, 1.6% lead and 85 grams per ton silver within a total drilled length of 24.80 meters Mineralization is open at depth, and at the same stratigrap

Slide 12: Pinargozu – Horzum JV project
Resources Limited Pinargozu – Horzum JV project Planview 3D view looking North September 2014 12

Slide 13: Akkaya – Horzum JV project
Resources Limited Akkaya – Horzum JV project Akkaya Pinargozu Horzum 0 5 10 Kilometres September 2014 13

Slide 14: Pinargozou Strategy – Deliverables - Budget
Resources Limited Pinargozou Strategy – Deliverables - Budget STATUS Pinargozu Two of seven historic adits refurbished along hillside First Drill Success from level 707: 16.9 m of 39% Zn, 85 g/t Ag Turkish JV partner has started to mine and stockpile 25tpd high grade ore (DSO) IMMEDIATE GOALS Sh

Slide 15: Other Pasinex on-going projects
Resources Limited Other Pasinex on-going projects Golcuk Horzum September 2014 15

Slide 16: Golcuk – an emerging Cu project
Resources Limited Golcuk – an emerging Cu project Very Prospective Cu / Ag project • Volcanic Red bed Cu / Manto type Cu deposit • Same style as Keweenaw projects in Michigan (White Pine mine) Acquired in September 2012 Option agreement with Eurasian Minerals Inc. • 3,000,000 shares in tranche

Slide 17: Golcuk Project – an emerging story
Resources Limited Golcuk Project – an emerging story Cu mineralised zones throughout the property • Main Zone • West • North East • Golcuk South • Bayram • Baykus • Funlu September 2014 17

Slide 18: Golcuk Project - Main Zone drilling
Resources Limited Golcuk Project - “Main Zone” drilling First Pasinex Drill Hole from January 2013 (2.97% Cu in 9.7m) • Historic and Pasinex drilling in the Golcuk Main zone • ‘Manto’ style mineralisation • Mineralisation (Cu as chalcoite / bornite with Ag) trends NE September 2014 18

Slide 19: Golcuk Project – Golcuk South
Resources Limited Golcuk Project – Golcuk South New mineralised zone about 2.5 km SE of “Main Zone” Very high grade rock samples over area 700 m x 300 m Indication of the larger regional Cu opportunity Open pit Cu heap leach target Channel samples up to 1.4% Cu at surface Figure: Detailed

Slide 20: Golcuk Project – Golcuk South
Resources Limited Golcuk Project – Golcuk South Figure 1: Copper levels (in percent) in rock samples Figure 3: Length-weighted copper averages for channel sampling from Golcuk South. clusters at Golcuk South, showing three new (November 2013) clusters of channel sampling plotted in red (clusters 11

Slide 21: Capital Structure
Resources Limited Capital Structure Issued and Outstanding 75.93 M Placements • Feb / March 2012 (seed) $2.3 M 10 c share, no warrant • Dec 2012 $0.33 M 10 c share, half warrant 15c (2 yr) • July 2013 $0.32 M 8 c share, half warrant 16 c (2 yr) • Oct 2013 $0.25 M 6.5 c share, half warrant 10 c (

Slide 22: Future Direction
Resources Limited Future Direction Next 12 months: drive Pinargozu project to first resource definition and advance Akkaya and Golcuk Drilling at Horzum region project • Drill permits obtained for Pinargozu and Akkaya in March 2014 • Pinargozu drilling underway – to be completed early 2015 • Akkay

Slide 23: Future Direction – Preliminary budget
Resources Limited Future Direction – Preliminary budget $2.5 million for Pinargozu to PEA, Akkaya and Golcuk drilling, 12 months business management Budget end 2014 / 2015 Exploration JV amount Pasinex Pinargozu to PEA 4,500 m - 35 holes $600,000 $300,000 Akkaya preliminary - 10 holes $250,000 $125,

Slide 24: Thank you
Resources Limited Thank you Canada Main Office Office of President, Canada Pasinex Resources Limited Tel +1 705 292 8116 Suite 501 steve.williams@pasinex.com 133 Richmond Street W Toronto, Ontario M5H 2L3 Tel +1 416 861 9659 General Information info@pasinex.com Ankara Office, Turkey Koza Sok

Slide 25: Apendix: Pinargozu – Horzum JV project
Resources Limited Apendix: Pinargozu – Horzum JV project September 2014 25

Slide 26: Apendix: Horzum JV Infrastructure
Resources Limited Apendix: Horzum JV Infrastructure September 2014 26

Slide 27: Apendix: Horzum JV Instrastructure (continued)
Resources Limited Apendix: Horzum JV Instrastructure (continued) September 2014 27

Slide 28: Turkey – a great place to be
Resources Limited Turkey – a great place to be Pro-business & Pro-mine development • 16th largest economy in the world • Great infrastructure • High voltage electricity lines near all Pasinex properties Up to 30,000 mining licenses available in the next few years • Licenses relinquished by small

Slide 29: Pasinex Zinc Focus
Resources Limited Pasinex Zinc Focus September 2014 29

Slide 30: Mine Model of historic Horzum Mine
Resources Limited Mine Model of historic Horzum Mine High Grade Zinc Oxide in Cave Structures September 2014 30

Slide 31: Horzum Ground Penetrating Radar (GPR) promising
Resources Limited Horzum Ground Penetrating Radar (GPR) promising Pasinex has conducted ground penetrating radar at Horzum that shows the technology can “see” 80 meters into the limestone host rock and determine cavities that may be zinc containing. Drilling of targets identified by GPR will fol
Source: Internet Archive copy of pasinex.com
More decks from Pasinex Resources Ltd.
Investor Presentation (November 2026)48 slides · November 2026
Corporate Update (September 2026)13 slides · September 2026
Investor Presentation (August 2026)51 slides · August 2026
Investor Presentation (June 2025)51 slides · June 2025
Investor Presentation (February 2022)26 slides · Feb 8, 2022
Investor Presentation (March 2017)23 slides · March 2017