Wa1 Resources Ltd · ASX:WA1

Wa1 Resources — Shareholder Meeting (November 2025)

21 slides from Wa1 Resources's shareholder meeting presentation, Nov 20, 2025

  1. Slide 1: WA1 Resources Ltd Annual General Meeting November 2025

    WA1 RESOURCES LTD ANNUAL GENERAL MEETING NOVEMBER 2025 For personal use only Nb

  2. Slide 2: Important Notices and Disclaimer

    IMPORTANT NOTICES AND DISCLAIMER Nature of Document: This presentation has been prepared and issued by WA1 Resources Not an offer: This presentation and its contents are not an invitation, offer, solicitation or Ltd (WA1, the Company) to provide general information about the Company. The recommendat

  3. Slide 3: Luni Niobium Project highlights

    Nb The Luni Niobium Project was discovered late 2022, with the first ferroniobium sample produced in 2024 and an Indicated MRE reported mid-2025 100% owned by WA1 For personal use only A$155M in cash to advance key Project workstreams1 Strong share register of long-term institutional investors Board

  4. Slide 4: Corporate Snapshot

    CORPORATE SNAPSHOT CAPITAL STRUCTURE BOARD OF DIRECTORS Share price (19 November 2025) A$15.39 Kathleen Bozanic Non-Executive Chair For personal use only Shares on issue 74.2M Paul Savich Managing Director Performance rights 0.5M Tom Lyons Executive Director Market capitalisation (undiluted) A$1.14B

  5. Slide 5: Luni Niobium Project

    LUNI NIOBIUM PROJECT 1  Since 2023, drilling has focused on defining the shallow, oxide-enriched blanket of high-grade niobium mineralisation overlying the carbonatite plug For personal use only  Resource definition drilling has resulted in a substantial Indicated Mineral Resource estimate (MRE) f

  6. Slide 6: Luni Mineral Resource Estimate

    LUNI MINERAL RESOURCE ESTIMATE1  The Luni Niobium Project now contains a substantial Indicated MRE:  73 Mt at 1.38% Nb2O5 within a total MRE of 220 Mt at 1.0% Nb2O5 For personal use only 200 46% of contained  The Indicated MRE contains a high-grade subset of: 73 Mt niobium classified at 1.38% as

  7. Slide 7: Indicated MRE Supporting Mine Design

    INDICATED MRE SUPPORTING MINE DESIGN1  46% of the niobium contained within the Luni MRE is in the Indicated category 73 Mt For personal use only  The Indicated MRE is being utilised to inform mine design and at 1.38% development studies, and is split between two key zones providing 70 optionality

  8. Slide 8: East Infill 2025

    For personal use only 8| East Infill 2025

  9. Slide 9: Niobium Industry Process Flowsheets

    NIOBIUM INDUSTRY PROCESS FLOWSHEETS  The three existing niobium mines follow a similar flowsheet to produce a ferroniobium end-product for direct use in the steelmaking process For personal use only  WA1 is testing a conventional flowsheet utilising similar steps to the three existing mines 1 2 3

  10. Slide 10: Proof of Concept Ferroniobium Testwork

    PROOF OF CONCEPT FERRONIOBIUM TESTWORK1 1 2 3 CONVERSION TO REFINING BENEFICIATION FERRONIOBIUM For personal use only (Hydrometallurgy) (Pyrometallurgy) Crushing, Grinding and Conversion Vessel Calcining LUNI Desliming (Aluminothermic Reaction) MINERALISATION Phosphate Flotation HCl Wash (Stage 1) N

  11. Slide 11: Product Mix Enables Opportunity

    PRODUCT MIX ENABLES OPPORTUNITY1 CONVERSION TO REFINING TO REFINING BENEFICIATION FERRONIOBIUM NIOBIUM OXIDE (Hydrometallurgy) For personal use only (Pyrometallurgy) (Hydrometallurgy) Crushing, Grinding and Conversion Vessel Calcining HF Leach LUNI Desliming (Aluminothermic Reaction) MINERALISATION

  12. Slide 12: Developing One of Australia's Most Strategic Critical Mineral Projects

    DEVELOPING ONE OF AUSTRALIA’S MOST STRATEGIC CRITICAL MINERAL PROJECTS Mine Design Process Testwork Environmental For personal use only Indicated MRE informing mine Ongoing testwork to refine process Targeted surveys and design and ongoing pre- flowsheet development across the studies to support for

  13. Slide 13: Drilling to Support Development

    DRILLING TO SUPPORT DEVELOPMENT1  Two drill rigs in operation at Luni, with a focus on resource definition and pre-development activities  Drilling has been completed across a broad area to inform site design and disturbance envelopes For personal use only  Hydrogeological bore installation and p

  14. Slide 14: Airstrip Construction in Progress

    For personal use only Airstrip Construction in Progress 14 |

  15. Slide 15: Detailed Hydrogeological Studies in Progress

    For personal use only Detailed Hydrogeological Studies in Progress 15 |

  16. Slide 16: Caring for Country, Together

    For personal use only Caring for Country, Together 16 |

  17. Slide 17: WA1 in the Community

    For personal use only WA1 in the Community 17 |

  18. Slide 18: 2025 DMPE Community Partnership Award

    For personal use only 2025 DMPE Community Partnership Award 18 |

  19. Slide 19: An Essential Critical Mineral Project for the Constrained High-Value Niobium Market

    For personal use only AN ESSENTIAL CRITICAL MINERAL PROJECT FOR THE CONSTRAINED HIGH-VALUE NIOBIUM MARKET Investors Media Paul Savich Michael Vaughan Managing Director Fivemark Partners WA1 Resources Ltd E: psavich@wa1.com.au E: michael.vaughan@fivemark.com.au Lvl 2, 437 Roberts Road T: +61 8 6478 7

  20. Slide 20: Appendix A - References and Notes

    APPENDIX A - REFERENCES AND NOTES SLIDE 3 1. Cash balance as at 30 September 2025 2. For full details refer to WA1 website and previous ASX announcements SLIDE 5 For personal use only 1. For full details refer to ASX announcement dated 30 June 2025 SLIDE 6 1. For full details refer to ASX announceme

  21. Slide 21: Appendix B - Mineral Resource & Competent Person Statements

    APPENDIX B – MINERAL RESOURCE & COMPETENT PERSON STATEMENTS Tonnes Nb₂O₅ Nb₂O₅ P₂O₅ P₂O₅ For personal use only (Mt) (%) (kt) (%) (kt) Competent Person Statements: Indicated 73 1.38 1,000 11.3 8,200 The information in this presentation that relates to Exploration Results is based on information compi

WA1 Resources — Shareholder Meeting (November 2025) on 6ix