  1. Slide 1: Luni Niobium Project Pre-Feasibility Study AGM

    rsonal use only WA1 RESOURCES LTD LUNI NIOBIUM PROJECT PRE-FEASIBILITY STUDY ANNUAL GENERAL MEETING NOVEMBER 2026 Image: Ferroniobium from Luni

  2. Slide 2: Important Notices and Disclaimer

    IMPORTANT NOTICES AND DISCLAIMER Disclaimer: This presentation has been prepared for information purposes only. It does Not an offer: This presentation and its contents are not an invitation, offer, solicitation or not constitute an offer, invitation or recommendation to subscribe for or purchase re

  3. Slide 3: Key Highlights

    KEY HIGHLIGHTS PFS CONFIRMS LUNI’S POTENTIAL AS A STRATEGIC, LONG-LIFE NIOBIUM PROJECT CONVENTIONAL DEVELOPMENT PATHWAY IN A WORLD-CLASS MINING JURISDICTION PFS 100% UNDERPINNED BY A HIGH-GRADE PROBABLE ORE RESERVE – CAPTURING ONLY ~25% OF TOTAL rsonal use only MINERAL RESOURCES PROBABLE ORE RESERVE

  4. Slide 4: Luni Niobium Project

    LUNI NIOBIUM PROJECT Luni discovered on 16 November 2022 disciplined execution over 4 years from rsonal use only discovery to PFS Coordinated de-risking building confidence across technical, commercial, environmental and stakeholder workstreams Value, optionality and risk balanced a robust platform

  5. Slide 5: Initial Ore Reserve

    INITIAL ORE RESERVE 12 4.0% Average Grade Mined (Nb2O5 %) • Life of Mine (LOM) is 100% underpinned by the Ore 3.5% Ore and Waste Mined (Mt) 10 Reserve of 20.3 Mt at 2.75% Nb2O5 3.0% 8 rsonal use only 2.5% • Ore Reserve represents only a portion of the contained 6 2.0% niobium in the total MRE, leavi

  6. Slide 6: A Once in a Generation Niobium Reserve

    A ONCE IN A GENERATION NIOBIUM RESERVE ORE RESERVES OF UNDEVELOPED NIOBIUM DEPOSITS1 3.0% Luni Ore Reserve rsonal use only 2.5% 2.0% Reserve Grade (Nb2O5 %) 1.5% 1.0% Dubbo 0.5% Elk Creek Thor Lake Kanyika Aley 0.0% 0 100 200 300 400 500 600 Contained Tonnes (Nb2O5, kt) *Bubble size = Ore Reserve (M

  7. Slide 7: Mining & Processing to Niobium Concentrate

    MINING & PROCESSING TO NIOBIUM CONCENTRATE Luni Mining, Beneficiation & NPI Metric CAPEX (incl. Contingency) A$770 M Total Ore Mined 20.3 Mt rsonal use only Average Ore Grade Mined 2.75% Nb2O5 Average Mill Throughput 1.2 Mtpa Average Beneficiation Recovery 57.3% Average Concentrate Grade 45.1% Avera

  8. Slide 8: Site Layout & Logistics Corridor

    SITE LAYOUT & LOGISTICS CORRIDOR rsonal use only LUNI PRELIMINARY PROJECT GENERAL ARRANGEMENT • Efficient general site arrangement including mine, process plant and non-process infrastructure • On-site airstrip supporting workforce access and operations • 110 km haul road links Luni to the existing

  9. Slide 9: Processing & Production of Ferroniobium

    PROCESSING & PRODUCTION OF FERRONIOBIUM PROVEN SIMPLE FLOWSHEET DELIVERING A FERRONIOBIUM END-PRODUCT Whyalla Refining & Conversion Metric rsonal use only Conversion CAPEX (incl. Contingency) A$299 M Average Refining Recovery 99.5% Average Conversion Recovery 98.0% FeNb Steady-State Production 20,00

  10. Slide 10: Modern Steelmaking Demands More Ferroniobium

    MODERN STEELMAKING DEMANDS MORE FERRONIOBIUM • Global FeNb production is currently ~118ktpa with a price of Key ferroniobium markets ~US$50,040/t Nb1 by demand2 rsonal use only • FeNb is primarily utilised as a micro-alloy in high-strength low-alloy steels Structural Automotive • Steel alloyed with

  11. Slide 11: Diversifying Global Niobium Supply at Scale

    DIVERSIFYING GLOBAL NIOBIUM SUPPLY AT SCALE LUNI IS STRATEGICALLY POSITIONED TO PROVIDE A NEW LARGE-SCALE LONG-TERM SOURCE OF SUPPLY 125 RESOURCE GRADE OF KEY NIOBIUM PRODUCERS1 (Nb2O5) KEY NIOBIUM PRODUCTION2 2.5% Niobium Production (FeNb eq. ktpa) rsonal use only Products: FeNb Nb2O5 100 75 Two pr

  12. Slide 12: Luni Niobium Project Overview

    LUNI NIOBIUM PROJECT OVERVIEW INITIAL 17 YEAR MINE LIFE DELIVERS ROBUST ECONOMICS BASE CASE (US$46,500/t Nb) SPOT CASE (US$50,040/t Nb) FERRONIOBIUM PRODUCTION NPV8 PRE-TAX NPV8 rsonal use only 20,000 tpa A$2.5 Bn Pre-tax A$3.0 Bn FeNb final product (65% Nb) 33% IRR A$1.7 Bn Post-tax LIFE OF MINE EB

  13. Slide 13: On-Country Surveying and Community Opportunities

    rsonal use only ON-COUNTRY SURVEYING WITH LOCAL CREATING ON-COUNTRY OPPORTUNITIES IN RANGER GROUPS AUSTRALIA’S MOST REMOTE COMMUNITIES 13

  14. Slide 14: Next Steps

    NEXT STEPS INDICATIVE SCHEDULE TO DELIVER AUSTRALIA’S FIRST NIOBIUM PROJECT 2026 2027 2028 2029 2030 2031  rsonal use only DEFINE Studies • Engineering Definition SECURE Key Approvals • Agreements • Offtake and Financing PREPARE FEED • Early & Enabling Works • Long Lead Procurement BUILD Mine Devel

  15. Slide 15: Corporate Snapshot

    CORPORATE SNAPSHOT CAPITAL STRUCTURE RESEARCH COVERAGE Share price (17 November 2026) A$7.33 rsonal use only Shares on issue 74.4 M Performance rights 0.5 M Market capitalisation (undiluted) A$545 M Cash1 A$113 M Enterprise value A$432 M BOARD REGISTER COMPOSITION Kathleen Bozanic Paul Savich Tom Ly

  16. Slide 16: Luni Niobium Project

    LUNI NIOBIUM PROJECT PFS confirms Luni as a strategic, long-life niobium project rsonal use only Initial 17-year LOM capturing only ~25% of total Mineral Resources Robust base case economics underpinned by high-quality Probable Ore Reserve Pre-tax NPV8 A$2.5 Bn (IRR 29%) Post-tax NPV8 A$1.7 Bn (IRR

  17. Slide 17: The Next Generation of Niobium Supply

    rsonal use only Image: WA1‘s first plane landed at the Luni airstrip THE NEXT GENERATION OF NIOBIUM SUPPLY Investors Media WA1 Resources Ltd Paul Savich Michael Vaughan Lvl 2, 437 Roberts Road Managing Director Fivemark Partners Subiaco, WA 6008 E: psavich@wa1.com.au E: michael.vaughan@fivemark.com.

  18. Slide 18: Appendix A – References

    APPENDIX A – REFERENCES SLIDE 3 1. For full details refer to ASX announcement dated 18 November 2026 SLIDE 4 1. Cash balance as at 30 September 2026, as per ASX Announcement September 2026 Quarterly Activities rsonal use only SLIDE 5 1. For full details refer to ASX announcement dated 18 November 20

  19. Slide 19: Appendix B – Competent Person Statement

    APPENDIX B – COMPETENT PERSON STATEMENT The information in this presentation that relates to Exploration Results, Mineral Resources, Ore Reserves and • "West Arunta Project - Luni Metallurgical Results" dated 9 December 2024 Metallurgical factors has been extracted from the Company’s previous ASX an

  20. Slide 20: Appendix C – Mineral Resource & Ore Reserve Statements

    APPENDIX C – MINERAL RESOURCE & ORE RESERVE STATEMENTS 2026 MRE Tonnes (Mt) Nb₂O₅ (%) Nb₂O₅ (kt) 2026 Ore Reserve Tonnes (Mt) Nb2O5 (%) Nb₂O₅ (kt) rsonal use only Indicated 93 1.32 1,230 Proved - - - Inferred 130 0.7 940 Probable 20.3 2.75 558 Total 220 1.0 2,200 Total 20.3 2.75 558 1. Mineral Resou

  21. Slide 21: Appendix D – Ore Reserves of Other Niobium Deposits

    APPENDIX D – ORE RESERVES OF OTHER NIOBIUM DEPOSITS ORE RESERVES OF UNDEVELOPED NIOBIUM DEPOSITS Total Proven Probable rsonal use only Deposit Owner Country Tonnes Grade Contained Tonnes Grade Contained Tonnes Grade Contained (Mt) (% Nb2O5) (kt Nb2O5) (Mt) (% Nb2O5) (kt Nb2O5) (Mt) (% Nb2O5) (kt Nb2

  22. Slide 22: Appendix E – Key Parameters and Assumptions

    APPENDIX E – KEY PARAMETERS AND ASSUMPTIONS Key PFS Assumption Unit Outcome Key PFS Assumption Unit Outcome Financial OPEX Estimates (avg.) Life of Mine Yrs 17.3 Concentrate rsonal use only Ferroniobium Price (65% Nb) – Base Case US$/t FeNb 30,225 Mining Material Mined (A$) 12.3 Ferroniobium Price (