Maple Gold Mines Ltd · TSXV:MGM

Maple Gold Mines — Investor Presentation (July 2022)

22 slides from Maple Gold Mines's investor presentation, July 2022

  1. Slide 1: Corporate Presentation July 2022

    CORPORATE PRESENTATION JULY 2022

  2. Slide 2: Disclaimer

    DISCLAIMER Cautionary Notes Regarding Forward-Looking Statements This Corporate Presentation (“Presentation”) includes “forward-looking information” and “forward-looking statements” (collectively referred to as “forward-looking statements”) within the meaning of applicable Canadian securities legisl

  3. Slide 3: Finding Gold in the Shadow of Headframes

    FINDING GOLD IN THE SHADOW OF HEADFRAMES Blueprint for Maple Gold’s success: 1. LOCATION, LOCATION, LOCATION  2. ESTABLISHED AND GROWING RESOURCE  3. HIGH-GRADE PAST-PRODUCING MINE  4. CAPITAL TO EXECUTE  5. EXPERIENCED TEAM / STRATEGIC PARTNER  MAPLE GOLD MINES is a well-capitalized gold explo

  4. Slide 4: Success Factors Driving Future Value Creation

    SUCCESS FACTORS DRIVING FUTURE VALUE CREATION Established/Growing Gold Led by experienced mining, Strong Strategic and Located in Quebec’s Prolific Strategic & JV Partnership Robust Balance Sheet Resource and High-Grade exploration, and capital Institutional Shareholders Abitibi Greenstone Belt with

  5. Slide 5: Exceptional Infrastructure Access

    EXCEPTIONAL INFRASTRUCTURE ACCESS  2.5-hour drive north of Val d’Or, Quebec along paved 2-lane provincial highway (Hwy #109), which runs through the property  Next to 1 of 6 major power lines in the province  55 km SW of Matagami with skilled labour, local airport and rail access  Douay covers ~

  6. Slide 6: Strategically Located Land Position

    STRATEGICALLY LOCATED LAND POSITION  Blue ellipses highlight key synergies between Agnico and Kirkland Lake assets/operations  Gold ellipse is Maple Gold’s Douay-Joutel- Eagle 400 km² property package  Established and growing 3.03 Moz gold resource at Douay (50/50)  High-grade historic gold mine

  7. Slide 7: District-Scale Mineralization Footprint

    DISTRICT-SCALE MINERALIZATION FOOTPRINT  Similar mineralization footprint to the two largest mines in the Abitibi  Douay remains underexplored vs. Canadian Malartic and Detour Lake  55km of strike along the Casa Berardi Deformation Zone  Significant exploration upside Disclaimer: Mineralization

  8. Slide 8: Strong Partnership with Agnico Eagle

    STRONG PARTNERSHIP WITH AGNICO EAGLE  CANADA’S LEADING GOLD PRODUCER & 3rd LARGEST GOLD PRODUCER WORLDWIDE.  Takes extremely conservative and measured approach to investments and asset acquisition.  50-50 JV Agreement signed February 2021: Agnico funding C$18.25M in exploration over 4 years (2021

  9. Slide 9: Douay Gold Project – Overview

    DOUAY GOLD PROJECT – OVERVIEW DOUAY GOLD PROJECT (50%) One of Quebec’s Largest Undeveloped Gold Resources Indicated: 10.0 Mt @ 1.59 g/t Au for 511 Koz Au Inferred: 76.7 Mt @ 1.02 g/t Au for 2.53 Moz Au Major resource expansion and new discovery potential across 357 km2 property package - virtually r

  10. Slide 10: Douay 2022 Mineral Resource Estimate

    DOUAY 2022 MINERAL RESOURCE ESTIMATE Pit-Constrained & Underground Mineral Resource Estimate (SLR 2022)  21% increase in OP Indicated Resource to 511,000 oz at an average grade of 1.59 g/t Au Tonnes Grade Contained Metal Resource Category (Mt) (g/t Au) (000 oz Au)  Slight increase in OP Inferred R

  11. Slide 11: Douay Conceptual Open Pit Mine Plan (2022 MRE)

    DOUAY CONCEPTUAL OPEN PIT MINE PLAN (2022 MRE)  Targeted infill drilling shows 531 Zone Maiden Indicated Resource: potential for future resource 58,000 oz @ 2.85 g/t Au conversion and continues to de-risk the Douay deposit Nika Zone  ~7,000 m of additional drilling Maiden Indicated Resource: 30,00

  12. Slide 12: Douay Untested Resource Expansion Potential at Depth

    DOUAY UNTESTED RESOURCE EXPANSION POTENTIAL AT DEPTH The Douay-Joutel JV is based on the Canadian Malartic JV Partnership Canadian Malartic is now Canada’s largest gold mine 1.9 Moz 6.4 Moz NW-SE vertical longitudinal section (all zones) showing distribution of below-pit-shell underground blocks >1.

  13. Slide 13: Agnico Eagle's 1st Gold Mine: Joutel Mine Complex (1974-1993)

    AGNICO EAGLE’S 1ST GOLD MINE: JOUTEL MINE COMPLEX (1974-1993) Joutel Mine Site Entrance Telbel Headframe Eagle Mine Mill Complex Note: Historical photos. All surface infrastructure has been reclaimed. PAGE 13

  14. Slide 14: History of the Joutel Mine Complex

    HISTORY OF THE JOUTEL MINE COMPLEX USD Gold Price Chart with Key Events MGM commences Phase I $2,250 drill program at Eagle MGM-AEM complete 50/50 JV on Douay/Joutel Gold Projects $2,000 Globex drills 12.4 m @ 2.9 g/t Au, including 4.8 m @ 5.4 g/t ??? Au (EM-14-001) at Eagle $1,750 $1,500 AEM drills

  15. Slide 15: Joutel/Eagle: A Historic Mine Trend with High-Grade Upside

    JOUTEL/EAGLE: A HISTORIC MINE TREND WITH HIGH-GRADE UPSIDE Former Eagle Mine Operation JOUTEL PROJECT JOUTEL (50%), GOLD EAGLE PROJECT PROJECT (50%) (100%) Hosts Agnico’s former Joutel Mining Complex Past production of 6.2 Mt at 6.5 g/t Au for total of 1.1 Moz gold* Mined from 1974 to 1993 (closed w

  16. Slide 16: Eagle-Telbel Long Section Shows Significant Drilling Gaps

    EAGLE-TELBEL LONG SECTION SHOWS SIGNIFICANT DRILLING GAPS A High-Grade Restart Opportunity with Excellent Near-Mine Expansion Potential PAGE 16

  17. Slide 17: 2022/2023 Deep Drilling Program Approved

    2022/2023 DEEP DRILLING PROGRAM APPROVED Douay NW-SE vertical longitudinal section (all zones) showing location of proposed deep drill holes relative to existing drilling and SLR 2022 mineral resources and conceptual pits  Maple Gold and Agnico have just agreed on a C$4.8M budget increase to the JV

  18. Slide 18: The Maple Gold Value Stack

    THE MAPLE GOLD VALUE STACK  C$20M IN CASH (AS OF MARCH 31, 2021)  C$14M IN REMAINING JOINT VENTURE FUNDING FROM AGNICO EAGLE (2022-2024)  C$9M IN POTENTIAL WARRANT PROCEEDS C$59M  C$40M IN BUY BACK PROVISIONS TIED TO MAPLE GOLD’S 2% NSR AT DOUAY  C$150M IN DRILLING REPLACEMENT COSTS (250,000+ M

  19. Slide 19: Recent Milestones & Upcoming Catalysts

    RECENT MILESTONES & UPCOMING CATALYSTS MGM Px/Vol 1  Signed Definitive JV Agreement with Agnico Eagle  $0.60 12.0 2  Initial JV drill program returned 3 of top 5 intercepts ever $0.50 10.0 reported at Douay  3  Acquired 100% Option on Eagle Mine Property  $0.40 8.0 4  Major digitization and 3

  20. Slide 20: Capital Structure, Financial Position and Ownership

    CAPITAL STRUCTURE, FINANCIAL POSITION AND OWNERSHIP As of June 30, 2022 Share Ownership Mix Shares Outstanding 335.9M 2.7% Warrants (100% Agnico)1 25.8M 12.1% Options2 25.5M Management/Insiders/Closely Related Fully Diluted3 392.5M 44.2% Agnico Eagle Mines 52-week high/low share price $0.46-$0.16 Ma

  21. Slide 21: Key Management/Board/Advisors

    KEY MANAGEMENT/BOARD/ADVISORS $15B Matthew Hornor President & CEO Joness Lang Executive VP Kiran Patankar SVP Growth Strategy Fred Speidel VP Exploration $30B $5B $30B Michelle Roth Gérald Riverin Maurice Tagami David Broughton Chairperson/Director Director/Tech Advisor Director/Tech Advisor Technic

  22. Slide 22: Contact Information

    CONTACT INFORMATION SUITE 600 1111 WEST HASTINGS STREET VANCOUVER, BC V6E 2J3 CANADA PHONE: +1 (647) 265.8688 EMAIL: INFO@MAPLEGOLDMINES.COM Douay headframe at night – October 2021

Maple Gold Mines — Investor Presentation (July 2022) on 6ix