Zinc Of Ireland Nl · ASX:ZMI
Zinc Of Ireland Nl — Investor Presentation (June 2018)
20 slides from Zinc Of Ireland Nl's investor presentation, June 2018
Slide 1: Company Update: June 2018
ASX Code: ZMI Company Update: June 2018 7,500m drilling program set to commence Exploring expansion of existing Resources and new ore positions
Slide 2: Zinc of Ireland
Zinc of Ireland Exploring for the right commodity (Zinc/Lead) in the right place (Ireland) ✦ Company has already delineated a maiden Inferred Resource ✦ 5.2Mt @ 8.6% Zn+Pb, includes McGregor sulphide component of 4.0Mt @ 7.5% Zn + 1.3% Pb ✦ Planning to expand this Resource position to give critical
Slide 3: Corporate overview (ASX code: ZMI)
Corporate overview (ASX code: ZMI) DIRECTORS Richard Monti – Non Executive Chairman Shares on Issue 1,945,695,208 Corporate geologist with over 30 years experience in the international resource industry. Options on Issue (various Over 42 “director years” experience for 13 ASX and TSX listed companie
Slide 4: Zinc, the World’s Fourth Most Consumed Metal
Zinc, the World’s Fourth Most Consumed Metal Poised for further price increase ✦ Zinc price broke through $3,500/t January 2018 ✦ LME zinc stockpiles at 12yr lows, deficit of 500,000t in 2017 ✦ Demand continues to grow ✦ Supply continues to fall ✦ Continued price strength likely ✦ Shortage of large
Slide 5: Ireland, a Place Where Mines can be Built
Ireland, a Place Where Mines can be Built Exploring for the right commodity (Zinc/Lead) in the right place (Ireland) ✦Home to large, high-grade zinc mines ✦Navan, Lisheen, Galmoy, Tynagh ✦ Low political risk, mining friendly ✦ Cheap grid power, mains water ✦ Roads/railways/ports ✦ Skilled workforce,
Slide 6: Ireland, Home of Zinc Mining
Ireland, Home of Zinc Mining Ranked first in the world in terms of zinc discovered per square metre 40 Km Ballinalack Navan Need a map and table here showing the zn/pb deposits of ireland and our ground Tynagh Kildare IRISH MIDLANDS 5.2Mt See slide 7 of hannan @ 8.6% Zn+Pb presentation ORE-FIELD Gal
Slide 7: Zinc of Ireland – History of the Kildare Project
Zinc of Ireland – History of the Kildare Project Story of success to date – planning to extend this success into future programs ✦ Compilation of historical database ✦ Drill targets worked up and tested (24 holes to date for 7,400m) ✦ Successfully extended McGregor and Shamrock mineralisation ✦ 23.3
Slide 8: Kildare Project (100% ZMI)
Kildare Project (100% ZMI) Located along Rathdownay mineralised trend along strike from Lisheen ✦ Large (250km2) Project in the heart of the Irish Zinc Belt ✦ Located 40km SW of Dublin ✦ Exploration focussed on the Allenwood Graben ✦ Allenwood Graben shares key features with known mineralised trends
Slide 9: Kildare, Hallmarks of Irish Type Zinc Deposits
Kildare, Hallmarks of Irish Type Zinc Deposits Fault controlled, multiple ore bodies ‘IRISH-TYPE’ SETTING Lisheen Silvermines Tynagh Kildare Sited on Regional ‘Mineralised’ Trend Extensional Tectonics and Basin Formation Proximity to Basin Margin ‘IRISH-TYPE’ GEOLOGY Waulsort
Slide 10: Fault Corridors: Zinc Mineralisation Strung Along Corridors
Fault Corridors: Zinc Mineralisation Strung Along Corridors D Drill Hole >200m Celtic Tiger McGregor Shamrock Deposit Deposit C ✦ 3 key corridors – Allenwood, McGregor and Ballyteague ✦ Historical shallow drilling highlights zinc enrichment along the corridors ✦ Zinc deposits strung along corridors
Slide 11: Corridor 1: McGregor
Corridor 1: McGregor W Drill Hole >200m E Celtic Tiger McGregor Shamrock Deposit Deposit ✦Three ore positions defined along the McGregor Corridor, additional targets identified ✦Initial JORC Inferred Resource of 5.2Mt @ 8.6% Zn+Pb within the McGregor Corridor ✦Potential for mineralisation to have de
Slide 12: Kildare and Shamrock Resources: Potential for Growth
Kildare and Shamrock Resources: Potential for Growth ✦McGregor and Shamrock Scope to extend Resource to the north MC4 existing sulphide and west resources: Kildare Resource McGregor 5.2Mt @ 8.6% Zn+Pb ✦4.0Mt @ 8.8% Zn+Pb (McGregor) MC2 ✦1.1Mt @ 7.4% Zn+Pb McGregor Corridor (Shamrock) Shamrock Base o
Slide 13: Corridor 2: Allenwood
Corridor 2: Allenwood Drill Hole >200m A B Allenwood corridor AC3 AC2 AC4 AC1 Mcgregor corridor MC4 Shamrock Deposit MC1 MC2 MC3 Celtic Tiger McGregor Deposit ✦ Drilling designed to test similar features as found in McGregor Corridor ✦ Historical exploration in Allenwood Corridor focused on outdated
Slide 14: Corridor 3: Ballyteague
Corridor 3: Ballyteague Mcgregor corridor Drill Hole >200m MC4 Shamrock Celtic Tiger Deposit MC1 MC2 MC3 McGregor Deposit BC1 BC2 BC3 BC4 ✦ Sparse historical exploration, some testing of geophysical anomalies ✦ Geology stepping up to the west similar to Celtic Tiger ✦ Additional deposits here would
Slide 15: New Focus Delivers Major Development – Western Platform
New Focus Delivers Major Development – Western Platform Celtic Tiger opens up 4km-long structural platform ✦ Discovery of Celtic Tiger including 23.95 @ 8.0% Zn+Pb from 166m ✦ Celtic tiger provides proof of “stepped-up” Western Platform concept ✦ Opens up 4km long structural ‘platform’ with shallow
Slide 16: Kildare Project, A Target Rich Setting
Kildare Project, A Target Rich Setting ✦Make additional discoveries within Drill Hole >200m ~2km of McGregor (5,000m/10-15 holes) Allenwood Corridor (AC2 & AC3) AC1 AC2 AC3 AC4 Ballyteague Corridor (BC1 & BC3) MC4 Western Platform (MC1 & BC1) Celtic Tiger MC1 MC2 MC3 Block Margins (Harzand, NM1) McG
Slide 17: Desired Outcomes: >Mineralised Footprint and >Resources
Desired Outcomes: >Mineralised Footprint and >Resources Expand Resource position to give critical mass for the assessment of mining scenarios ✦ Extend existing resources at McGregor and Shamrock ✦ Identify new deposits close to centralised McGregor deposit ✦ Flexibility and funding to drill out any
Slide 18: ZMI: Paving the Way for an Exciting 2018
ZMI: Paving the Way for an Exciting 2018 ✦ ZMI poised for high-impact drilling campaign ✦ Kildare emerging as a significant Irish zinc project ✦ Exploration model has produced immediate success and highlights potential for multiple deposits centred around the McGregor Resource ✦ Zinc supply at 2006
Slide 19: Competent Persons’ Statements
Competent Persons’ Statements The information in this presentation that relates to exploration results is based on information compiled by Mr Peter van der Borgh, a Competent Person who is a Fellow of the Geological Society of London. Mr van der Borgh is a director and shareholder of Zinc of Ireland
Slide 20: Disclaimer
Disclaimer The following disclaimer applies to this presentation and any information provided regarding the information contained in this presentation. You are advised to read this disclaimer carefully before reading or making any other use of this presentation or any information contained in this p
Zinc of Ireland NL — Investor Presentation (June 2018) on 6ix