Jameson Resources Limited · ASX:JAL

Jameson Resources — Investor Presentation (May 2009)

20 slides from Jameson Resources's investor presentation, May 2009

  1. Slide 1: Investor Presentation

    Investor Presentation May 2009

  2. Slide 2: Disclaimer

    Disclaimer This document has been prepared as a summary only, and does not contain all information about the Company’s assets and liabilities, financial position and performance, profits and losses, prospects and the rights and liabilities attaching to the Company’s securities. This document should

  3. Slide 3: Snapshot

    Snapshot ƒ Jameson re‐commissioning an existing brown fields thermal coal mine in Western Canada ƒ Norwest Corporation undertaking feasibility study and project implementation schedule ƒ Opportunity to expand production under existing 250Ktpa Mining Permit ƒ 19 million tonnes of export quality therm

  4. Slide 4: Corporate Information

    Corporate Information Board of Directors Mr Jeff Bennett Non Executive Chairman Mr John Holmes Executive Director Mr David Prentice Non Executive Director Mr Stephen Anastos Non Executive Director Capital Structure Shareholders Summary – Post Final Payment Shares on Issue 52.1m Compliance Energy Cor

  5. Slide 5: Mine Location

    e e hf Mine Location 4; Jameson v “ Jameson RESOURCES LIMITED BASIN COAL PROJECT Project Location TRU ATNS i COLWIMIENA Basin Coal Mine COALFIELD TYPE @ Lignite ee @ Subbituminous epee @ Low & Medium Volatile Bituminous UNITED STATES | © tor weiedumes 2 Major road ++ Railway May 2009

  6. Slide 6: Existing Mine & Expansion Plan

    Existing Mine & Expansion Plan Basin’s Plant Site Basin’s Main 17m Seam Existing 250,000 tpa coal handling and preparation plant to produce and export thermal coal from the ƒ mine May 2009 7

  7. Slide 7: Mining - 2005

    Jameson id 29 49 ining - 2005 M a i=} S Ot > Gy =

  8. Slide 8: Resource

    Resource “ Jameson w RESOURCES LIMITED T id 4, Jameson @ — RESOURCES LIMITED BASIN COAL PROJECT || Tenements & Resource CL 355394 D Defined Surface Exposure z BRT ensio of Coal Seam Ls a 3 3 * | q jge Princeton 20km —~p “yx me CL 355393 » e z CL 355395 . ° 8 i ios E 3 0,000tpa O « O e Plant | CL 355

  9. Slide 9: Resource & Quality

    Resource & Quality NI 43‐101 Resource Table Indicative Clean Coal Quality (as‐received) Measured Resources 18.1mt Coal Type High Volatile Bituminous C ‐ Thermal Indicated Resources 0.9mt Calorific Value (a.d.b.) 6,080kcal/kg Total M&I Resources 19.0mt Total Moisture 10% Seam Thickness 17.0m Ash 12%

  10. Slide 10: Re-commissioning Study - Coal Quality Sampling

    Re‐commissioning Study ‐ Coal Quality Sampling May 2009 11

  11. Slide 11: Potential Mine Expansion

    Potential Mine Expansion Production Potential to 2015 Basin Coal Mine Scoping studies have commenced to identify the potential options available to restart and expand the ƒ mine ƒ Marketing studies will be carried out to attract potential off take partners May 2009 12

  12. Slide 12: Basin Coal Marketing

    Basin Coal Marketing Potential Domestic Market Potential International Market Main Buyers Lehigh, Lafarge Main Buyers International Utilities Haulage Options Truck/Barge Haulage Options Truck/Rail/Barge Port Options Not required Port Options Westshore / Texada Island / Seattle Contract Type Long Ter

  13. Slide 13: Haulage Route

    Haulage Route 50km Rail Load Out Options ƒ CN & CP Rail ƒ Infrastructure & capacity Westshore Terminals ƒ Train Haulage 157km Truck Haulage ƒ 5mtpa+ capacity ƒ 52km forestry roads ƒ 60 km Highway ƒ Minimal upgrades required Basin is the closest coal project to the mainland Western Canadian ports; ot

  14. Slide 14: Rail Load Out - Options

    Rail Load Out ‐ Options May 2009 15

  15. Slide 15: Rail/Transport Infrastructure

    Rail/Transport Infrastructure Rail Transportation Capacity Available Loading Point Haulage to Westshore CN Rail Yes Hope 157km CP Rail Yes Hope 157km Southern Railway of British Columbia Yes Chilliwack 107km Both CN Rail and Southern Railway of British Columbia have expressed interest to haul the co

  16. Slide 16: Westshore Coal Terminal

    Westshore Coal Terminal Westshore Coal Terminal Annual Capacity 26mtpa Capacity Available Yes Berth One Vessel size 260,000 dwt 1x 7,000tph ship loader Berth Two Vessel size 150,000 dwt 1x 7,000tph ship loader Westshore is the largest North American coal export port and handles coal from Canada and

  17. Slide 17: Project Acquisition Summary

    Project Acquisition Summary Milestone Cash Shares Initial Payment C$1.15m 12.4m Completion of a Bankable Feasibility Study C$3.10m 12.4m (on or before 31 May 2010) Commencement of Commercial Production ‐ 12.4m (on or before 31 May 2012) Production of 500,000t of saleable coal ‐ 5.0m (on or before 31

  18. Slide 18: A$/Reserve Tonne

    Jameson’s Value Enterprise Value per Reserve Tonne 12 10 A$/Reserve Tonne 8 6 4 2 0 Gloucester Coal Bathurst Whitehaven Coal Centennial Coal Jameson Resources Based on estimated reserves, Jameson is significantly undervalued when compared to other industry ƒ players ƒ Using this as a metric, there i

  19. Slide 19: Summary

    Summary JAL has an option to acquire the mining rights to Basin for C$3.1 million cash and 29.8 million JAL ƒ shares (total value of approximately A$10.17m) ƒ Basin has a NI 43‐101 compliant open pit thermal coal resource of 19 million tonnes and a 17m seam ƒ Excess rail and port capacity is availab

  20. Slide 20: Level 2, 79 Hay Street Subiaco, WA

    Level 2, 79 Hay Street Subiaco, WA (08) 9200 4474 www.jamesonresources.com.au 22