    ASX ANNOUNCEMENT 14 October 2021 INVESTOR PRESENTATION 2021 Resource Rising Stars-Miningnews.net “Boom in a Room Investor Conference” Greenvale Mining Limited (ASX:GRV) is pleased to advise that Chief Executive Officer Matt Healy will today deliver an updated corporate presentation at the 2021 Resou

  2. Slide 2: A Dual Roadway to Growth and Value Creation

    ASX: GRV A Dual Roadway to Growth and Value Creation Resource Rising Stars Investor Conference October 2021

  3. Slide 3: Important Information

    Important Information DISCLAIMER FORWARD-LOOKING STATEMENTS This document and all other information (whether in writing or otherwise) which may be made This presentation contains forward looking statements. Forward looking statements are often, but not available, or part thereof does not: always, id

  4. Slide 4: Corporate Summary

    Corporate Summary SHAREHOLDER SNAPSHOT CAPITAL STRUCTURE Board & Management Shares M 397 24% Options M - Share price (8 October 2021) A$ $0.32 Market Capitalisation A$ $127m Cash & Investments A$ $9.09m Top 20 Shareholders % 48% Other 76% SHARE PRICE 0.7 12 0.6 10 Volume Millions 0.5 8 Price AU$ 0.4

  5. Slide 5: Alpha Torbanite Project

    Alpha Torbanite Project ON THE ROAD TO SUCCESS AT ALPHA ● Located in central QLD, 500km west of Rockhampton ● Discovered in 1939 ● An organic-rich sedimentary rock formed in a lacustrine (lake) environment ● Alpha torbanite is exceptionally high-grade, containing up to 650 litres of hydrocarbons per

  6. Slide 6: Alpha Torbanite Project

    Alpha Torbanite Project TORBANITE IN-SITU STRIP RATIO MODEL ● Conceptual 10-year+ mine life ● Torbanite zone approx. 800ha (~4km x 2km). ● Extends from 5m depth on eastern side to maximum 50m depth on western side. DRILLING COMPLETE ● 62 drill holes completed, with 284m of 4C core samples acquired f

  7. Slide 7: Alpha Torbanite Project

    Alpha Torbanite Project NEW COMMERCIALISATION PATHWAY ● An updated commercialisation strategy for the Project has been developed incorporating a “green” power generation model. ● The Project will be designed to meet emissions best-practice and include a solar and gas-fired hybrid power station feedi

  8. Slide 8: Wholesale Electricity

    Alpha Torbanite Project WHOLESALE ELECTRICITY ● Produced by a co-generation turbine (gas plus steam) and solar farm. ● Current planning is based on having a 50MW turbine which will produce enough waste heat for the retorting process coupled with a 50MW solar farm (or alternative renewable energy sys

  9. Slide 9: Bitumen Products

    Alpha Torbanite Project Australia’s Bitumen Consumption Forecast (Mt) 1.6 1.4 1.2 1.0 BITUMEN PRODUCTS 0.8 0.6 ● Greenvale has been in discussion with local asphalt producers and is 0.4 confident that long-term supply agreements can be secured for all the 0.2 0.0 bitumen produced. 2020 2021 2022 202

  10. Slide 10: Process Plant Layout and Specifications

    Alpha Torbanite Project PROCESS PLANT LAYOUT AND SPECIFICATIONS ● Up to 85% of the raw material is likely to be converted into refined products. ● Up to 15% of the raw material will be consumed for power generation and sulphuric acid production. ● Energy efficiency and reduction of emissions to acce

  11. Slide 11: Georgina Basin IOCG Project

    Georgina Basin IOCG Project EXTENSIVE FOOTPRINT ● Seven granted tenements ● Four under application ● Total Area 4,509km2 ● Iron-Oxide-Copper-Gold deposit prospectivity ● World-class greenfields discovery potential © Copyright Greenvale Mining Ltd 2021 10

  12. Slide 12: East Tennant – A New Greenfields Frontier

    Georgina Basin IOCG Project Tennant Creek EAST TENNANT – A NEW GREENFIELDS FRONTIER Mount Isa ● Collaboration between NTGS and Geoscience Australia ● $40m in 5 years – National Initiative ● Upgrading Geophysical survey coverage ● Mineral deposit prospectivity modelling ● NDI stratigraphic drilling ●

  13. Slide 13: Insights from the National Drilling Initiative

    Georgina Basin IOCG Project INSIGHTS FROM THE NATIONAL DRILLING INITIATIVE ● NDIBK05 and NDIBK10, were completed to depths of 293.8m and 765.7m, respectively, adjacent to Greenvale’s tenement – EL32295. ● NDIBK05&10 intersected broad zones of the Proterozoic Warramunga Formation ● Strong hematitic a

  14. Slide 14: Unlocking the Georgina Basin's Hidden Potential

    Georgina Basin IOCG Project UNLOCKING THE GEORGINA BASIN’S HIDDEN POTENTIAL ● High-res aero-mag completed over EL’s 32282, 32296 & EL32295 ● 15,261-line kms completed ● Prominent magnetic bulls-eye targets identified between interpreted regional faults and within a magnetite destructive alteration z

  15. Slide 15: Ground Gravity Results

    Georgina Basin IOCG Project GROUND GRAVITY RESULTS ● Coincident or partially offset gravity anomalies which have been observed around several of the previously identified magnetic targets. ● IOCG deposits in the Gawler Craton (e.g., Prominent Hill, Olympic Dam) magnetic and gravity anomalies are non

  16. Slide 16: Western Magnetic Anomaly

    Georgina Basin IOCG Project WESTERN MAGNETIC ANOMALY Western magnetic anomaly is partially associated with an East- West orientated gravity anomaly and has a depth to the top of the magnetic body of approximately 510m © Copyright Greenvale Mining Ltd 2021 15

  17. Slide 17: Central Tenement Area – Geophysical Surveying

    Georgina Basin IOCG Project CENTRAL TENEMENT AREA – GEOPHYSICAL SURVEYING Magnetic Survey Area ● Several emerging targets identified in Central Gravity Tenements Survey Area ● Magnetic high anomalies and structural complexity ● Follow-up high-resolution airborne magnetics at 100m line spacing – awai

  18. Slide 18: Summary

    Summary ● Alpha Torbanite Project ● Unique, high-yielding deposit with multiple marketable products ● Strategic energy-efficient and carbon-offset commercialisation pathway ● Mineral Resource Estimate due Q4 2021 ● Feasibility Study due Q1 2022 ● Georgina Basin IOCG Project ● Substantial tenement pa

  19. Slide 19: Thank You