  1. Slide 1: Productora Rising

    For personal use only PRODUCTORA RISING

  2. Slide 2: Disclaimer

    Disclaimer This presentation is provided on the basis that neither the Company nor its representatives make any warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the For personal use only Presentation and nothing contained in the Pr

  3. Slide 3: Company Overview

    Company Overview Hot Chili Limited is an ASX listed company that For personal use only has moved rapidly from explorer to project developer with three large multi-commodity copper projects in Chile.  Chile – Premier Mining Country  Strong local partners – CODELCO and CMP  Advanced Projects – Two

  4. Slide 4: Company Overview: Capital Structure and Shareholders

    Company Overview Capital Structure Top 5 Shareholders For personal use only 162.4 Million shares (47.3 Million restricted) 24.7% Kalgoorlie Auto Services 40.6 Million unlisted 20c options (32 Million restricted) 5.1% Rex Harbour (consolidated) 4.1% Panoramic Resources Cash at Hand 4.1% Taurus Funds

  5. Slide 5: Within months of listing on ASX

    Productora Within 15 months of listing on ASX For personal use only • Completed major geochemistry, airborne and mapping programmes • Productora- Completed 28,308m RC drilling and 5,600m of diamond drilling • Los Mantos- Completed 10,000m RC drilling • First resource estimate at Productora- Released

  6. Slide 6: Location / Infrastructure

    Productora Location/ Infrastructure For personal use only • Coastal Range (maximum 1,000m elevation) • Region III, 20km south of Vallenar • Adjacent to sealed road and rail, 40km to port PRODUCTORA PROJECT Significant Features • CMP- major partner and substantial shareholder • Access to active 250k

  7. Slide 7: Consolidated Land Position - 12.5km Strike Coverage

    Productora Consolidated Land Position- 12.5km Strike Coverage Consolidated Project For personal use only • 100% land positions • 100% Purchase option agreements PRODUCTORA Mineralisation Footprint • 65% Earn-in option agreements +9.5 km strike extent • Central Lease- Option to purchase 100% for US$7

  8. Slide 8: First Resource at Productora

    Productora First Resource at Productora For personal use only • Large, at-surface (no pre-strip) JORC compliant resource defined over 1.4km in central area • Breccia hosted copper-gold-molybdenum resource (sulphide ore- chalcopyrite, pyrite, bornite, molybdenite) • 400m average vertical depth of res

  9. Slide 9: First Resource at Productora

    Productora First Resource at Productora For personal use only 720m RL Plan of Block Model Resource- Grade Tonnage Curve Copper Grade Distribution Breccia Envelope 100 0.90 89.43 89.05 Operating UG Mine- 90 85.15 120m vertical 0.80 development 80 71.41 0.78 Drill holes 70 0.70 0.68 Tonnes (x1M) Grade

  10. Slide 10: Resource Distribution Along Strike

    For personal use only Tonnes 10,000,000 12,000,000 2,000,000 4,000,000 6,000,000 8,000,000 0 Productora 6821640N 101,060 572,370 South 6821720N 982,341 3,287,179 6821800N 1,966,781 6,223,058 6821880N 3,160,776 4,117,777 Inferred Tonnes Indicated Tonnes Total Grade (Cu%) Inferred Grade (Cu%) 6821960N

  11. Slide 11: Resource Distribution With Depth

    Productora Resource Distribution With Depth For personal use only Tonnes/Grade by Level (>0.1% Cu) 6,000,000 0.7 Average Depth of Resource – 400m vertical 0.6 5,000,000 0.5 4,000,000 Tonnes Grade (%Cu) 0.4 Inferred Tonnes 3,000,000 Indicated Tonnes 0.3 Indicated Grade (Cu%) 2,000,000 Inferred Grade

  12. Slide 12: Oblique View of Resource Model

    Productora Oblique View of Resource Model For personal use only View looking NNW UG Mine UG Mine Development Decline Copper Grade Ranges (%) Drill holes Block Model Resource Envelope A Central Area Lease A Cross Section B B Drill holes Copper grade distribution in resource block model Scale: 100m 12

  13. Slide 13: Long Section of Resource Model

    Productora Long Section of Resource Model For personal use only South Productora- Copper Grade Distribution Productora UG Mine- North Produced 520,000t grading 0.8 – 1.2% Copper to date 800m RL Surface Depth of oxidation 600m RL Average Resource Base Depth – 400m 400m RL Copper Grade Ranges (%) 200m

  14. Slide 14: Long Section of Resource Model - Gold

    Productora Long Section of Resource Model For personal use only South Productora-Gold Grade Distribution (>0.2g/t) North Productora UG Mine- Decline and Surface development levels 800m RL Depth of oxidation 600m RL Average Resource Base Depth – 400m Gold Grade 400m RL Ranges (g/t) 14

  15. Slide 15: Long Section of Resource Model - Moly

    Productora Long Section of Resource Model For personal use only South Productora- Moly Grade Distribution (>200ppm) Productora UG Mine- Mine North drill database used for resource grade estimate 800m RL Surface Depth of oxidation 600m RL Average Resource Base Depth – 400m 400m RL Copper Grade Ranges

  16. Slide 16: Mineralisation Footprint - The Big Picture

    Productora Mineralisation Footprint- The Big Picture For personal use only • + 9.5 km strike length IP Chargeability Response Magnetic Response Magnetite zone on west • Central Lease- First 1.4km flank of IP Anomalies- converted into resource +9.5km Strike length Northern IP Anomaly- +3km strike len

  17. Slide 17: Resource Growth Strategy

    Productora Resource Growth Strategy • Aggressive extensional drilling programme For personal use only commenced • Targeting resource expansion adjacent to, along strike and at depth • 65,000m RC and 8,000m DD- 12 month budget Target Mineralisation Copper 280 to 320 million tonnes grading 0.5 to 0.7%

  18. Slide 18: Development Strategy

    Productora Development Strategy For personal use only Commence Scoping Commence Scoping Resource Growth and Development Focus Targeting 280-320 M tonnes of open pittable resources by Q4 2013 Decision to Mine at Productora by end of 2013 18

  19. Slide 19: Productora - News Flow

    Productora Productora- News Flow For personal use only Commencement of major RC and DD drilling programme Purchase of Central Lease at Productora Commencement of economic studies Project Pipeline- News Flow Release of remaining Los Mantos drill results Commencement of stage 2 drilling at Los Mantos

  20. Slide 20: Qualifying Statements

    Qualifying Statements Target Mineralisation References to exploration target size and target mineralisation in this presentation are conceptual in nature and should not be construed as indicating For personal use only the existence of a JORC Code compliant mineral resource. Target mineralisation is