  1. Slide 1: Pricing Advisory Committee (PRAC)

    Pricing Advisory Committee (PRAC) APRIL 8, 2025 - TRANSMISSION ALLOCATORS AP R I L 8 , 2 0 2 5

  2. Slide 2: Pricing Advisory Committee Agenda

    PRICING ADVISORY COMMITTEE AGENDA APRIL 8, 2025 • PRAC website https://www.pnm.com/PRAC calendar, meeting materials, registration • Brief introductions (PNM) • PNM’s transmission allocator support and recap (PNM) • Open discussion (all) • Next PRAC meetings (PNM/all) S L I D E 2 | A P RI L 8 , 2 0 2

  3. Slide 3: 3S1W versus 12CP Transmission Allocation

    3S1W VERSUS 12CP TRANSMISSION ALLOCATION Examine Historical Data • System has evolved where less than half of the total transmission is used by PNM retail, since a significant portion of PNM transmission system demand is driven by FERC wholesale transmission customers (i.e., point-to-point and netwo

  4. Slide 4: Slide Overview

    SLIDE OVERVIEW Slide 5 – Transmission Map Slide 6 – 2016 PNM firm load Slide 7 – 2016 Path 48 Flows Highest Usage Summer Months Slide 8 – 2024 PNM firm load Slide 9 –2024 Path 48 Flows Highest Usage Non- Summer Months Slide 10 – 2024 Eastern NM Transmission Flows Slide 11 – 2024 PNM Solar Resource O

  5. Slide 5: Transmission Map

    TRANSMISSION MAP Negative South to North Flows The lines shown Path 48 transmission cut-in red represent Positive set the primary North to backbone South Flows transmission lines in New Mexico. Positive West to East Negative Lower-voltage Flows West to East lines, depicted Flows in green and blue, s

  6. Slide 6: 2016 - PNM Firm Load

    2016 - PNM FIRM LOAD PNM's peak loads are primarily concentrated in the late afternoon and early evening hours during the summer months and one winter month as well. PNMFIRMLoad(MW) Month 1 2 3 4 5 6 7 8 9 10 11 12 1 1312 1096 1076 909 940 1155 1215 1210 1102 975 1175 1139 2 1287 1065 1071 892 921 1

  7. Slide 7: 2016 – Path 48 Flows

    2016 – PATH 48 FLOWS Path 48 flows have historically aligned closely with PNM's retail load demands, driven by importing base-load resources from Palo Verde, Four Corners, and San Juan. Path48(MW) Month 1 2 3 4 5 6 7 8 9 10 11 12 1 1312 1096 1076 909 940 1155 1215 1210 1102 975 1175 1139 2 1287 1065

  8. Slide 8: 2024 - PNM Firm Load

    2024 - PNM FIRM LOAD Currently, PNM's peak loads are primarily concentrated in the late afternoon during the summer months. PNM FIRM Load (MW) Month 1 2 3 4 5 6 7 8 9 10 11 12 1 1153 1115 1056 982 1001 1170 1163 1204 1091 1022 1113 1184 2 1136 1100 1044 968 975 1127 1121 1166 1056 1002 1096 1166 3 1

  9. Slide 9: 2024 – Path 48 Flows

    2024 – PATH 48 FLOWS Path 48 flows no longer align closely with retail loads and now occur year-round, as observed. Path 48 (MW) Absolute Values Month 1 2 3 4 5 6 7 8 9 10 11 12 To better understand 1 2 639 643 601 631 668 646 580 574 631 608 481 495 413 434 474 535 482 507 481 471 492 507 563 607 t

  10. Slide 10: 2024 – Eastern NM Transmission Flows

    2024 – EASTERN NM TRANSMISSION FLOWS ENM transmission (MW) Month 1 2 3 4 5 6 7 8 9 10 11 12 1 1119 1437 1504 1402 1217 1024 849 756 836 1158 1289 1437 2 1147 1473 1500 1347 1163 1038 846 675 761 1156 1321 1431 3 1123 1452 1470 1335 1115 987 801 616 705 1130 1338 1404 4 1111 1427 1405 1300 1124 917 7

  11. Slide 11: 2024 – Solar Output

    2024 – SOLAR OUTPUT Solar (MW) Month 1 2 3 4 5 6 7 8 9 10 11 12 1 -2 -2 -2 -2 -2 -2 -2 -2 -2 -2 -3 -3 2 -1 -2 -2 -2 -2 -2 -2 -2 -2 -2 -3 -3 3 -1 -1 -2 -2 -2 -2 -2 -2 -2 -2 -2 -3 4 -2 -1 -2 -2 -2 -2 -2 -2 -2 -2 -3 -3 5 -2 -1 -2 -2 -2 -2 -2 -2 -2 -2 -2 -3 6 -2 -2 -2 7 76 88 52 7 -1 -2 -3 -3 7 -2 -1 39

  12. Slide 12: Summary

    SUMMARY Historically, investments in the bulk transmission system enabled PNM to expand the delivery of power, primarily from base-load generating resources, to load centers. These investments were closely tied to growth in retail demand, which was largely driven by summer load. In recent years, how

  13. Slide 13: Open Discussion

    OPEN DISCUSSION • PRAC comments or concerns • Questions • Initial thoughts on Distribution Allocators Need for change? Recommended changes? S L I D E 1 3 | A PR I L 8 , 2 0 2 5

  14. Slide 14: Next PRAC Meetings

    NEXT PRAC MEETINGS • Mid April Subcommittee Meeting for Generation Allocators • May 13 Distribution allocators • Summer break • August 12 – December 9 Default TOD/ Net metering Registration for the remaining 2025 meetings is available on the PRAC webpage S L I D E 1 4 | A PR I L 8 , 2 0 2 5

  15. Slide 15: Slide 15