Global Lithium Resources Ltd. · ASX:GL1

Global Lithium Resources — Investor Presentation (May 2021)

22 slides from Global Lithium Resources's investor presentation, May 2021

  1. Slide 1: Pilbara Focussed Lithium Explorer - Corporate Presentation

    PILBARA FOCUSSED LITHIUM EXPLORER Corporate Presentation May 2021 ASX: GL1

  2. Slide 2: Important notice & disclaimer

    Important notice & disclaimer Important Notice and Disclaimer • These presentation materials and the accompanying verbal presentation (together, the Presentation Materials) have been prepared by Global Lithium Resources Limited (Global Lithium or Company). By receiving the Presentation Materials, yo

  3. Slide 3: Introduction: Positioned for success

    Introduction Positioned for success 1 ● Heavily oversubscribed $10m IPO completed May 2021 ● Attractive valuation relative to ASX lithium peer group ● Credible leadership team assembled Pilbara-focussed lithium explorer 2 ● Marble Bar Lithium Project (MBLP) located within the Tier-1 Pilbara lithium

  4. Slide 4: Corporate overview

    Corporate overview Corporate Structure Global Lithium at a Glance IPO Price $0.20 • Established in 2018 Shares on Issue 131.8m • Founded by experienced resource professional Dr Dianmin Chen, backed by high-net-worth investors Options on Issue 4.8m • Archer has a JORC Inferred Mineral Resource of 10.

  5. Slide 5: Leadership team

    Leadership team Jamie Wright Warrick Hazeldine Dr Dianmin Chen Kevin Hart Joanne Day Dr Jayson Meyers Ian Shackleton Managing Non-Executive Non-Executive CFO & Company Administration Technical Exploration Director Chair Director Secretary Manager Specialist Manager ● Mining executive with ● Founding

  6. Slide 6: Marble Bar Lithium Project (MBLP)

    Marble Bar Lithium Project (MBLP) ● Emerging hard rock lithium discovery 180km SE of Port Hedland Geology ● Strategic land holding situated in the North Pilbara Craton, one of the world’s major lithium and tantalum provinces ● Focus to date has been on discovering and exploring the Archer Deposit Ar

  7. Slide 7: Exploration program underway – drill rig turning

    Exploration program underway – drill rig turning • RC Program underway May 2021 – Early works program completed in parallel with IPO process to identify drilling targets and immediately commence exploration – 4,000m program commenced May 2021 with Profile Drilling – Focus on in-fill and extensional

  8. Slide 8: World-class location, logistics & infrastructure

    World-class location, logistics & infrastructure World class lithium projects nearby Sealed Marble Bar Road Sealed Marble Bar Airstrip Borefield on GL1’s tenement Favourable Topography and Easy Road Access Marble Bar Port Hedland 8

  9. Slide 9: Highly prospective geological setting in the Pilbara

    Highly prospective geological setting in the Pilbara • The MBLP is a hard-rock lithium project located in the North Pilbara Craton, host to one of the world’s major pegmatite hosted spodumene lithium and tantalum provinces • Notable hard-rock lithium pegmatite deposits in the area include: – Pilgang

  10. Slide 10: The Archer Deposit

    The Archer Deposit ● Multiple spodumene pegmatite dykes striking north-south, shallow dip to the east ● A number of surface expressions and blind dykes found by drilling Geology ● Pegmatite zone identified over 3km by 1km zone ● Average vertical depth ~110 – 120m (limited by drilling) ● Currently op

  11. Slide 11: The Archer Deposit – growth potential through deeper, in-fill and step-out drilling

    The Archer Deposit – growth potential through deeper, in-fill and step-out drilling 11

  12. Slide 12: Exploration drivers

    Exploration drivers • Initial prospective area for LCT pegmatites of over 20km2 already identified >20km2 prospective area – Defined by soil geochemical survey, airborne to explore geophysics, airborne interpretation and outcropping pegmatites – In the ‘right zone’: adjacent to the Moolyella tin fie

  13. Slide 13: Work program

    Work program Phase 1 – Grow the Archer Deposit • Phase 1 – Seek to grow the Archer Deposit – Step-out RC drilling to target extensions to the deposit – RC in-fill drilling to improve knowledge in geology and grade Phase 3 – and to assist improve Mineral Resource categories Explore the larger – Diamo

  14. Slide 14: Indicative timeline

    Indicative timeline Q2 Q3 Q4 2021 2021 2021 Phase 1 Program Underway • Initial 4,000m RC program underway • 600-800m diamond program + metallurgical program Phase 2 / 3 Drilling Program • Subject to approvals Target Resource Update Figure: 2020 RC drilling campaign delivering results at the Archer D

  15. Slide 15: EV's are now a global mega trend…

    EV’s are now a global mega trend… • EV1 take-up driven by policy and consumer sentiment – Global trend to push for carbon neutrality via renewables – EVs and energy storage key beneficiaries – EU is targeting net zero carbon emissions by 2050. US Administration likely to follow – China and Europe le

  16. Slide 16: …and the Lithium price responding

    …and the Lithium price responding • Lithium is a key raw material in batteries 2,000 – Raw materials required to enable the EV revolution Global Lithium Supply & Demand (kt LCE1) – Fast paced downstream developments are triggering supply constraints in the lithium market Market Demand / Supply kt LC

  17. Slide 17: EV / Resource (3 May 2021)

    EV1 / Resource2 (3 May 2021) EV/Resource (A$/tonne Li2O3) – select ASX peers $3,026/t $1,452/t $662/t $470/t $150/t $97/t Project2 Piedmont Finniss Authier Wolfsberg Archer4 Dome North (ASX:PLL) (ASX:CXO) (ASX:SYA) (ASX:EUR) (ASX:GL1) (ASX:ESS) Location North Carolina Northern Territory Quebec Austr

  18. Slide 18: Sustainability

    Sustainability Strong ESG framework to create value for all stakeholders v v v ENVIRONMENT SOCIAL GOVERNANCE Commitment to minimise Engage local suppliers Integrate best practice ground disturbance, and recognition of environmental and social emissions and water usage Traditional Owners standards in

  19. Slide 19: Global Lithium: emerging Pilbara lithium explorer

    Global Lithium: emerging Pilbara lithium explorer Valuable position in Maiden 10.5Mt @ Tier-1 Pilbara lithium 1.0% Li2O Inferred Access to province Mineral Resource world-class with clear growth infrastructure potential Strong pipeline of Resource expansion news flow expected and exploration over ne

  20. Slide 20: Appendices

    APPENDICES The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports, and that the form and context in which the Competent Persons findings are presented have not been materially modified from the original reports. Where

  21. Slide 21: Appendix: detailed project data

    Appendix: detailed project data Peer Group Comparison Data1 Mineral Mineral Mineral Mineral Cash & Debt Market Enterprise Resource Cash Debt Resource Resource Resource ASX Company Project Capitalisation Value ASX (Tonnage) (Li2O Grade) (cont. Li2O) Announcement Name Name Announcement A$m A$m A$m A$m

  22. Slide 22: Contact us

    ASX: GL1 https://au.linkedin.com/company/ global-lithium-resources @Global_Lithium SUBSCRIBE Subscribe to our mailing list at: www.globallithium.com.au CONTACT US Victoria Humphries Jamie Wright Media and Investor Relations +61 8 6103 7488 +61 (0) 431 151 676 info@globallithium.com.au Victoria@nwrco