Peninsula Energy Limited · ASX:PEN
Peninsula Energy — Shareholder Meeting (November 2026)
25 slides from Peninsula Energy's shareholder meeting presentation, November 2026

Slide 1: 2026 Annual General Meeting Presentation
rsonal use only 2026 Annual General Meeting Presentation George Bauk, Managing Director & CEO | 23 November 2026 PEL.NET.AU | 23 November 2026 ASX: PEN OTCQB:1 PENMF

Slide 2: Important Disclosures and Disclaimers
Important Disclosures and Disclaimers Summary The Company believes it has a reasonable basis for providing the forward-looking statements and production targets included in this Presentation. This Presentation contains summary information about the current activities of Peninsula Energy Limited (the

Slide 3: Important Disclosures and Disclaimers
Important Disclosures and Disclaimers Production Target This Presentation contains data and information sourced from independent third parties and government sources, and the Company makes no representation, whether express or implied, as to the accuracy of such data or information. The production g

Slide 4: Investment Highlights
Investment Highlights A constructed US uranium platform advancing from commissioning complexity toward repeatable wellfield performance rsonal use only 59Mlbs 2.0Mlbs p.a. 0.6Mlbs Lance JORC 2012 Mineral Resource Installed CPP nameplate capacity in Contracts Strengthened technical capability Improvi

Slide 5: Corporate Overview
Corporate Overview Share Price Market Cash Debt A$0.16 | US$0.11 Capitalisation US$33.6M US$30.0M rsonal use only A$91M | US$61M At 30 September 2026 $1.20 35.0 M Securities on Security code & description 30.0 M Issue $1.00 PEN: Ordinary Shares 571,565,353 25.0 M $0.80 PENAAC: Options 4,043,467 (Exp

Slide 6: Refreshed Board and Executive Leadership
Refreshed Board and Executive Leadership rsonal use only Mr George Bauk Mr David Coyne Mr Keith Bowes Ms Tejal Magan Managing Director / CEO Non-Executive Chair Non-Executive Director Non-Executive Director Mr Bauk has over 30 years of global Mr Coyne has over 30 years of global Mr Bowes, BSc (Chemi

Slide 7: Site Leadership Team – Deep In-Country ISR Experience
Site Leadership Team – Deep In-Country ISR Experience Mr Brian Pile Mr Ken Milmine rsonal use only Interim SVP Operations and Development VP OH&S, Approvals Mr Pile has over 25 years of professional experience, having worked directly on Mr Milmine has almost 30 years of regulatory, environmental, he

Slide 8: The Top Uranium Jurisdiction in the USA
The Top Uranium Jurisdiction in the USA LANCE IS STRATEGICALLY POSITIONED TO BECOME A CORNERSTONE URANIUM PRODUCER TO CLOSE THE URANIUM SUPPLY GAP rsonal use only Wyoming, USA Lance Project Central Processing Plant, constructed for 2Mlbs U3O8 p.a. and fully licensed for production up to 3Mlbs U3O8 p

Slide 9: Production Status
rsonal use only Production Status 9

Slide 10: Wellfield Operations – MU-4 Progress and Operating Learnings
Wellfield Operations – MU-4 Progress and Operating Learnings Description DAF Injection Co-Mingling Peroxide Soft Calcite rsonal use only (Dissolved Air Filtration Addition Acidification3 Dissolution Flotation) During Control Measures HH-14 No Yes1 Yes2 Acidification No No HH-15 Yes Yes No Production

Slide 11: Off-take Position
Off-take Position Highly leveraged to spot uranium prices with minimal contracted pounds rsonal use only One contract in place for 600,000lbs1 • 100,000lbs per annum 2028 – 2033 (post ramp-up) • Blend of base price (escalated) plus market price • Take-or-pay commitments remain in place Note (1) The

Slide 12: Future Growth
rsonal use only Future Growth 12

Slide 13: Lance – Already Very Large, But Still Lots of Potential to Grow
Lance – Already Very Large, But Still Lots of Potential to Grow Largest known ISR project in Wyoming, USA – 59Mlbs Permit Area Tonnage (Mt) Grade (ppm U3O8) U3O8 million lbs Exploration Target of 104 – 163 Mlbs U3O8 based on a combination Ross rsonal use only Measured 1.9 520 2.2 of past exploration

Slide 14: Kendrick Development Project
Kendrick Development Project Kendrick is the next sequential production area following production at the Ross Area rsonal use only Project area is fully permitted to commence mining operations, with all approvals received from Wyoming Department of Environmental Quality (WDEQ) and EPA Project area s

Slide 15: Regional and Satellite Growth Pipeline
Regional and Satellite Growth Pipeline Kendrick • Fully-permitted rsonal use only • Development underway – 2026 • Optimisation studies to be reviewed • Plan to convert resources from Inferred to Indicated Barber • Large, under-delineated Inferred Resource • Plan to convert resources from Inferred to

Slide 16: The Strategic Context
rsonal use only The Strategic Context 16

Slide 17: Uranium Demand Growth Outpacing Supply
Uranium Demand Growth Outpacing Supply Uranium demand growth, energy security and the need for new primary supply are increasing the strategic value of constructed US production platforms rsonal use only Demand Growth • Global uranium demand forecast to increase materially to 2040 • Nuclear increasi

Slide 18: Positioned to be a Meaningful USA Uranium Supplier
Positioned to be a Meaningful USA Uranium Supplier Peninsula offers a rare opportunity to invest in a near- term, scalable US uranium producer 56Mlbs 2.2Mlbs rsonal use only Existing production platform • Fully permitted ISR operation in Wyoming • Fully constructed and licensed CPP • Dried yellowcak

Slide 19: Summary
ersonal uSe only Summary. PENINSULA, ENERGY

Slide 20: Peninsula is advancing toward repeatable, sustainable wellfield performance
Peninsula is advancing from commissioning complexity toward rsonal use only repeatable, sustainable wellfield performance supported by a constructed US production platform, a large resource base, and stronger technical discipline and staged growth 20

Slide 21: Contact
CONTACT Email info@pel.net.au rsonal use only Phone +61 8 9380 9920 ASX: PEN OTCQB: PENMF 21

Slide 22: Appendices
22 rsonal use only Appendices

Slide 23: Appendix – Resources
Appendix 1 – Resources Lance Project Resource Estimate as at 31 December 20251 rsonal use only U3O8 Metal Classification Tonnes (million) Grade (ppm U3O8) (Mlbs) Measured 3.8 520 4.3 Indicated 11.7 510 12.9 Inferred 38.5 490 41.7 Total 53.9 500 59.0 Dagger Resource Estimate as at 23 October 20232 U3

Slide 24: Appendix – Lance Exploration Project (Additional Disclosure)
Appendix 2 – Lance Exploration Project (Additional Disclosure) Exploration Target1 rsonal use only The Lance Project covers a significant proportion of the Powder River Basin. Cretaceous sandstones of Wyoming, which are believed to represent an Exploration Target of between 104Mlbs and 163Mlbs eU3O8

Slide 25: Appendix – Resource references
Appendix 3 – Resource references Measured MLBS Measured Grade Indicated MLBS Inferred Grade Inferred MLBS Inferred Grade Source Cameco North Butte - Brown Ranch 1.1 0.08 8.4 0.07 0.4 0.07 https://www.cameco.com/sites/default/files/documents/202 rsonal use only Smith Ranch-Highland 7.9 0.1 0.05 17 7.
Source: ASX announcement, Nov 23, 2026
More decks from Peninsula Energy Limited
Mining Forum Americas 202625 slides · Sep 30, 2026
Investor Presentation (May 2026)58 slides · May 14, 2026
Resources Rising Stars Summer Series Conferences 202635 slides · Feb 10, 2026
Investor Presentation (August 2025)56 slides · Aug 22, 2025
Investor Presentation (January 2025)18 slides · Jan 14, 2025
Shareholder Meeting (November 2024)27 slides · Nov 21, 2024