  1. Slide 1: A US uranium platform with near-term operating leverage and district scale upside

    rsonal use only A US uranium platform with near-term operating leverage and district scale upside Mining Forum Americas | Colorado Springs George Bauk, Managing Director PEL.NET.AU | 29 September 2026 ASX: PEN OTCQB:1 PENMF

  2. Slide 2: Important Disclosures and Disclaimers

    Important Disclosures and Disclaimers Summary The Company believes it has a reasonable basis for providing the forward-looking statements and production targets included in this Presentation. This Presentation contains summary information about the current activities of Peninsula Energy Limited (the

  3. Slide 3: Important Disclosures and Disclaimers

    Important Disclosures and Disclaimers Production Target This Presentation contains data and information sourced from independent third parties and government sources, and the Company makes no representation, whether express or implied, as to the accuracy of such data or information. The production g

  4. Slide 4: Investment Highlights

    Investment Highlights A constructed US uranium platform moving from commissioning complexity toward repeatable wellfield performance 59Mlbs 2.0Mlbs p.a. 0.6Mlbs rsonal use only Lance JORC 2012 Mineral Resource Installed CPP nameplate capacity in Contracts Strengthened technical expertise A growing l

  5. Slide 5: Corporate Overview

    Corporate Overview1 Share Price2 Market Cap2 Cash3 Debt4 US$0.18 US$104M US$22.1M US$30.0M rsonal use only (A$0.26) (A$149M) At 30 June, excluding US$30m drawdown in July $1.20 35.0 M Securities on Security code & description 30.0 M Issue $1.00 PEN: Ordinary Shares 571,527,409 25.0 M $0.80 PENAAC: O

  6. Slide 6: Refreshed Board and Executive Leadership

    Refreshed Board and Executive Leadership rsonal use only Mr George Bauk Mr David Coyne Mr Keith Bowes Ms Tejal Magan Managing Director / CEO Non-Executive Chairman Non-Executive Director Non-Executive Director Mr Bauk has over 30 years of global Mr Coyne has over 30 years of global Mr Bowes, BSc (Ch

  7. Slide 7: Site Leadership Team – Deep In-Country ISR Experience

    Site Leadership Team – Deep In-Country ISR Experience Mr Brian Pile Mr Ken Milmine rsonal use only Interim SVP Operations and Development VP OH&S, Approvals Mr Pile has over 25 years of professional experience, having worked directly on Mr Milmine has almost 30 years of regulatory, environmental, he

  8. Slide 8: The Top Uranium Jurisdiction in the USA

    The Top Uranium Jurisdiction in the USA LANCE IS STRATEGICALLY POSITIONED TO BECOME A CORNERSTONE URANIUM PRODUCER TO CLOSE THE URANIUM SUPPLY GAP rsonal use only Wyoming, USA Lance Project Central Processing Plant, constructed for 2Mlbs U3O8 p.a. and fully licensed for production up to 3Mlbs U3O8 p

  9. Slide 9: Production Status

    rsonal use only Production Status 9

  10. Slide 10: Wellfield Operations

    WELLFIELD OPERATIONS Header House Operating Condition Summary Description DAF Injection Co-Mingling Peroxide Soft Calcite (Dissolved Filtration Addition Acidification3 Dissolution rsonal use only Air During Control Flotation) Measures HH-14 No Yes1 Yes2 Acidification No No HH-15 Yes Yes No Productio

  11. Slide 11: Off-take Position

    Off-take Position Highly leveraged to spot uranium prices with minimal contracted pounds rsonal use only One contract in place for 600,000lbs1 • 100,000lbs per annum 2028 – 2033 (post ramp-up) • Blend of base price (escalated) plus market price • Take or pay commitments remain in place Note (1) The

  12. Slide 12: Future Growth

    rsonal use only Future Growth 12

  13. Slide 13: Lance – Already Very Large, But Still Lots of Potential to Grow

    Lance – Already Very Large, But Still Lots of Potential to Grow Largest known ISR project in Wyoming, USA – 59Mlbs Permit Area Tonnage (Mt) Grade (ppm U3O8) U3O8 million lbs Exploration Target of 104 – 163 Mlbs U3O8 based on a combination Ross rsonal use only Measured 1.9 520 2.2 of past exploration

  14. Slide 14: Kendrick Development Project

    Kendrick Development Project Kendrick is the next sequential production area following production at the Ross Area rsonal use only Project area is fully permitted to commence mining operations, with all approvals received from Wyoming Department of Environmental Quality (WDEQ) and EPA Project area s

  15. Slide 15: Regional and Satellite Growth Pipeline

    Regional and Satellite Growth Pipeline Kendrick • Fully-permitted rsonal use only • Development underway – 2026 • Optimisation studies to be reviewed • Plan to convert resources from inferred to indicated Barber • Large, under-delineated inferred resource • Plan to convert resources from inferred to

  16. Slide 16: The Strategic Context

    rsonal use only The Strategic Context 16

  17. Slide 17: Uranium Demand Growth Outpacing Supply

    Uranium Demand Growth Outpacing Supply The uranium market is entering a structurally undersupplied phase, requiring new primary production rsonal use only Demand Growth • Global uranium demand forecast to increase materially to 2040 • Nuclear increasingly recognized as critical for: • Energy Securit

  18. Slide 18: Positioned to be a Meaningful USA Uranium Supplier

    Positioned to be a Meaningful USA Uranium Supplier Peninsula offers a rare opportunity to invest in a near- term, scalable US uranium producer 56Mlbs 2.2Mlbs rsonal use only Existing production platform • Fully permitted ISR operation in Wyoming • CPP constructed and largely commissioned • Productio

  19. Slide 19: Summary

    ersonal USe only Summary PENINSULA, ENERGY

  20. Slide 20: Peninsula is moving from commissioning complexity toward repeatable wellfield performance

    Peninsula is moving from commissioning complexity toward rsonal use only repeatable wellfield performance supported by a constructed US production platform, a large resource base, and a disciplined approach to growth 20

  21. Slide 21: Contact

    CONTACT Email info@pel.net.au rsonal use only Phone +61 8 9380 9920 ASX: PEN OTCQB: PENMF 21

  22. Slide 22: Appendices

    22 rsonal use only Appendices

  23. Slide 23: Appendix – Resources

    Appendix 1 – Resources Lance Project Resource Estimate as at 31 December 20251 rsonal use only U3O8 Metal Classification Tonnes (million) Grade (ppm U3O8) (Mlbs) Measured 3.8 520 4.3 Indicated 11.7 510 12.9 Inferred 38.5 490 41.7 Total 53.9 500 59.0 Dagger Resource Estimate as at 23 October 20232 U3

  24. Slide 24: Appendix – Lance Exploration Project (Additional Disclosure)

    Appendix 2 – Lance Exploration Project (Additional Disclosure) Exploration Target1 rsonal use only The Lance Project covers a significant proportion of the Powder River Basin. Cretaceous sandstones of Wyoming, which are believed to represent an Exploration Target of between 104Mlbs and 163Mlbs eU3O8

  25. Slide 25: Appendix – Resource references

    Appendix 3 – Resource references Measured MLBS Measured Grade Indicated MLBS Inferred Grade Inferred MLBS Inferred Grade Source Cameco North Butte - Brown Ranch 1.1 0.08 8.4 0.07 0.4 0.07 https://www.cameco.com/sites/default/files/documents/202 rsonal use only Smith Ranch-Highland 7.9 0.1 0.05 17 7.