Greentech Metals Ltd. · ASX:GRE
Greentech Metals — Gold Coast Investment Showcase 2022
16 slides from Greentech Metals's conference presentation, Jun 22, 2022
Slide 1: Discovering Tomorrow's Metal TODAY
Discovering Tomorrow’s Metal TODAY 22 June 2022
Slide 2: Investment Proposition
Investment Proposition Low enterprise High quality project Getting on with business value portfolio, providing across projects since exposure to January IPO ~93Kt electrification metals Cu, Ni, Zn & PGE’s 4974m drilled from 32 holes ~$8m Cu + Zn Metal in resources across two project Highly-experienc
Slide 3: Market Information
Market Information Market Cap Market $11.37m ASX Shares on issue Ticker 45.5m GRE Share Options Average daily 8.75m traded volume 169,239 Major Shareholders Artemis Resources Ltd 14.84% Sorrento Resources Pty Ltd 8.24% Bennelong Pty Ltd 6.81% Top 20 53.38% As of 21th June 2022 3 CORPORATE PRESENTATI
Slide 4: Electrification needs metal
Electrification needs metal Electrification cannot happen without the metals Greentech holds - Cu, Ni, Zn, Co, Ag and PGE’s Short Term Forecast Demand 31.0 4.0 28.0 3.5 14 x 10 x 25.0 Ni (Mtpa) Cu, Zn (Mtpa) 22.0 3.0 Substantial demand growth is 19.0 forecast from the EV industry alone 2.5 over the
Slide 5: Copper/Nickel Solid Fundamentals
Copper/Nickel Solid Fundamentals Prices for both Cu and Ni have increased with Copper price US$/lb Nickel price US$/T demand, a trait that is forecast to continue well into the future. source: tradingeconomics.com 5 CORPORATE PRESENTATION
Slide 6: Project Portfolio - Unlocking the Pilbara's Base and Precious Metal Potential
Project Portfolio - Unlocking the Pilbara’s Base and Precious Metal Potential 6 CORPORATE PRESENTATION
Slide 7: Project summary – Drill Ready Targets
Project summary – Drill Ready Targets o 225 km under tenure 2 o Granted ML’s at Whundo/Ayshia o Multiple direct daily air service from Perth o Excellent infrastructure and logistic support o Prospective for mafic intrusion hosted NiS and VMS style Cu-Zn-Co deposits o 0.5Mta processing plant at Radio
Slide 8: Whundo – Resource Growth Potential
Whundo – Resource Growth Potential Early Drilling Targeted Resource Growth Section E-F F o Maiden drilling program of 32 holes for 4,974m completed o Designed to target immediate SHELBY resource growth opportunities and ensure resource confidence o Results received for 22 of 32 holes o Outstanding r
Slide 9: Whundo – Spatial Relationship of Prospects
Whundo – Spatial Relationship of Prospects E F Multiple Near-Mine Drilling Targets o Historic drilling focussed on the Whundo resource area, areas outside of the main deposit is considered under- tested or untested by Surface/underground drilling. workings o A previous VTEM survey highlighted numero
Slide 10: Whundo – Copper-Zinc
Whundo – Copper-Zinc An advanced Exploration asset o An area of ~9 km² located ~40km south-southwest of Karratha, Western Australia, within the West Pilbara Mineral Field. o Whim Creek Consolidated NL open pit mine produced 6,700 tonnes at 27.4% copper during it’s one year of operation (1976). o Fox
Slide 11: Ayshia – Additional Cu-Zn Resource
Ayshia – Additional Cu-Zn Resource A second advanced Exploration asset o Located 1500m east of Whundo Mine o Presents at surface as a narrow discontinuous zinc rich gossan and has no associated surface workings o First drilled in 2006 by Fox Resources o Mineralisation is zinc dominant in the upper p
Slide 12: Osborne – Nickel
Osborne – Nickel (Greentech-Artemis JV- GRE earning 51%) Drill Ready Nickel Targets o Osborne is one of two nickel targets identified through airborne geophysics and follow-up detailed ground surveys o A FLTEM survey comprising five NW-SE trending lines was completed over Osborne, identifying one co
Slide 13: Ruth Well – Nickel-Copper
Ruth Well – Nickel-Copper A third advanced Exploration asset o An area of ~58km2 located approximately 15km south of Karratha, Western Australia, within the West Pilbara Mineral Field. o The Ruth Well nickel–copper deposit was discovered in 1971. o The Ruth Well project is covered by four exploratio
Slide 14: Upcoming Work Program
Upcoming Work Program Whundo/Ayshia Project – Follow-up drilling at Ayshia, Incorporation of new results into Yannery and Shelby as Ayshia – Maiden JORC Resource Models. warranted, following resource Follow-up down hole GPX. Ground geophysical interpretation completed gravity over Shelby and Yannery
Slide 15: Multiple Catalysts for Investors
Multiple Catalysts for Investors ~50% resource growth at Drill testing of highly Highly experienced team with a Whundo (inc Ayshia) Cu-Zn prospective Cu/Zn/Ni targets track record of successfully Project since Jan IPO at Osborne, Ruth Well, Shelby and identifying and acquiring green Yannery energy m
Slide 16: Forward-Looking Statements and Competent Person Statement
Forward-Looking Statements Competent Person Statement Statements in this announcement which are not statements of historical facts, The information in this report that relates to Exploration Targets, including but not limited to those relating to the proposed transaction, are Exploration Results, Mi
Greentech Metals — Gold Coast Investment Showcase 2022 on 6ix