Corazon Mining Limited · ASX:CZN

Corazon Mining — RIU Conference 2019

24 slides from Corazon Mining's conference presentation, Feb 19, 2019

  1. Slide 1: Company Presentation

    Company Presentation 19-21 February 2019 LEVEL 1, 329 HAY ST, SUBIACO WA 6008 | PO BOX 8187, SUBIACO EAST WA 6008 | +61(8) 6142 6366 | INFO@CORAZON.COM.AU | WWW.CORAZON.COM.AU 1 1

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement This presentation has been prepared by Corazon Mining Limited (Corazon). It contains forecasts and forward looking statements which are not a guarantee of future performance and which involve certain risks. Actual results and future outcomes will in all likelihood differ fr

  3. Slide 3: Corporate Overview

    Corporate Overview ASX: CZN Shareholders Total Ordinary Shares on Issue 1.265m Top 20 Shareholders 38% Options on issue 145m Board and Management 1.74% Market Capitalisation ($0.005/share) $6.33m Hanking Australia Investments 11.54% Share Price Trading Range (1 year) $0.003-$0.018 Crescent Nominees

  4. Slide 4: Two Quality Projects

    Two Quality Projects Lynn Lake Nickel-Copper-Cobalt Old Mining Centre Large JORC Resource Base Redevelopment Opportunity Exciting Ni Sulphide Exploration Play Mt Gilmore Cobalt-Copper-Gold Newly Recognised Area Large District Scale Target Cobalt Dominant Sulphide Mineralisation 4

  5. Slide 5: Booming Rechargeable Battery Sector

    Booming Rechargeable Battery Sector Tr adi t i onal Emer gi ng Ener gy Sour ces Ener gy Sour ces Ur bani sat i on  Desire and demand for alternate  Growth in traditional energy renewable energy sources sector not supported publicly and will struggle to keep pace with demand  Rapid unprecedented c

  6. Slide 6: Booming Rechargeable Battery Sector

    Booming Rechargeable Battery Sector Tr adi t i onal Emer gi ng Ener gy Sour ces Ener gy Sour ces Ur bani sat i on Despite overwhelming public  Desire and demand for alternate  Growth in traditional energy sentiment for renewable energy sources sector not supported publicly and will struggle to kee

  7. Slide 7: Mt Gilmore Project New South Wales

    Mt Gilmore Project New South Wales

  8. Slide 8: Mt Gilmore Project – Point of Difference

    Mt Gilmore Project – Point of Difference THE COBALT RIDGE PROSPECT  First World location +90% of metal captured in <10% of the mass feed  Cobalt dominant sulphide mineralisation via simple flotation  Simple, low capital processing options processing Mt Gilmore  Quality products Grafton Sulphide

  9. Slide 9: Mt Gilmore Project - Cobalt Ridge Prospect

    Mt Gilmore Project - Cobalt Ridge Prospect DETAILED EXPLORATION OVER A SMALL AREA  99 drill holes for 12,684.67 metres  Close-spaced surface soil and rock chip sampling  Mineral petrology  Metallurgical testwork  Detailed geophysics (IP-Mag-Rad)  Environmental baseline studies  Environmental

  10. Slide 10: Mt Gilmore Project - Cobalt Ridge Prospect

    Mt Gilmore Project - Cobalt Ridge Prospect QUARTZ-TOURMALINE BRECCIAS UNTESTED POTENTIAL SPATIALLY ASSOCIATED WITH 8 %Co 2m @ 0.64 %Co, 1.66 COBALT-COPPER MINERALISATION (Historical Workings) %Cu, 0.13 g/tAu in Reconnaissance Drilling  Tourmaline is a common mineral within hydrothermal deposits – t

  11. Slide 11: Mt Gilmore Project – Recent Results

    Geology + Copper Mt Gilmore Project – Recent Results in Soils Image COBALT RIDGE ONE PROSPECT WITHIN A LARGE PROJECT AREA  Multiple occurrences of late-1800’s / early-1900’s copper/gold workings  NEW discovery by CZN - “district scale” geochemical anomaly coincident with basement of the Mt Gilmore

  12. Slide 12: Mt Gilmore Project – Recent Results

    Mt Gilmore Project – Recent Results GEOCHEMICAL ANOMALIES UNDERPINNED BY HIGH-TENOR ROCK SAMPLES  The recognition that numerous historical small scale workings are part of a much larger system is a significant advancement for the Project  High-grade mineralisation interpreted as “leakage structure

  13. Slide 13: Mt Gilmore Exploration – Several Substantial Priority Anomalies

    Mt Gilmore Exploration – Several Substantial Priority Anomalies FAVOURABLE GEOLOGICAL SETTING May Queen Cu-Co-Ag-Zn-Mo-Bi-Se-In-Cd-Ga+As-Sb  Hydrothermally altered basaltic and volcano- sedimentary basement rocks Lantana  Hydrothermal event associated with a mafic Cu-Co-Ag-Zn-As-Au-Sb-Mo-Bi-Se-In-

  14. Slide 14: Mt Gilmore Trend – Strong Multi-Element Association

    Mt Gilmore Trend – Strong Multi-Element Association COPPER COBALT SILVER Soil Sampling Assay Images Geochemical images generated from a dataset only containing ME-MS61 assays, subset on a 200m x 200m grid with image using a north-eastern sun-angle 14 Cobalt data is further subset to exclude soils po

  15. Slide 15: Mt Gilmore Exploration – Several Substantial Priority Anomalies

    Mt Gilmore Exploration – Several Substantial Priority Anomalies EXPLORATION UNDERWAY  New target areas to be mapped in detail and rock-chip sampled if required  Approximately 40 line kilometres of ground IP geophysics has been planned as an initial test of the three main target areas – currently t

  16. Slide 16: Mt Gilmore Project – Summary

    Mt Gilmore Project – Summary UNIQUE, EARLY STAGE, DISTRICT-SCALE EXPLORATION PLAY  Surface mineralisation supports evidence of a large hydrothermal system at Mt Gilmore  Indicative of “Intrusive Related” or “Replacement” style of deposits  The size of the geochemical anomalies are substantive  T

  17. Slide 17: Lynn Lake Project Canada

    Lynn Lake Project Canada CORAZON MINING LIMITED

  18. Slide 18: Lynn Lake Nickel-Copper-Cobalt Sulphide Project

    Lynn Lake Nickel-Copper-Cobalt Sulphide Project PROLIFIC HISTORICAL MINING CENTRE  100% controlled(1) by Corazon Renewed focus on  Big system – multiple orebodies Lynn Lake’s  Excellent infrastructure – power, water & township development potential DEVELOPMENT POTENTIAL  New JORC Resources (ASX

  19. Slide 19: Lynn Lake Nickel-Copper-Cobalt Sulphide Project

    Lynn Lake Nickel-Copper-Cobalt Sulphide Project HISTORICAL PRODUCTION MODERN DISCOVERIES A Plug Mine Tango - 2010 18Mt @ 0.88% Ni + 0.47% Cu 17m @ 0.6% Ni & 0.30% Cu EL Plug Mine A Plug Disco - 2008 1.9Mt @ 2.4% Ni + 1.15% Cu 18m @ 1.5% Ni, 0.70% Cu & EL Plug 0.04 %Co JORC RESOURCE EL Deeps - 2011 (

  20. Slide 20: Lynn Lake – New JORC Resource

    Lynn Lake – New JORC Resource RESOURCE UPSIDE WITHIN THE MINING CENTRE  11 deposits yet to be reviewed for remnant resources  Modern exploration has identified new untested targets JORC Base Cut Tonnes Tonnes Ni % Cu % Co % Category Ni % Ni Cu Co Indicated 0.5 12,899,000 0.7 0.33 0.034 89,700 42,9

  21. Slide 21: Lynn Lake - Processing Improvements

    Lynn Lake - Processing Improvements EXCEPTIONAL METALLURGICAL RESULTS ARE A “GAME-CHANGER” FOR THE PROJECT  For the first time, separate Copper and Nickel/Cobalt concentrates have been produced  Past processing and metallurgical work delivered a 10%-15% Nickel concentrate  New Nickel concentrate

  22. Slide 22: Corazon’s Exploration Success

    Corazon’s Exploration Success IN THE LAST TWO YEARS CORAZON HAS DISCOVERED TWO LARGE SULPHIDE SYSTEMS  Lynn Lake – Fraser Lake Complex – 2017  Nickel-copper-cobalt magmatic sulphide deposit  Looking for the massive sulphide feeder zone  Further drill testing required Fraser Lake - IP Chargeabili

  23. Slide 23: Competent Person Statement

    Competent Person Statement The information in this report that relates to Exploration Results and Targets is based on information compiled by Mr. Brett Smith, B.Sc Hons (Geol), Member AusIMM, Member AIG and an employee of Corazon Mining Limited. Mr. Smith has sufficient experience that is relevant t

  24. Slide 24: Contact

    CONTACT Level 1, 329 Hay St, SUBIACO WA 6008 PO Box 8187, SUBIACO EAST WA 6008 +61(8) 6142 6366 info@corazon.com.au www.corazon.com.au 1 24

Corazon Mining — RIU Conference 2019 on 6ix