Patel Engineering — Q1 FY26 Earnings Presentation

38 slides from Patel Engineering's earnings presentation, Aug 11, 2025

  1. Slide 1: Submission of Investor/Analysts Presentation (exchange cover letter)

    CIN: L99999MH1949PLC007039 August 11, 2025 To, BSE Limited The National Stock Exchange of India Limited Phiroze Jeejeebhoy Towers, Exchange Plaza, Dalal Street, Bandra - Kurla Complex, Mumbai - 400 001 Mumbai - 400 051 Company Code No. 531120 Company Code: PATELENG Dear Sir/Mam, Subject: Submission

  2. Slide 2: Patel Engineering Limited Investor Presentation Q1 FY26

    Patel Engineering Limited INVESTOR PRESENTATION Q1 FY26

  3. Slide 3: Disclaimer

    Disclaimer This presentation and the accompanying slides have been prepared by Patel Engineering Ltd. (the “Company”), and have been prepared solely for information purposes and do not constitute any offer, recommendation or invitation to purchase or subscribe for any securities, and shall not form

  4. Slide 4: Company Overview

    Company Overview Kiru Hydro Power Project, Jammu & Kashmir

  5. Slide 5: About Patel Engineering Ltd

    About Patel Engineering Ltd Patel Engineering Limited, founded in 1949 and headquartered in Mumbai, is a prominent player in the civil engineering construction segment. With over seven decades of experience, the company has successfully constructed various heavy civil engineering works such as dams,

  6. Slide 6: Vision & Mission

    Conference Centre cum Secretariat Complex, Bhutan Vision & Mission Vision Mission Deliver comprehensive and effective solutions to To be the pioneers in the industry and a market- clients through our profound experience and driven organization known for its commitment technological prowess, while co

  7. Slide 7: Key Facts and Figures

    Key Facts and Figures 7+ Decades 15 States 15,000+ 87+ Experience Current Domestic Presence MW Hydro Project Dams 300+ Kms 5.5+ Lakhs 1,200+ Kms ₹ 1,62,854 Mn of Tunnels Acres Irrigated Road Order book ₹ 12,334 Mn ₹ 1,653 Mn 13.40% ₹ 751 Mn Q1 FY26 Revenue Q1 FY26 Op. EBITDA Q1 FY26 Op. EBITDA Margi

  8. Slide 8: Market Potential and Opportunities

    Market Potential and Opportunities ₹ 11.21 Lac Cr 15,000+ MW 66,000+ MW Infrastructure Sector Budget 3.4% of GDP Hydro Projects Arunachal Pradesh Pumped Storage Projects Under Survey & Investigation 6,000+ MW ₹ 6,70,000 Mn ₹ 82,598 Mn Hydro Projects Budget Allocation for Budget Allocation for Pradha

  9. Slide 9: Consolidated Results Highlights

    Consolidated Results Highlights Operating Revenue (₹ in Mn) Op. EBITDA (₹ in Mn) Net Profit (₹ in Mn) 15.31% 12,334.45 750.92 1,686.49 1,653.33 11,016.59 481.69 Q1 FY25 Q1 FY26 Q1 FY25 Q1 FY26 Q1 FY25 Q1 FY26 Investor Presentation Q1 FY26 8

  10. Slide 10: Q1 FY26 Consolidated Results Highlights

    Q1 FY26 Consolidated Results Highlights Particulars (₹ in Mn) Q1 FY26 Q1 FY25 Y-o-Y FY25 Total Revenue from Operations 12,334.45 11,016.59 11.96% 50,933.59 Cost of Material Consumed 3,216.60 2,162.00 9,019.47 Cost of Construction 6,040.50 5,375.33 27,926.76 Employee Expenses 913.99 911.73 3,827.91 O

  11. Slide 11: Standalone Results Highlights

    Standalone Results Highlights Operating Revenue (₹ in Mn) Op. EBITDA (₹ in Mn) Net Profit (₹ in Mn) 15.31% 12,244.90 681.63 694.79 10,824.39 1,612.83 1,587.99 Q1 FY25 Q1 FY26 Q1 FY25 Q1 FY26 Q1 FY25 Q1 FY26 Investor Presentation Q1 FY26 10

  12. Slide 12: Q1 FY26 Standalone Results Highlights

    Q1 FY26 Standalone Results Highlights Particulars (₹ in Mn) Q1 FY26 Q1 FY25 Y-o-Y FY25 Total Revenue from Operations 12,244.90 10,824.39 13.12% 50,076.45 Cost of Material Consumed 3,216.60 2,162.00 9,019.10 Cost of Construction 6,030.42 5,286.85 27,587.53 Employee Expenses 913.12 909.76 3,822.73 Oth

  13. Slide 13: Consolidated Debt Highlight

    Consolidated Debt Highlight In ₹ Mn FY25 Q1 FY26 FY25 Q1 FY26 6,645 6,179 10,015 6,010 9,806 5,466 Total Debt + Total Debt + Total Debt Total Debt 16,025 15,272 Advances Advances 22,670 21,451 16,025 15,272 Term Debt Working Capital Debt Term Debt Working Capital Debt Total Debt Contractee Advance T

  14. Slide 14: Consolidated Interest Breakup

    Consolidated Interest Breakup In ₹ Mn In ₹ Mn Q4 FY25 Q1 FY26 Q1 FY25 Q1 FY26 179.26 153.87 192.38 153.87 Total Total Total Total Interest Interest Interest Interest 788.47 120.12 730.64 841.00 730.64 120.12 427.68 190.40 181.53 456.65 501.37 456.65 Interest to Lenders Interest to Lenders Interest t

  15. Slide 15: Working Capital Movement

    Working Capital Movement Net Working Capital ( In Days ) 297 194 168 160 169 168 145 127 104 110 110 96 FY21 FY22 FY23 FY24 FY25 Q1 FY26 Net Working Capital Adjusted Net Working Capital Adjusted Net Working Capital excludes borrowings, arbitration claims, current investment, cash & bank balance and

  16. Slide 16: Long Term Rating

    Long Term Rating: Rating Agency Infomerics India Ratings Current Rating A- A- (Long Term) Current Rating A2+ A2+ (Short Term) Outlook Stable Stable A- Last Review 04 June, 2025 28 April, 2025 BBB + BBB BBB - B+ FY21 FY22 FY23 FY24 FY25 Investor Presentation Q1 FY26 15

  17. Slide 17: Q1 FY26 Operational Highlights

    Q1 FY26 Operational Highlights Mantalia Tourist Facility, Jammu & Kashmir

  18. Slide 18: Key Operational Highlights

    Key Operational Highlights • Completion of the 155-meter Surge Shaft having a massive diameter of 24- meter • Completion of Power House Unit-1 - Machine Hall Slab • Recognized by SAPDC for achieving 29 Million safe man-hours as of 31st December 2024 Arun - III Hydropower Project in Nepal: • Breakthr

  19. Slide 19: Key Operational Highlights

    Key Operational Highlights • Invert Lining: Completed 3,571 meters out of the total 4,080 meters • Kerb Lining: Completed 3,415 meters out of 4,080 meters • Overt Lining: Completed 3,086 meters out of 4,080 meters Tunnel T-7 Project in West Bengal & Sikkim • Completed 1,972 meters of tunneling and a

  20. Slide 20: Key Operational Highlights

    Key Operational Highlights • Completed all civil work for the 12.5 km water conductor system. Subansiri Hydropower Project in Arunachal Pradesh • Conferred with the “Quality Innovation Award 2025” by the Institution of Engineers (India) Safety & Quality Forum.. PG(RW) Water Tunnel Project in Maharas

  21. Slide 21: Recent order wins

    Recent order wins Hydropower Project Urban Infrastructure Project Irrigation Project Project Name: 240 MW HEO Hydropower Project. Project Name: Construction of Kondhane Dam and Project Name: Nira Deoghar Right Bank Main Canal its allied works. Km 87 to Km 135. Project Location: Arunachal Pradesh. Pr

  22. Slide 22: Order Book Break Up

    Order Book Break Up Swarakuddu HEP, Himachal Pradesh

  23. Slide 23: Strong Order Book

    Strong Order Book CAGR: 7.75% 2,08,067 1,86,630 1,62,854 1,50,110 1,52,176 1,44,660 1,31,840 c 1,02,150 FY19 FY20 FY21 FY22 FY23 FY24 FY25 Q1 FY26 Q1 FY26 excludes One Project amounting to ₹ 2,400 Mn which has been converted to LoA in Q2 FY26. Investor Presentation Q1 FY26 22

  24. Slide 24: Order Book Break Up

    Order Book Break Up Segment Wise Order Book Client Wise Order Book Project Completion Wise Order Book 4.00% 6.67% 1.89% 9.81% 3.24% 7.17% 29.00% 36.23% 22.23% 19.67% 61.46% 60.53% 17.00% 21.10% Below 10% 10% - 30% 30% - 50% 50% - 70% 70% - 90% 90% - 100% Hydroelectric Irrigation Tunnel Road Others C

  25. Slide 25: Order Book Break Up: Ongoing Projects Across States

    Order Book Break Up 51 Ongoing Projects Across 15 States Domestically and an Jammu and Kashmir International Presence in Nepal with a Total Project Value of ₹ 1,62,854 Mn Himachal Pradesh Domestic In ₹ Mn. Sr.No. State No. of Projects Project Value Arunachal 1 Jammu & Kashmir 5 40,394 Sikkim Pradesh

  26. Slide 26: Major Projects Under Execution

    Major Projects Under Execution Subansiri Hydropower Project, Assam & Arunachal Pradesh Hydro Power Irrigation Tunneling Road o Subansiri HEP (2,000 MW) o Rihand Micro Irrigation Project o Amarmahal to Trombay Tunnel o Katraj Kondwa Road o Dibang Multipurpose Project (2,880 o Sleemanabad Carrier Cana

  27. Slide 27: Major Project Under Execution - Hydro Power Projects

    Major Project Under Execution - Hydro Power Projects Dibang Multipurpose (2,880 MW) Subansiri HEP (2,000 MW) Kiru HEP (624 MW) KWAR HEP(540 MW) Kundah PSP (500 MW) Teesta VI HEP (500 MW) Shongtong HEP (450 MW) Luhri HEP (210 MW) Investor Presentation Q1 FY26 26

  28. Slide 28: Some Major Clients

    Some Major Clients RVNL-KTR Railway Project, Chattisgarh Investor Presentation Q1 FY26 27

  29. Slide 29: Industry Overview

    Industry Overview Parbati Hydropower Project, Himachal Pradesh

  30. Slide 30: India Power Industry Overview

    India Power Industry Overview Power Generation - A Prime Focus • Globally, India is the third-largest producer and consumer of electricity • As of June 2025, non-fossil fuel sources accounted for 237.7 GW, which represents a remarkable 49% of total installed power generation capacity. • Rising elect

  31. Slide 31: Hydro Power Overview

    Hydro Power Overview Share in Total Power Generation installed Capacity Hydro Power – a Keen Effort by the Government to Boost Energy Generation 2% • With a total installed capacity of 54.48 GW, India has surpassed Japan to become the fifth-largest hydropower producer • India’s hydropower potential

  32. Slide 32: Pumped Hydropower Storage (PHS)

    Pumped Hydropower Storage (PHS) PHS – a Key Facilitator of Variable Renewable Energy (VRE) in India • VRE such as wind and solar are being connected to the grid at a rapid pace owing to their low cost of installation and the thrust on sustainable & green energy • Due to dependency of VRE on time / s

  33. Slide 33: Micro Irrigation The Way Forward

    Micro Irrigation The Way Forward Importance of Micro Irrigation • Micro-irrigation increases water efficiency by as much as 50%-90% • Water savings are in the range of 30-50% compared to flood irrigation, with an average of 32.3% • Electricity consumption is drastically reduced • Micro-irrigation sa

  34. Slide 34: Management Overview

    Management Overview Sela Road & Tunnel Project, Arunachal Pradesh

  35. Slide 35: Professional & Experienced Board of Directors

    Professional & Experienced Board of Directors Janky Patel Kavita Shirvaikar Kishan Lal Daga Chairperson & Non-Executive Managing Director Whole Time Director Director Ms. Janky Patel, a BA graduate, represents the Promoter group Mrs. Kavita Shirvaikar, a Chartered Accountant and ICWAI Mr. Kishan Dag

  36. Slide 36: Way Forward

    Way Forward Tunnel T-15 / Part T-14 Project, Jammu & Kashmir

  37. Slide 37: Unlocking Growth Potential: Key Investment Highlights

    Unlocking Growth Potential: Key Investment Highlights Extensive 75+ years experience with a solid track record of executing 01 prestigious and strategically significant infrastructure projects in India Well-positioned to leverage leading position in the hydroelectric, 02 pumped storage and tunneling

  38. Slide 38: Thank You

    For further information, please contact: Company : Patel Engineering Ltd. (BSE: 531120 | NSE: PATELENG) Mr. Aditya Bajaj Investor Relation & Marketing Email: investors@pateleng.com Investor Relations Advisors : MUFG Intime India Private Limited A part of MUFG Corporate Markets, a division of MUFG Pe