Rokmaster Resources Corp. · TSXV:RKR

Rokmaster Resources — Investor Presentation (August 2018)

20 slides from Rokmaster Resources's investor presentation, August 2018

  1. Slide 1: Duncan Lake Zinc-Lead-Silver Project

    Slide 1: Duncan Lake Zinc-Lead-Silver Project

    ROKMASTER RESOURCES CORP. Duncan Lake Zinc-Lead-Silver Project  New Zinc Mine Potential in the Kootenays, B.C. www.rokmaster.com TSX.V: RKR August 2018

  2. Slide 2: Cautionary Statement

    Slide 2: Cautionary Statement

    CAUTIONARY STATEMENT This presentation contains “forward-looking information” within the meaning of applicable Canadian securities regulations and “forwarding-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, “forward-looking

  3. Slide 3: Why Duncan Lake?

    Slide 3: Why Duncan Lake?

    WHY DUNCAN LAKE? Higher grade Discovery by First-rate targets Opportunity intersections Cominco “…there is room for 16 (estimated true thickness) • Drilled from 1989-1997 • Open on strike - down MMT at 10% Zn.” over a 650 meter strike dip, on plunge, along Cominco-D.Moore,1997 length both limbs of t

  4. Slide 4: Why Duncan Lake?

    Slide 4: Why Duncan Lake?

    WHY DUNCAN LAKE? 100% Outright Ownership • RKR claims total 3,938h. Teck (Cominco) mineral tenures of interest over the Property expired in 2015. Drill Ready • Fully permitted to drill. All drilling will be onshore. Existing Cominco drill holes may also be re-entered. Untested Targets • 15 km of ant

  5. Slide 5: Experience Where It Counts

    Slide 5: Experience Where It Counts

    EXPERIENCE WHERE IT COUNTS President & CEO John Mirko has over 30 years of personal experience in the Kootenays. He first examined Duncan Lake in 1982 with fellow RKR Director Mel de Quadros, Ph.D, P. Eng., when looking for silver and gold adjacent to the historic Cominco workings. Mr. Mirko is fami

  6. Slide 6: Mineral Claim Ownership

    Slide 6: Mineral Claim Ownership

    MINERAL CLAIM OWNERSHIP Property Purchase • 2.4M shares @ $0.25 for 100% (issued) • +3900 hectares of contiguous mineral claims o +2.4M Special Warrants exercise on 3MMT 6% Zn+Pb Eq. mineral resource (Zn+Pb Eq. undefined) o +2.4M Special Warrants exercise on 6MMT 6% Zn+Pb Eq. mineral resource (Zn+Pb

  7. Slide 7: Location, Access, Infrastructure

    Slide 7: Location, Access, Infrastructure

    LOCATION, ACCESS, INFRASTRUCTURE North end of the “Kootenay Arc” • Located 2.5 km north of the historic resource at Teck’s Duncan Mine prospect • In excess of 50 million tons of zinc-lead- silver ores mined from 10 past producing deposits including: Grandview-Metaline, Reeves MacDonald, Jersey-Emera

  8. Slide 8: Local Geology

    Slide 8: Local Geology

    LOCAL GEOLOGY Geology • Additional mineral occurrences on other folds/limbs in the area • Anticline formation folded repeatedly in the same region • Steeply dipping tabular mineralized zones (stratiform and stratabound silicified Badshot Formation) typically +/- 900m long x 180m high and up to 30m t

  9. Slide 9: Historic Duncan Mine Prospect

    Slide 9: Historic Duncan Mine Prospect

    HISTORIC DUNCAN MINE PROSPECT • Teck Resources maintains the historic Duncan Mine prospect, a 275 hectare claim group surrounded by Rokmaster’s Duncan Lake Project • Drilling, underground development and metallurgical studies were conducted on Duncan Mine between 1957 – 1961 • Grades intersected on

  10. Slide 10: Zone 6 - North Extension

    Slide 10: Zone 6 - North Extension

    ZONE 6 - NORTH EXTENSION New Data and Untested Targets • The No.6 zone in Teck’s Duncan Mine prospect continues onto Rokmaster’s property, with increasing grade (1.52m @ 8.01% Zn + 3.25% Pb) • No drilling north from this location (2.5 km north to section C) appears to have tested the apparent No.6 z

  11. Slide 11: RKR Property – Cross Section B

    Slide 11: RKR Property – Cross Section B

    RKR PROPERTY – CROSS SECTION B www.rokmaster.com TSX.V: RKR 11

  12. Slide 12: 1989 – 1997 Cominco Drill Sites

    Slide 12: 1989 – 1997 Cominco Drill Sites

    1989 – 1997 COMINCO DRILL SITES On Sections A-C Cominco drilled 8,334 meters before stopping all zinc exploration in southeast BC due to low metal prices and the pending takeover by Teck Resources Above: Looking West across Duncan Lake towards Howser Below: Duncan Peninsula looking NW to Jubilee Poi

  13. Slide 13: Cominco Drill Intersections

    Slide 13: Cominco Drill Intersections

    COMINCO DRILL INTERSECTIONS Estimated True Thickness Hole ID From (m) To (m) Core Length (m) Zn (%) Pb (%) (m) C89-5 551.00 565.23 14.23 12.2 5.21 3.10 and 553.00 561.00 8.00 6.9 7.10 4.60 and 570.50 577.80 7.30 6.3 4.54 1.50 including 576.00 577.80 1.80 1.5 9.40 0.43 C89-6 603.48 609.00 5.52 4.7 7.

  14. Slide 14: 2018 Drill Plans

    Slide 14: 2018 Drill Plans

    2018 DRILL PLANS Drill Targets: Sec. D – Step out drilling testing strike to the North • Extend the widespread zinc-lead mineralization northwards toward Jubilee Point • The first drill hole set-up will be 350 meters north of Section C, targeting the thicker crest areas of extensions to Zones 6, 7 a

  15. Slide 15: Project Advancement

    Slide 15: Project Advancement

    PROJECT ADVANCMENT Blue Sky: Exploration potential >30 MMT * • +15 km of anticline crest, the majority untested by drilling • Extension of select historic holes on Sec. A – C directionally to intersect anticline crest areas of thicker mineralization • New holes testing Western Limb and No. 6 zone ex

  16. Slide 16: The Team

    Slide 16: The Team

    THE TEAM Directors and Management Advisors and Consultants R.A. (Bob) Lane Michael Cowin M.Sc., P. Geo. Chairman & Director Geological Advisor and Consultant John Mirko Ted Muraro President, CEO & Director P. Eng. Special Geological Advisor and Consultant David Moore P.Geo. Harvey Tremblay Director

  17. Slide 17: Zinc Uses

    Slide 17: Zinc Uses

    ZINC USES Statistics • 50% of the world’s Zinc goes into construction • The transport sector accounts for nearly 25% of global zinc consumption • Consumer goods, including electrical and electronic appliances, account for 25% • Industrial machinery accounts for 10% of world Zinc production Applicati

  18. Slide 18: Tightening Zinc Metal Market

    Slide 18: Tightening Zinc Metal Market

    TIGHTENING ZINC METAL MARKET Declining Inventories Zinc Price Forecasts: Smashed • Inventories are near a 5 year low • Wood Mackenzie, a leading research firm has a peak price target of $4000 US/tonne, or $1.80/lb in 2018 Falling Mine Production • Bank of Montreal has forecasted an average price of

  19. Slide 19: Share Structure & Contact

    Slide 19: Share Structure & Contact

    SHARE STRUCTURE & CONTACT Trading Symbols: Address: RKR (TSX.V) 900-580 Hornby Street Vancouver, B.C., V6C 3B6 RKMSF (OTC: Pink) Canada 1RR (Frankfurt) Contact: Phone: 604-632-9602 Shares Outstanding: Email: info@rokmaster.com Web: www.rokmaster.com Free Trading: 20, 974, 661 Options: 1,853,000 Onli

  20. Slide 20: Ready to receive drill core

    Slide 20: Ready to receive drill core

    Ready to receive drill core A New Beginning at Duncan. www.rokmaster.com TSX.V: RKR

Source: Internet Archive copy of rokmaster.com

More decks from Rokmaster Resources Corp.

All 22 Rokmaster Resources decks