  1. Slide 1: Corporate Update with focus on the Gold – Polymetallic Revel Ridge Project

    Slide 1: Corporate Update with focus on the Gold – Polymetallic Revel Ridge Project

    ROKMASTER RESOURCES CORP. TSX.V: RKR OTCQB: RKMSF FSE: 1RR1 Corporate Update with focus on the Gold – Polymetallic Revel Ridge Project “British Columbia’s largest undeveloped high-grade precious & polymetallic deposits” October 2023 J www.rokmaster.com

  2. Slide 2: Cautionary Statement

    Slide 2: Cautionary Statement

    2 Cautionary Statement This presentation contains “forward-looking information” within the meaning of applicable Canadian securities regulations and “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, “forward-looking i

  3. Slide 3: The Team

    Slide 3: The Team

    3 The Team John Mirko President, CEO & Director Michael (“Mike”) Cowin Chairman & Director Adam Pankratz, MBA, MA Director Dennis Cojuco CFO and Corporate Secretary Connor Malek VP of Exploration Mike Kordysz VP of Business Development and Strategy James (“Jim”) Oliver, Ph.D., P. Geo. Geological Con

  4. Slide 4: Share Structure

    Slide 4: Share Structure

    4 Share Structure Share Information: Trading Symbols: Issued and Outstanding 153,240,478 RKR (TSX.V) Warrants 35,097,824 RKMSF (OTCQB) Stock Options 11,105,000 1RR1 (Frankfurt) Broker Warrants 2,350,199 Contact: Share Ownership: General: • Insiders, family & close associates ~ 30% Email: info@rokmas

  5. Slide 5: Revel Ridge Project – 14,715 Ha

    Slide 5: Revel Ridge Project – 14,715 Ha

    5 Revel Ridge Project – 14,715 Ha • 40 km north of Revelstoke with year- round road access • >3 km of operational underground workings • Mining equipment, underground & surface facilities, 40-person camp, rail load out yard in Revelstoke • Surface drilling permits in place until 2025 • Positive meta

  6. Slide 6: 2023 Mineral Resource Estimate ("MRE")

    Slide 6: 2023 Mineral Resource Estimate ("MRE")

    6 2023 Mineral Resource Estimate (“MRE”) *see footnotes 1-6 2023 Mineral Resource Estimate: Main, Hanging Wall, Foot Wall, NW Extension and Yellowjacket Zones: Measured & Indicated (M&I): 7,156,200 t / 1,526,000 ounces AuEq @ 6.63 g/t AuEq* Inferred (Inf): 7,563,900 t / 1,486,800 ounces AuEq @ 6.11

  7. Slide 7: Footnotes 1 - 6

    Slide 7: Footnotes 1 - 6

    7 Footnotes 1 - 6 (1) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. (2) The Inferred

  8. Slide 8: Measured, Indicated and Inferred Gold Equivalent Resources

    Slide 8: Measured, Indicated and Inferred Gold Equivalent Resources

    8 Measured, Indicated and Inferred Gold Equivalent Resources – Effective date June 6, 2023 *see footnotes 1-6

  9. Slide 9: Geology and Mineralization

    Slide 9: Geology and Mineralization

    9 Geology and Mineralization • MDZ (Main Deformation Zone) is a remarkably continuous, large, planar, ductile deformation zone associated with four mineralized orogenic gold zones. • The largest, RRMZ (Main Zone), averages 6-8 g/t AuEq over 2.5 m True Width • RRYZ (Yellowjacket Zone) stacked subpara

  10. Slide 10: Geology and Mineralization

    Slide 10: Geology and Mineralization

    10 Geology and Mineralization • MDZ has been defined to have a minimum strike length of 5.7 km, by mapping, drilling, and geochemistry • Wide open at depth • Denser drilling over ~2.0 km of strike length defines the current 2023 Mineral Resource Estimate • ~65% of the known length of the MDZ require

  11. Slide 11: Geology and Mineralization

    Slide 11: Geology and Mineralization

    11 Geology and Mineralization • Roseberry: 4 historical adits hosting gold mineralization: Potential northwestern extension of MDZ • A&E: 3 historical adits hosting Au-Ag- Pb-Zn mineralization • Zinc Creek: Southeastern extension of the MDZ

  12. Slide 12: Main Zone (RRMZ) Style Mineralization

    Slide 12: Main Zone (RRMZ) Style Mineralization

    12 Main Zone (RRMZ) Style Mineralization DDH RR20-11: 288.6 m to 294.77 m 288.64 – 290.47 • 1.83 m @ 9.54 g/t Au, 75.66 g/t Ag, 3.81% Pb, 10.91% Zn (14.73 g/t AuEq) 288.64 – 292.56 • 3.92 m @ 5.28 g/t Au, 43.22 g/t Ag, 1.95% Pb, 6.96% Zn (8.41 g/t AuEq) 286.40 – 294.77 • 8.37 m @ 2.76 g/t Au, 23.35

  13. Slide 13: Yellowjacket Zone (RRYZ) Style Mineralization

    Slide 13: Yellowjacket Zone (RRYZ) Style Mineralization

    13 Yellowjacket Zone (RRYZ) Style Mineralization  Ag – Zn hosted by deformed marble.  Predictable deformational style, recumbent folds.  Target structural periodicity.  Target million tonne Ag – Zn shapes.

  14. Slide 14: Yellowjacket Zone 2023 Drilling

    Slide 14: Yellowjacket Zone 2023 Drilling

    14 Yellowjacket Zone 2023 Drilling (July 17 and Aug 8, 2023 NR) RRYZ AuEq and AgEq: See Footnotes 1 – 6 in Slide 7

  15. Slide 15: 2020 PEA Highlights

    Slide 15: 2020 PEA Highlights

    15 2020 PEA Highlights* (using pre-RKR drilling and metallurgy)  High-grade underground mine - Mill-feed averaging $300/T NSR value (diluted) - Based only on all drilling up to 2012, no optimization  Years 1-4 mill-feed will average $400/T NSR (diluted)  After-tax NPV5.0% of C$423M and 29.5% IRR

  16. Slide 16: 2022 Groundbreaking Metallurgical Solution

    Slide 16: 2022 Groundbreaking Metallurgical Solution

    16 2022 Groundbreaking Metallurgical Solution  For more than two years, Rokmaster has undertaken numerous metallurgical tests to advance the flowsheet from an initial overall gold recovery of 74.3%  Recent metallurgical test work and repeatable Locked Cycle Tests (“LCT”) provided an updated flowsh

  17. Slide 17: 2023 Ore Sorting Testwork

    Slide 17: 2023 Ore Sorting Testwork

    17 2023 Ore Sorting Testwork (Sept 5, 2023 NR)  Initial ore sorting testwork was completed at Steinert US Inc. in 2023, using an X-Ray Transmission sensor to process two >500 kg representative batches of material.  At the fourth stage, where 50% of the feed was rejected, over 99% of the gold and s

  18. Slide 18: Development of Free Gold: Gold Zonation Late-Stage Quartz Gold Veins

    Slide 18: Development of Free Gold: Gold Zonation Late-Stage Quartz Gold Veins

    18 Development of Free Gold: Gold Zonation Late-Stage Quartz Gold Veins at Deeper RRMZ  DDH RR21-40 cored a 4 m intercept, 460 m vertically below the 830 m level of Main Zone with: 11.55 g/t Au and 0.021 % As over a 3 m interval  Decrease in As content two orders of magnitude below deposit average

  19. Slide 19: Fosterville Deposit compared to Revel Ridge at same scale

    Slide 19: Fosterville Deposit compared to Revel Ridge at same scale

    19 Fosterville Deposit compared to Revel Ridge at same scale

  20. Slide 20: 2022 Drilling: RRMZ – RRYZ Northwestern Expansion at deeper levels

    Slide 20: 2022 Drilling: RRMZ – RRYZ Northwestern Expansion at deeper levels

    20 2022 Drilling: RRMZ – RRYZ Northwestern Expansion at deeper levels AuEq: See Rokmaster news release dated December 5, 2022

  21. Slide 21: Future Drilling – Testing km-scale expansion

    Slide 21: Future Drilling – Testing km-scale expansion

    21 Future Drilling – Testing km-scale expansion AuEq: See Footnotes 1- 6 in Slide 7

  22. Slide 22: Corporate and Exploration Highlights 2020-2023

    Slide 22: Corporate and Exploration Highlights 2020-2023

    22 Corporate and Exploration Highlights 2020-2023  2020-2021 Completed first pass drill program 16,395 m, 75 - 80% hits, expansion of RRMZ at depth  Identify free gold; quantum change in metal?  2021 summer drilling 10,753 m, test new Au volumes, > 5 km of RRMZ trend.  NW expansion of RRYZ  202

  23. Slide 23: Corporate Objectives - 2023

    Slide 23: Corporate Objectives - 2023

    23 Corporate Objectives - 2023  Update MRE  Grow deposit size to > 3 M oz AuEq  Continue drill testing RRMZ at depth, NW, and SE  Update PEA  Grow interest of select investors and potential partners  Continue engineering, permitting and optimize processing to Pre-Feasibility level.  Continue

  24. Slide 24: Revel Ridge: the Right Targets = Keep Exploring

    Slide 24: Revel Ridge: the Right Targets = Keep Exploring

    Revel Ridge: the Right Targets = Keep Exploring 24 38,540 m drilled in 2020-2022 with a single drill rig resulting in rapid growth of Mineral Resource. More to come

  25. Slide 25: RKR Tier One Pipeline

    Slide 25: RKR Tier One Pipeline

    25 RKR Tier One Pipeline  PEA Stage: Orogenic Au - Revel Ridge: 1.53 million ounces AuEq (M&I) + 1.49 million ounces AuEq (Inf.) – Good growth potential, Including 10’s km exploration targets (see footnotes 1-6 in slide 7)  Advanced Prospect: Carbonate Replacement Deposit style – Duncan Lake: Zn-P

  26. Slide 26: RKR Project Pipeline: Duncan Lake CRD Ag/Zn

    Slide 26: RKR Project Pipeline: Duncan Lake CRD Ag/Zn

    26 RKR Project Pipeline: Duncan Lake CRD Ag/Zn  Major metallogenic belt, dozens mines & occurrences, Kootenay Arc carbonate replacement deposit style (“CRD”) Zn-Pb-Ag  Duncan Lake – President zonation Zn to Ag  6 major Zn - Ag occurrences on RKR property  Road access, excellent infrastructure 

  27. Slide 27: Duncan Lake Project: >1,700 m strike length of mineralized zones

    Slide 27: Duncan Lake Project: >1,700 m strike length of mineralized zones

    27 Duncan Lake Project: > 1,700 m strike length of mineralized zones northwest of historic Duncan Mine and >10 km regional targets

  28. Slide 28: Duncan Lake Project – Duncan Anticline Section B

    Slide 28: Duncan Lake Project – Duncan Anticline Section B

    28 Duncan Lake Project – Duncan Anticline Section B 2.0 km north of Duncan Mine C89-5: 7.1% Zn and 4.6% Pb over 8.0 m C91-7:11.4 % Zn and 0.8% Pb over 4.8 m C97-12: 6.2% Zn and 6.3% Pb over 7.5 m 2022: Three drillholes totaling 681.2 metres D22-02: 2.06% Zn, 2.56% Pb, and 8.38 g/t Ag over 20.85 m

  29. Slide 29: RKR Project Pipeline: Big Copper Sediment Hosted Cu - Ag

    Slide 29: RKR Project Pipeline: Big Copper Sediment Hosted Cu - Ag

    29 RKR Project Pipeline: Big Copper Sediment Hosted Cu - Ag  Cu demand: price escalation  Cu supply: exploration escalation  Known occurrence: 4.5 km Cu trend  Drill permit in application stage Cominco drilling, 1965: • 4.4 m of 3.30% Cu, within 29.7 m of 1.4% Cu (no Ag assays) • 4.1 m of 1.20%

  30. Slide 30: Revel North - Downie Gold Property

    Slide 30: Revel North - Downie Gold Property

    30 Revel North - Downie Gold Property

  31. Slide 31: Jack Denny at Downie Gold Property

    Slide 31: Jack Denny at Downie Gold Property

    31 Jack Denny at Downie Gold Property

  32. Slide 32: Revel North - Keystone Property

    Slide 32: Revel North - Keystone Property

    32 Revel North - Keystone Property