Alkane Resources Ltd · ASX:ALK

Alkane Resources — AMEC Convention 2017

22 slides from Alkane Resources's conference presentation, Jun 7, 2017

  1. Slide 1: Alkane Resources Ltd

    For personal use only www.alkane.com.au

  2. Slide 2: Alkane Resources Ltd – Multi Commodity Developer

    Alkane Resources Ltd Multi Commodity Developer For personal use only Focussed in the Central West NSW Two major projects through subsidiaries Australian Strategic Materials Ltd (ASM) • Dubbo Project Technology metals Tomingley Gold Operations Pty Ltd (TGO) • Tomingley gold production Cash flow gener

  3. Slide 3: Tomingley Gold Operations

    Tomingley Gold Operations For personal use only • Resource – 579,000oz of gold (22 Sept 2016) • Reserve – 253,000oz (22 Sept 2016) • Mine method – open cut W1, W3, C1 & C2 • Underground feasibility in progress • Mine Life – 4.5 years inclusive of undergound • Processing plant standard CIL 1.0Mtpa th

  4. Slide 4: Megatrends – Driving the next cycle

    Megatrends – Driving the next cycle For personal use only Internet of Transportation Things Clean Sustainability Energy Ageing Population Technology drivers • Faster • Smaller • Stronger • Lighter Urbanisation • Cleaner • Safer © 2017 Alkane Resources Ltd 4

  5. Slide 5: Collection of Big Data by Sensors & Actuators

    Collection of Big Data by Sensors & Actuators “Australian Strategic Materials & Alkane For personal use only can supply up to 19 critical elements” Connecting people and processes ubiquitously for Smart Systems and IoT © 2017 Alkane Resources Ltd Gold Silver Tantalum 5

  6. Slide 6: Emissions minimisation

    Emissions minimisation Zero or Low CO2 Emissions For personal use only Clean Power Energy • Wind • Solar • Nuclear • Wave • Thermoelectric Storage • Large capacity batteries • Ferroelectric • Solid oxide fuel cells • Portable batteries • Piezoelectrics © 2017 Alkane Resources Ltd 6

  7. Slide 7: Rare earth permanent magnets

    Rare earth permanent magnets For personal use only Global wind capacity to nearly double in next five years (2015-2020) In 2015 – 433GW (84,868t REE) In 2020 – 792GW (155,232t REE) Dubbo Project can support 1.4GW output • 196kg REE used per MW power in wind turbine NdFeB permanent magnets • Niobium

  8. Slide 8: Rare earths in auto transport

    Rare earths in auto transport For personal use only HYBRID NIMH BATTERY GLASS & MIRRORS LCD SCREEN HEADLIGHT GLASS • Lanthanum • Cerium • Europium • Neodymium • Neodymium • Yttrium • Cerium More than 100 magnet motors in one car* • Cerium 25+ ELECTRIC MOTORS ELECTRIC MOTORS * Source: Adamas Research

  9. Slide 9: Nuclear power demand still growing

    Nuclear power demand still growing 449 Operating nuclear plants For personal use only 60 Undergoing construction 170 Planned in China by 2050 Zirconium clads nuclear fuel rods Hafnium is used in nuclear control rods Zirconium niobium alloys © 2017 Alkane Resources Ltd 9

  10. Slide 10: Next gen transport applications

    Next gen transport applications • Zirconium & hafnium in jet engines – super alloys For personal use only • Niobium & hafnium in rocket nozzles – super alloys • Hafnium for thermoelectric applications – electricity generation • Hafnium in special space batteries Transportation • Heat shields © 2017

  11. Slide 11: Hafnium – next gen memory

    Hafnium – next gen memory For personal use only Permanent Memory Ferroelectric micro-processing using HfO2 • Ultra-fast, low-power, non-volatile successor to flash memory (atomic layer deposition) • HfO2 already used in electronics and compatible with silicon fabrication techniques • k-gate chips, f

  12. Slide 12: Dubbo Project

    Dubbo Project 400km northwest of Sydney For personal use only • • 25km from Dubbo city (pop~45,000) • Dubbo infrastructure – roads, rail, power, gas, light engineering, people • Large polymetallic resource - zirconium, hafnium, niobium (tantalum), yttrium and rare earths • Defined resource supports

  13. Slide 13: Separation Process

    Separation Process Process of sulphuric acid leach and solvent extraction separation For personal use only and chemical refining proved and products distributed to customers for evaluation and qualification © 2017 Alkane Resources Ltd 13

  14. Slide 14: Product Output

    Product Output For personal use only 6,664 tpa Rare earth chemical concentrate 95% REO (REO units) DP Process Plant 16,374 tpa Zirconium as ZBC (carbonate) & zirconia 99% ZrO2 (ZrO2 units) 50 tpa Hafnium as HfO2 concentrate HfO2 conc * (Hf units) 1,967 tpa Niobium as ferro-niobium 65% Nb (Nb units)

  15. Slide 15: Rare Earth Output

    Rare Earth Output For personal use only DP REE SX Toll treatment – off site Rare Earth Concentrates La2O3 1,441 tpa La / Ce CeO2 2,367 tpa Pr6O11 237tpa Pr / Nd Nd2O3 921tpa Sm2O3 112tpa Sm / Eu / Gd Eu2O3 3tpa Gd2O3 107tpa Tb / Dy / Ho / Er / Tb4O7 14tpa Tm / Yb / Lu Dy2O3 122tpa Y (2/3N) Ho2O3 22t

  16. Slide 16: Marketing and Off-take

    Marketing and Off-take Minchem – World wide zirconium product & For personal use only marketing/sales agreement. Treibacher Industrie AG - JV to produce & market ferro- niobium Vietnam Rare Earth (VRE) – LOI for the production and marketing of separated rare earth products, and down stream value add

  17. Slide 17: Modular Design – lowers risks

    Modular Design – lowers risks For personal use only Construction 2017 - 2019 Estimated cost US$480M --------------------- Construction 2022 - 2023 Estimated cost US$360M --------------------- Estimated total Cost US$840M Detail in ASX release 28 October 2016 © 2017 Alkane Resources Ltd 17

  18. Slide 18: Diversified products – lowers risks

    Diversified products – lowers risks Dubbo Project - product revenue split For personal use only Niobium 17% Magnet metals: Praseodymium, Neodymium, Dysprosium, Terbium, Samarium 25% Hafnium 10% Other rare earths, including Yttrium 5% Zirconium 42% *Stage 1 revenue US$200 - 220M Opex US$120 – 130M *e

  19. Slide 19: Dubbo – leading the next cycle

    Dubbo – leading the next cycle TGO continues to generate positive cash flow – strong recovery in production and For personal use only reduction in costs following rain impacted first half (FY17) DUBBO PROJECT IS CONSTRUCTION READY • Water and power supply arrangements well advanced • Progressing cus

  20. Slide 20: Disclaimer

    Disclaimer For personal use only This presentation contains certain forward looking statements and forecasts, including possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Alkane Resources Ltd, industry growth or other tre

  21. Slide 21: DP Resources and Reserves

    DP Resources and Reserves For personal use only Dubbo Project – Mineral Resources Toongi Tonnage ZrO2 HfO2 Nb2O5 Ta2O5 Y2O3 REO Deposit (Mt) (%) (%) (%) (%) (%) (%) Measured 35.70 1.96 0.04 0.46 0.03 0.14 0.75 Inferred 37.50 1.96 0.04 0.46 0.03 0.14 0.75 Total 73.20 1.96 0.04 0.46 0.03 0.14 0.75 The

  22. Slide 22: TGO Resources and Reserves

    TGO Resources and Reserves TOMINGLEY GOLD PROJECT MINERAL RESOURCES (as at 30 June 2016) MEASURED INDICATED INFERRED TOTAL For personal use only Total Gold DEPOSIT Tonnage Grade Tonnage Grade Tonnage Grade Tonnage Grade (Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Kt) (g/t Au) (Koz) Open Pittable Reso

Alkane Resources — AMEC Convention 2017 on 6ix