Cobre Limited · ASX:CBE

Cobre — 121 Mining Investment Conference Cape Town 2024

24 slides from Cobre's conference presentation, Feb 5, 2024

  1. Slide 1: Kalahari Copper Belt, Botswana

    Kalahari Copper Belt, Botswana For personal use only 121 Conference Cape Town ASX: CBE February 2024 This presentation has been approved by the CEO, Adam Wooldridge and Executive Chairman, Martin C Holland ASX: CBE

  2. Slide 2: Disclaimer

    Disclaimer Not for release to US wire services or distribution in the United States. For full exploration results including relevant JORC Table information and Competent Persons Statements referred to in this Company Presentation, refer to the Company’s announcements This investor presentation has b

  3. Slide 3: Agenda

    Agenda 01 Corporate Snapshot & Global Reach For personal use only 02 Kalahari Copper Belt Discovery Focussed Exploration 03 Tier 1 Exploration | In-situ Recovery | Target Drilling 04 Timelines 05 Wrap-up 3 121 Cape Town | February 2024 ASX: CBE

  4. Slide 4: Corporate Snapshot

    For personal use only 01 Snapshot Corporate

  5. Slide 5: Corporate Structure

    Corporate Structure As at 31/01/2024 Capital Structure Shareholder Structure For personal use only Share Price (as at 01/02/24) A$0.069 Shares on issue 286.9M 21.90% Strata Investment Holdings Market Capitalisation A$19.8M Holland International PTY LTD Cash Position1 (as at 31/12/23) A$1.93M 4.2% HS

  6. Slide 6: Fueling Copper's Future Growth

    Fueling Copper's Future Growth Robust Exploration and Development Pipeline for High-Quality Copper Resources For personal use only Strategic Global Land Package Global Presence with district-scale discovery opportunities. Sandiman Armada 51% Sediment hosted Exploration and 14.4% base metals Developm

  7. Slide 7: Kalahari Copper Belt

    For personal use only 02 Kalahari Copper Belt

  8. Slide 8: Why the Kalahari Copper Belt?

    Why the Kalahari Copper Belt? In 2023 KCB becomes a copper producing district: Khoemacau Copper Mine and exploration assets sold for 1.9 B$ to MMG 1; For personal use only Sandfire’s Motheo Production hub starts production in record time. KCB remains unexplored and is regarded as one of the world’s

  9. Slide 9: Strategic Land Position

    Strategic Land Position For personal use only 100%-ownership of highly-prospective copper and silver exploration tenements in the KCB. KML Kalahari Copper Belt Second largest tenement package in the KCB consisting of four Project Areas: Ngami Copper Project (727 km2), Kitlanya East (1,359 km2), Kitl

  10. Slide 10: Discovery: Three-Pronged Approach

    03 For personal use only Discovery Three-Pronged Approach to Discovery Focused Explore Big Identify the next tier 1 deposit with Exploration support from BHP Xplor Development Potential Prove viability for copper-silver extraction using in-situ recovery Target Drilling Potential for short-term disco

  11. Slide 11: Finding the Next Tier 1 Deposit

    Finding the Next Tier 1 Deposit Cobre is a cohort for the Big thinking discovery focussed 2024 BHP Xplor programme exploration with support from BHP through the Xplor Programme For personal use only Strategically located near the basin margin of the KCB - typically prioritised for sedimentary-hosted

  12. Slide 12: Ngami Copper Project: Scope for Development?

    Ngami Copper Project: Scope for Development? 40km Strike For personal use only of Copper Silver Mineralisation Consistent chalcocite mineralisation intersected along extensive strike lengths Structurally controlled high-grade intersections include: 9.3m @ 3.4% Cu 10.7m @ 1.3% Cu and 30g/t Ag and 18

  13. Slide 13: Ngami Copper Project Modelling Highlights

    Ngami Copper Project Modelling Highlights Significant Scale and Untested Upside For personal use only The estimates of tonnage and grade for exploration target category are conceptual in nature, there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exp

  14. Slide 14: Essential Criteria for In-Situ Copper Recovery

    Ngami Copper Project Essential Criteria for In-Situ Copper Recovery For personal use only Mineralisation suitable for Ore Body below Suitable Host Acid Leaching: Water Table: Rock Permeability Fine-grained chalcocite ideal for Water table at 130m to 140m below Detailed fracture logging, AI-driven hy

  15. Slide 15: In-Situ Copper Recovery: Controlling Fluid Movement

    In-Situ Copper Recovery : Controlling Fluid Movement: Fractures and seals NCP20A NCP18A For personal use only Stereonet plot of fractures = Dominant direction // Mineralisation Upper Fracture Zone Lower Fracture Zone Associated with primary mineralisation Fracture Zone Associated with primary minera

  16. Slide 16: In-Situ Copper Recovery: Ongoing Hydrogeological Work

    In-Situ Copper Recovery : Ongoing Hydrogeological Work Tests ISCR Model For personal use only Ongoing drilling of injection and monitoring wells Results will provide fluid flow model of connectivity and conductivity along mineralised fractures Early results demonstrate Connectivity of fracture zones

  17. Slide 17: Stage gated exploration

    For personal use only 04 Stage gated exploration

  18. Slide 18: Stage Gated Strategy to Advance Exploration and Development

    Stage Gated Strategy to Advance Exploration and Development Projects ISCR development Exploration target development 2024 For personal use only Injection Pump Testing Prioritise targets Complete hydrogeological drill programme Identify priority targets from geophysical, Model hydraulic properties an

  19. Slide 19: Indicative Exploration Timeline

    Indicative Exploration Timeline 2024 Q1 Q2 Q3 Q4 Ngami Copper Project For personal use only Hydrogeological pump tests and modelling ● Metallurgical column tests ● Preliminary economic scoping study ● Resource diamond drilling ● Kitlanya West Project Design follow-up programme to test ● for tier 1 t

  20. Slide 20: In Summary

    In Summary Strategic Global Land Package: vast land package, district-scale discovery opportunities for copper deposits. For personal use only Accelerated Development Potential in Botswana projects present discovery and copper development opportunities. Support from BHP through the 2024 Xplor Progra

  21. Slide 21: Appendix

    For personal use only Appendix

  22. Slide 22: Board of Directors

    Board of Directors Strong Leadership For personal use only Martin C Holland Adam Wooldridge Dr Ross McGowan Michael McNeilly Michael Addison Andrew Sissian Executive Chairman Chief Executive Officer Non-Executive Director Non-Executive Director Non-Executive Director Non-Executive Director Mr Hollan

  23. Slide 23: In Situ Recovery Comparisons

    In Situ Recovery Comparisons For personal use only Taseko Mines Limited Florence Copper Excelsior Mining Corp Gunnison Copper 363 mT @ 0.35% Cu (M+I)1 873mT @ 0.29% Cu (M+I)2 Pre-Tax IRR 49% Pre-Tax IRR 37.5% CAPEX US$232m CAPEX US$47.6m OPEX US$1.11 / lb OPEX US$1.23 / lb Est production 85m lb Cu /

  24. Slide 24: Thank you

    For personal use only Thank you For more information contact: www.cobre.com.au info@cobre.com.au His Excellency Mokgweetsi Masisi (President), Hon Lefoko Moagi (Minister of Mines), Her Excellency Ms Dorcas Kobela Makgato (High Commissioner to Australia) with Cobre’s CEO Adam Wooldridge and Chairman