Terrain Minerals Ltd · ASX:TMX
Terrain Minerals — Investor Presentation (May 2007)
25 slides from Terrain Minerals's investor presentation, May 16, 2007
Slide 1: Investor Presentation
Investor Presentation
Slide 2: Redcastle Project
Redcastle| Project
Slide 3: Legend
i LEGEND Granitoid Granitoid Greenstone Fault / Shear 42 Gold deposit {I Project Boundary ened Zz Exdudedarea | |
Slide 4: Great Western: Head Frame – Main Shaft
Slide 5: Great Western: Workings Looking East
Slide 6: NER ALS
NER ALS ERRAIN T M West ing x ° ° — ings Work
Slide 7: Great Western: Drilling Results
Great Western: Drilling Results GWRC052 GWRC054 GWRC057 GWRC058 GWRC059 GWRC060 GWRC062 GWRC064 GWRC066 GWRC072 GWRC073 43m - 50m 43m — 45m 85m — 87m 61m — 64m 117m — 138m 117m —-121m 134m -136m 47m — 51m 123m — 128m 119m — 123m 118m — 123m 88m —- 90m 143m — 145m 110m - 122m 110m - 112m 118m — 120m
Slide 8: ITT
ul a Mi He ITT ancl Wiis / Hina : a al 4 nnn
Slide 9: Cross Section 1455E
Cross Section 1455E
Slide 10: Cross Section 1320E
oa / ese | Litt in i LL I) Cross Section 1320E (workings projected onto section
Slide 11: Main Shaft
MAIN:SHAFT ©. 45 gramimetres MUx Main Lode HW = Hanging Wall
Slide 12: Bundarra Project
Bundarra Project Deposit Tonnes Grade (g/t Au) Ounces Celtic 1,087,677 1.66 58,050 Wonder North 1,978,328 2.13 136,541 TOTALS 3,066,005 1.96 194,591
Slide 13: HE
HE
Slide 14: ey Lapa pie
ey Lapa pie h i ae oo iy : ay ee i ee we alle a i Ye EB vl ye ee Le Can ae i: ON ye Ce So Q : ae a
Slide 15: Wonder North drill intercepts
WNRC198 WNRC199 WNRC 200 WNRC 204 WNRC 210 WNRC211 WNRC212 WNRC215 WNRC228 163m — 187m 162m — 216m 162m — 167m 150m — 162m 150 — 169m 120m — 134m 176m — 228m 224m ~ 228m 38m — 48m 63m — 69m 171m — 179m 24m @ 2.15g/t gold 54m @ 1.26g/t gold; inc 5m @ 3.51g/t gold 12m @ 2.78g/t gold 19m @ 2.43g/t gold
Slide 16: Wonder North Cross-Section 321650E
oe WONDER NORTH ee, Cross-Section 321650E TERRAIN Number of shatow N-S holes and Mane as dil intercepts inside open pit omitted
Slide 17: Hy ao ee
Hy ao ee
Slide 18: yo
yo
Slide 19: iil
iil Hs HFN ALON ai Ai i) el
Slide 20: Garden Well
GARDEN WELL 17m @ 1.94g/t gold from 5m 5m @ 2.27g/t gold from 19m 4m @ 3.81 from 30m CRAIG 6m @ 37.83g/t gold from 15m 4m @ 2.04g/t gold from 11m 6m @ 2.34g/t gold from 6m KATALINA 6m @ 3.83g/t gold from 12m 7m @ 2.86g/t gold from 00m 9m @ 2.31g/t gold from 10m 2m @ 25.60g/t gold from 58m
Slide 21: Met Prospectus Commitments and evaluated all accessible projects
« Met Prospectus Commitments and evaluated all accessible projects * Prioritised the projects and rationalised holdings to focus on most prospective areas + At Bundarra have control of an emerging “gold camp” + Within the “gold camp”, Terrain has a “pipeline of projects” Great Western high grade dep
Slide 22: Strategy Going Forward
Strategy Going Forward 1. Complete Reverse Circulation and Diamond Drilling at Wonder North and Great Western Deposits. RAB drill other prospects 2. Resource Estimates & Evaluate Development Options 3. Maintain other projects and/or sell/JV if a appropriate, to enable focus to remain on most prospec
Slide 23: Slide 23
Slide 24: Redcastle Mining Centre
Redcastle Mining Centre 2,400t @ 23.0g/t gold Shear hosted quartz vein systems | __ Major shear 26,2 26.2g/t gold g7esooonN
Slide 25: Slide 25